      LANDSCAPE SPECIFICATIONS

      1.0 GENERAL NOTES
                                                                                            2.0 LANDSCAPE CONSTRUC71ON

                                                                                            LEVELS
                                                                                                                                                                                                                                                        essence of peregian beach
      ABBREVIATIONS
                                                                                             SEE PLAN FOR ENGINEERS PLAN LEVELS 6 PROPOSED LEVELS.
                                                                                             VERIFY ALL LEVELS. CONDITIONS. 8 UTILITY LOCATIONS IN-THE-FIELD INCLUDING ALL
                                                                                                                                                                                                                                                                     Operational Works - Landscaping
       EP - ESTABLISHMENT PERIOD
       WA - NOT APPLICABLE
                                                LA - LANDSCAPE ARCHITECT
                                                O.C. - ON CENTRE
                                                                                             INVERTS IF A DISCREPANCY OCCURS NOTIFY SUPER 81OR LA
                                                                                             LEVELS TO BE CONFIRMED BY A QUALIFIEDIUCENSED SURVEYOR. SEE PLANS FOR LEVEL                                                                                                                                                                     June 2010
       SCRC - SUNSHINE COAST REGIONAL COUNCIL                                                SOURCES
       SUPER -SUPERINTENDENT                                                                 GRADE EVENLY BETWEEN PRESCRIBED LEVELS 8 FINISHED SURFACE LEVELS ENSURING                 MINIMUM 2m FROM STORMWATER CATCH PITS
                                                                                                                                                                                                                                                                      SOURCES:
                                                                                             POSITIVE DRAINAGE & NO PONDING AREAS                                                     - MINIMUM 1500mm HORIZONTALLY & VERTICALLY FROM SEWER LINES
                                                                                                                                                                                                                                                                       SURVEY - JFB P
      THE FOLLOWING LANDSCAPE OPERATIONAL WORKS PLAN PACKAGE CONSISTS OF THE                 CO-ORDINATE ESTABL ISHME N I OF I FVELS WITH SUPER.                                       MINIMUM OF 6m FROM OVERHEAD STREET LIGHTING
                                                                                                                                                                                                                                                                       TREE SURVEY - PMM
     FOLLOWING SCHEDULE OF DRAWINGS;                                                         ENSURE 2% MINIMUM SLOP)- AWAY FROM ALL STRUCTURES TO PITS OP SWALES                      - MINIMUM OF 900mm FROM BACK OF KERB                                             CIVIL ENGINEERING - TOD CONSULTING ENGINEERS
              LD1              GENERAL NOTES
                                                                                                                                                                                                                                                                       HYDRAULIC ENGINEERING . SIMMONDS & BRISTOW PTV LTD
              LD2              DETAILS                                                     DRAINAGE                                                                          GENERAL PLANTING
                                                                                                                                                                                                                                                                       ARCHITECTURE . CARL BRUNSKILL
              LD3              DETAILS. LEGEND. PLANT SCHEDULES                              ALL FIELD INLETS & SUBSURFACE DRAINS TO BE CONNECTED TO ENGINEER'S SITE          REFER TO DETAIL(S) HEREIN RESPECTIVELY.
                                                                                                                                                                                                                                                                       ECOLOGICAL RESTORATION PLAN (INCLUDING FAUNA FRIENDLY FENCING) - RPS
              LP1JLP6          LANDSCAPE DRAINAGE S CONCRETE EDGING PLANS                    STORMWATER DRAINAGE SYSTEMS                                                      SUPPLY & PLACE PLANTS ACCORDING TO PLANT SCHEDULE, PLANT SETOUT NOTES & PLAN
              LP7-LPIS         PLANTING PLANS                                                PROVIDE SUBSURFACE DRAINAGE TO ALL GARDEN BED AREAS PER DETAIL DRAINAGE TO       LOCATIONS
              LP16             TREE RETAINED 1 REMOVAL PLAN                                  BE SOCKED 100mm MIN AG-FLOW PIPE CENTRED IN 300x300mm                            WHERE DISCREPANCIES OCCUR ADVISE SUPER PRIOR TO PLANTING.
