            GENERAL NOTES:
            1. ALL WORK ON THIS CONTRACT IS TO BE CARRIED OUT W ACCORDANCE WITH THE JOB SPECFKA71N AND TO THE SATISFACTION
                                                                                                                                                                                                                                                                                                                       DRAWING SCHEDULE
            OF THE LOCAL AUTHORITY AND THE ENGINEER,                                                                                            ASPHALT TYPE DGIO
                                                                                                                                                MINIMUM COMPACTED DEPTH
            2. THE CONTRACTOR IS TO CONTACT ENERGEX. TELSiRA. COUNCIL AND OTHER SERVICE AUTHORITIES AND LOCATE EXISTING                         30" ON HOT BITUMEN                                                                                                                                              10525 -C1      CIVIL WORKS NOTES AND
            UNDERGROUND SERVICES PRIOR TO CONSTRUCTION.                                                                                         PRIMER 0 1.0 I /mN.                                                                                                                                                            DRAWING SCHEDULE

            3. CONOUT LOCATIONS N SHOWN ON THE PLANS ARE PROVISIONAL ONLY AND THE CONTRACTOR IS TO LIAISE WITH THE ENGINKER,                                                                                                                                                                                    1052541        SITE FRONTAGE WORKS
            TELSTRA AND THE ELECTRICAL CONSULTANT FOR THEIR FINAL PLANS IMMEDIATELY PRIOR TO LAYING ROAD AND FOOTPATH
            (OMWIiS.
                                                                                                                                                                                                                                                                                                                               PLAN
            4. THE ENGIEERNG DESIGN IS BASED PARTLY ON A DATA TERRAIN MODEL COMPUTER GENERATED FROM THE SITE SURVEY AND SOME                                                                                                                                                                                    10525-(3       FRONTAGE WORKS
            ELEMENTS OF THE SURVEY DATA ARE INTERPOLATED AND MAY VARY FROM THE ACTUAL SITE CONDITIONS. THE CONTRACTOR                                                                                                                                                                                                          DETAILS
            SMALL LIAISE WITH THE ENGINEER AND SURVEYOR AND SET OUT TNF WORKS OILY FROM APPROVED REFERENCE PEGS AN LEVEL
            BENCH MARKS.
                                                                                                                                                                                                                                                                                                                10525-(4       BULK EARTHWORKS
            S. THE CONTRACTOR IS TO ORGANISE HIS WORKS SO THAT EROSION. DEPOSITION OF T. AND STORMNATER RUNOFF FROM IHE NOB                                                                                  COMPACTED SUBGRADE TO                                                                                             PLAN SHEET 1
            SITE DOES NOT EXCEED THE PRE (OISTRU(TDN RATES AT ANY PONT AS A RESULT OF HIS ACTIONS.                                              LEAN MIX PAVEMENT
                                                                                                                                                                                                             95% RELATIVE DENSITY
            6. (LEAR All VEGETATION FROM HOSE AREAS TO BE EXCAVATED OR FILLED. N OTHER AREAS WHERE CLEARING IS SPECIFIED.                       COPACTED N 200.0 LAYERS                                                                      s EXISTING PAVEMENT TO BE
            SELECTED (LLARING ONLY 5 TO BE CARRIED OUT BY RETANNG THOSE TREES MARKED BY THE ENGINEER AND LEAVING THE AREA                       TO 1N% RELATIVE DENSITY                                                                      CUT BACK UNTL FULL DEPTH
                                                                                                                                                                                                                                                                                                                10525-CS       BULK EARTHWORKS
            N A CONDITION SUITABLE FOR SLASHING                                                                                                                                                                                             PAVEMENT EXPDSED                                                                   PLAN SHEET 2
            7. THE CONTRACTOR IS TO PRESENT DP THE ANI FOR ON- MAINTENANCE AND OFF-MAT NTENANCE INSPECTIONS WHEN DIRECTED BY
                                                                                                                                                                                                                                                                                                                10525-(6       BULK EARTHWORKS
            THE ENGINEER WITH ALL PIPES. ROADS AND ALLOTMENTS FREE OF RUBBISH OR SILT AND WITH FOOTPATHS AND PARK AREA
            SLASHED OR MOWN. AND UIDERGROUA2 SERVICES OPENED FOR INSPECTION.
                                                                                                                                                                                  PAVEMENT JOINT DETAIL                                                                                                                        DETAILS
                                                                                                                                                                               ROAD WIDENING - DAVID LOW WAY
            0. NO WORK IS TO COMMENCE ON THE SITE UNTIL THE APPROVAL OF THE COUNCIL HAS BEEN RECEIVED N WRITING AND AN OFFICIAL                                                                                                                                                                                 1052547        LINEMARKING AND SIGNAGE
            PRE-START MEETING WITH A REPRESENTATIVE OF COUNCIL, AND THE ENGINEER HAVE BEEN HELD. THE CONTRACTOR IS TO OBTAIN                                                                                                                                                                                                       1T 3-VV ^i V1/^^
            A COPY OF THE MINUTES OF THE PRE-START MEETING AND SHALL COMPLY WITH ALL REQUIREMENTS THEREOF.

            9. ALL CONSIRUTION IS TO BE SET OUT BY THE CONTRACTOR FROM PEGGING OF ROAD CENTERlIE, MANHOLE POSITIONS, LOT                                                                                                                                                                                        10525-18       (ROSS SECTIONS AND ROAD
            STAKING AND TBMS PROVIDED BY THE PRINCIPALS LICENSED SURVEYOR.
                                                                                                                                                                                                                                                                                                                               LONGITUDINAL SECTION
            EARTHWORKS NOTES
                                                                                                                                                                                      E
                                                                                                                                                                                      E
            L CLEAR All. VEGETATION FROM THOSE AREAS TD BE EXCAVATED OR FLIED. ALL RUBBISH INCLUDING DEBRIS FROM CLEARING IS TO
            BE DISPOSED IN   ACCORDANCE WITH THE STANDARDS OF THE LOCAL AUTHORITY. BURNING WILL NOT BE ALLOWED                                                                            ASPHALT TYPE DG10 MINIMUM COMPACTED DEPTH
                                                                                                                                                                                                                                                                                                                     THESE DRAWINGS ARE TO BE READ N CONJUNCTION
                                                                                                                                                                                          30mm ON HOT BITUMEN PRIMER 0 1.0 I /m2.
            2. ALL ORGANIC MATERIAL. TOPSOIL, AND UNSUITABLE SUBGRADES ARE TO BE STRIPPED FROM THE AREA TO BE FILLED AND                                                                                                                                                                                             WITH CfOTECHNI(AL REPORT No. 001-16DA
            REMOVED FROM THE SITE      EXCEPT THAT SUFFICIENT TOPSOIL IS TO BE RETAINED FOR RESPREADING TO A MINIMUM DEPTH Of 100mm                                                                                                                                                                                  BY    BUTLER PARTNERS PTY. LTD.
            ALL OVER THE SITE AFTER FILLING TO LEVEL     WITH IMPORTED FILL. AFTER STRIPPING AS ABOVE THE WHOLE SITE IS TO BE                                                                                                                                                                                        DATED APRIL 2010
            COMPACTED AND PROOF ROLLED TO THE SATISFACTION Of THE                                                                                                                         BASE COURSE UNBOUND PAVEMENT TYPE 2.3. ICBR LSI
                                                                         GEOTECHNICAL CONSULTANT PRIOR TO PLACING OF IMPORTED FILL.
                                                                                                                                                                                          MIN. COMPACTED THICKNESS: 125mm. MIN. COMPACTION: 100% ROD.
            3. FILLING IS TO BE CARRIED OUT IN CONTROLLED LAYERS NOT TO EXCEED 200" DEPTH BY 2500 m'. EACH LAYER IS TO BE
            COMPLETELY COMPACTED TO
            A MINIMUM OF 95% RELATIVE DRY DENSITY FOR COHESIVE SOILS OR A MINIMUM DENSITY INDEX OF 70% FOR NON-COHESIVE SOILS AND                                                         SUB BASE (OURSE: UNBOUND PAVEMENT TYPE 2.3. ICBR 45)
            TESTED AND       APPROVEO BY THE GEOTECHNICAL CONSULTANT PRIOR TO THE PLACEMENT OF THE NEXT LAYER. THE TOP 300mm Of                                                           MIN. -COMPACTED THICKNESS: 12Smm. AN. COMPACTION: 100% ROD).
            THE ROAD SUOGRADE I5 TO BE      COMPACTED 10 A MINIMUM OF 98% RELATIVE DRY DENSITY.
                                                                                                                                                                                          LOWER StH BASE COURSE: INBOUND PAVEMENT TYPE 1.5. ICBR 15)
            4. THE WHOLE OF THE MATERIAL IN ANY PARTICULAR LAYER SHOULD BE HOMOGENOUS, AND IF NECESSARY SMALL QUANTITIES OF                                                               THICKNESS AS INSTRUCTED. MN. COMPACTION 100% ROD.
            FILL DIFFERING FROM THE     REST SHOULD BE SPREAD AS A THIN LAYER OVER THE WHOLE SITE AND INCORPORATED INTO A FULL                                                            !PRDVSIO.SAL                                       .-- -.,
            LAYER. IN A NT/FILL SITUATION THE     GEOTECHMCAL CONSULTANT MAY DIRECT THAT ANY EXISTING SOIL WITHIN 600mm OF THE
            FINISHED SURFACE LEVEL BE REMOVED AND REPLACED WITH       FILL EQUIVALENT TO THE GENERAL FILL MATERIAL. THE MATERIAL SO
            REMOVED MAY, F IT OTHERWISE MEETS THE SPECIFICATION, BE USED AS GENERAL                                                                                                       NATURAL SUBGRAU MN. 95% ROD FOR FILL PLACED TO WITHIN 300" OF LEVEL AND 97% R00 FOR THE TOP 300" BELOW THE
                                                                                          FILL AS ABOVE.
                                                                                                                                                                                          FINISHED SUBGRADE LEVEL.
            S. IMPORTED FILL IN ALLOTMENTS IS TO CONSIST OF IDFDGENOUS MATERIAL CONTINUOUSLY GRADED WITH A MAXIMUM PARTICLE SIZE
            OF 100", A      MAXIMUM LINEAR STNN(AGE OF 8%, AND A MOISTURE CONTENT BETWEEN -2% TO r2% OF OPTIMUM MOISTURE
            CONTENT AT THE TIME OF COMPACTION.      IMPORTED FILL IN ROADWAYS IS TO CONSIST OF HOMOGENOUS MATERIAL CONTINUOUSLY
            GRADED WITH A MAXIMUM PARTICLE SIZE OF 100nm, A MINIMUM      (BR OF B. AND A MOISTURE CONTENT BETWEEN -2% TO e2% OF                                                      o       M             K.N. DEPTH TO BE DETERPIALD 3° LID ENGINEER AFTER 115111NG OF THE INSITU SUB-GRADE.
            OPTIMUM MOISTURE CONTENT AT THE TIME Of COMPACTION.

            6. THE CONTRACTOR SHALL ENSURE THAT ALL WORK IS CARRIED OUT, TESTED AND CERTIFIED AS CONTROLLED FILL IN COMPLIANCE
            WITH 45.3790     'MIN ON EARTHWORKS FOR COMMERCIAL AND RESIDENTIAL DEVELOPMENTS'. ALL TESTING AND INSPECTIONS
            ARE TO BE CARRIED OUT BY A NATA      CERTIFIED LABORATORY APPOINTED BY THE GEOTECN(AL CONSULTANT N ACCORDANCE
                                                                                                                                                                   TOPSOIL:
            WITH LEVEL ONE TESTING AS SET OUT N APPENDIX 8 OF AS.3790. THE CONTRACTOR SHALL PROVEN CERTIFICATION TO Tit ENGINEER
                                                                                                                                                                   TOPSOIL IS TO BE REMOVED. STOC PLED. AND REUSED TO COVER ALL DISTURBED EARTHWORKS TO A MINIMUM COMPACTED DEPTH Of
            ON COMPLETION OF THE EARTHWORKS.
                                                                                                                                                                   75a AND GRASSED.
                                                                                                                                                                   NOTE
            7. ALL `UNCONTROLLED FLL- IDENTIFIED ON SITE 10 BE REMOVED TO NATURAL SURFACE LEVEL AND. IF SUITABLE. REUSED AND
                                                                                                                                                                   ALL PAVEMENT WORK IS TO BE MARRED OUT N ACCORDANCE WITH SUNSHINE COAST REGIONAL COUNCIL TAOOFLKS AND
            PLACED AS SPECIFIED   ABOVE.
                                                                                                                                                                   SPECIFICATIONS.



                                                                                                                                                                                   PAVEMENT DETAIL
                                                                                                                                                                               ROAD EXTENSION - LANEWAY




                                                                                                                                                                                                                                                                                                                                                 TOD CONSULTING PTY. LTD.

                       PROPOSED ACCOMODATION AND                                                                                      CIVIL WORKS NOTES                                                                                                                                                                                                    AAA 71 PI MS 9m
                                                                                                                                                                                                                                                                                                                                                       20 Mary Slred, N.,sanllr


                       COMMERCIAL DEVELOPMENT                                                                                         AND DRAWING                                                                                                                                                      TOD                                           PD. Bow 61, Noo,o,lIIr 010 1566
                                                                                                                                                                                                                                                                                                                                                 Phone 1091 5119 9600 Fns 1011 5449 9494
                                                                                                                                                                                                                                                                                                                                                    (Mall   rnquiriesOlodronsuIIlnq.rom
                                                                                                                                                                                                                                                                                                                                                       Wrh    wv IakonsuIti-9 n

                       'ESSENCE OF PEREGIAN'                                                                                          SCHEDULE
                       DAVID LOW WAY                                                                (11                               STAGE I AND 2
                                                                                                                                                                                     21.11.11 AMEHDEO AS CLOUDED
                                                                                                                                                                                     11.10.11 AMENDED AS CLOUDED
                                                                                                                                                                                                                                                                                                             ENGINEERS

                                                                                                                                                                                                                                                                                                         STRUCTURAL CIVIL
                                                                                                                                                                                                                                                                                                                                        0n1'S. PRYSIUPA m,.m A. VENESS
                                                                                                                                                                                                                                                                                                                                        4mnm               [IrtSa
                                                                                                                                                                                                                                                                                                                                                                              Om+ MAY 2010


 ,IN MN


..,J w nr
                       PEREGIAN BEACH for                                                  essence                                                                                   2108.11 CONSTRUCTION STAGING ISSUE
                                                                                                                                                                                     30.11.10 OPERATIONAL WORKS ISSUE
                                                                                                                                                                                     10.06.10 OPERATIONAL WORKS ISSUE
                                                                                                                                                                                                                                                                                                                                               B. GEORGE
                                                                                                                                                                                                                                                                                                                                                           AW..d
                                                                                                                                                                                                                                                                                                                                                                    H. GRAY         N/A


                                                                                                                                                                                                                                                                                                                                                                                    A911

Nhtit, r               SCANLON PROPERTY GROUP                                                                                                                                        20.05.10 PRELIMINARY ISSUE
                                                                                                                                                                                                                                                                                                                                               10525
                                                                                                                                                                                                                                                                                                                                                           m,+n9 w
                                                                                                                                                                                                                                                                                                                                                                    Cl

Used in these records

About this file

File size
26.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

PART Response to Information Request.pdf · 26.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.