                                                                                             GRAVEL TRENCH SURROUNDED BY LA APPROVED PERMEABLE BIDUM.                         ENSURE PLANTS ARE PLACED S PLANTED AT EQUAL CENTRES, STAGGERED. NOT IN ROWS
     THE LANDSCAPE PLANS MUST BE READ IN CONJUNCTION WITH THE OPERATIONAL WORKS              LANDSCAPE FIELD INLETS TO BE 450x450mm PLASTIC SUMPS WITH L.D. GALVANISED        UNLESS INDICATED ON PLANS
     LANDSCAPING DECISION NOTICE ONCE ISSUED, ARBORISTS REPORT. REHABILITATION PLAN,         SURFACE GRATE DETERMINE REQUIREMENTS ON-SITE IN ADDITION TO THOSE ON PLANS.      MASS & GROUP PLANTINGS TO BE SPACED EVENLY IN A TRIANGULAR PATTERN TO ACHIEVE
     & KOALA HABITAT MANAGEMENT PLAN. THIS PLAN HAS BEEN DEVELOPED TO COMPLY WITH            ENSURE ALL DAMAGED STORMWATER PIPES ARE REPLACED & RELOCATED AS NECESSARY.       OPTIMUM COVER RELATED TO MATURE PLANT SIZE AND FORM
     THE SUNSHINE COAST REGIONAL COUNCIL - THE NOOSA PLAN PLANNING SCHEME.                   STORMWATER DRAINAGE TO BE 100mm MIN. UPVC DRAINAGE PIPE.                         SHRUBS & SPREADING GROUNDCOVERS TO BE SET BACK A MINIMUM 500mn FROM ROADS,
                                                                                             ENSURE SITE DRAINAGE CAN OCCUR TO WHOLE OF SITE & WHERE PATHS, EDGES. &          KERBS, GARDEN EDGES 8 PATHS TO ALLOW FOR MATURE PLANT FORM CONFIRM WITH LA
     PRELIMINARIES                                                                           GARDENS ETC. MAY IMPEDE DRAINAGE. REFER TO LA BEFORE CONTINUING WORKS            WHICH REQUIRE MORE DISTANCE
       BEFORE WORK COMMENCES THE SUBCONTRACTOR IS TO ORGANISE A PRE-START MEETING            ENSURE DRAINAGE WORKS CORRELATE WITH. B DO NOT DISTURB. ADJACENT LAND.           ALL PLANTS MUST BE PLANTED USING ONE AGRIFORM 109 FERTILISER (N.P.K. 20-1.3-4.1)
       WITH THE LA TO ESTABLISH SCOPE OF WORKS MANAGEMENT PROCEDURES S CLARIFY ANY           SEE LEGEND FOR PLAN SYMBOLS ANDIOR PLANS FOR LOCATIONS.                          TABLET AT A RATE OF 11140mn12/200mm. 3/300 4/45 LIe & ABOVE POT SIZES. S9 TABLET FOR
       ISSUES                                                                              • FURNISH & INSTALL 1m' OF 100-200mm0 WASHED, SOUND, ROUNDED MARY RIVER GRAVEL     TUBESTOCK DO NOT USE TABLETS FOR BANLSIAS, GREVILLEAS S KANSAS.
     • CALL DIAL BEFORE YOU DIG 1100 PRIOR TO ANY EXCAVATION.                                SPALLS OVER PINNED PERMEABLE GEO-FABRIC AT ALL NEW LANDSCAPE DRAINAGE            CULTIVATE SUBGRADE TO 150nm
       PRIOR TO COMMENCING CONSTRUCTION WORKS. VERIFY DIMENSIONS. LEVELS & LOCATION          DAYLIGHT POINTS                                                                  SOAK PLANTS THOROUGHLY BEFORE REMOVING FROM CONTAINER
       OF SITE SERVICES, REFER ENGINEER'S DRAWINGS GENERALLY                                                                                                                  REMOVE CAREFULLY S INSPECT ROOTBALL, REMOVE OLD MATTED & CORED ROOTS TO
       WHERE ANY DISCREPANCIES OCCUR WITHIN LANDSCAPE DOCUMENTATION REFER TO               CONCRETE WORKS                                                                     EXPOSE YOUNG ROOTS
       LA & SITE SUPER                                                                     • PATH ALIGNMENTS TO BE PEGGED BY CONTRACTORS APPROVED BY LA PRIOR TO POURING.     DO NOT MIX SOIL FROM HOLE WITH MULCH
                                                                                             INSTALL FEATURE. LIGHT EXPOSED. F72 REINFORCED CONCRETE SLABS GRADE 25 MPA,      ROUGHLY SQUARE HOLE SIDES
     SEDIMENT AND EROSION CONTROL                                                            W TH FINISHED CONCRETE THICKNESS TO BE 100mmON COMPACTED SUB-GRADE AS            FILL HOLE WITH WATER. ALLOW TO DRAIN BEFORE PLANTING
       INSTALL SILT CONTROL FENCING IN ACCORDANCE WITH SITE ENVIRONMENTAL                    SHOWN ON PLANS                                                                   INSTALL FERTILISER TABLET(S)
       MANAGEMENT PLAN 8 LOCAL AUTHORITY REGULATIONS                                       . PROVIDE CONNOLLY KEY EXPANSION JOINT (EXJ100) OR APPROVED SIMILAR TO
                                                                                                                                                                              BACK-!LL PLANT PIT WITH A54419 TOPSOIL
       SEDIMENT & EROSION CONTROL DEVICES TO BE INSTALLED WHERE NECESSARY & AS               MANUFACTURERS RECOMMENDATIONS & CONSTRUCTION JOINTS (TOOL JOINTS) AT THE         WATEP PLANT THOROUGHLY B MAINTAIN APPROPRIATE SOIL MOISTURE IF E'L'. THPOUGH
       DIRECTED ON SITE BY SUPERINTENDENT                                                    FOLLOWING INTERVALS,                                                             ESTA9_:SNr,4_NT   WATER ADDITIONALLY DURING DRY PERIODS DURING ONM^^NILNANCE
      ALL SEDIMENT S EROSION CONTROL DEVICES ARE TO BE INSTALLED IN ACCORDANCE                       PA TH WIDTH        EXPANSION JOINT    CONTROL JOINT
      WITH MANUFACTURERS SPECIFICATIONS.                                                             3m                 12m                3m                                SIORETENTION AREAS - TUBESTOCK PLANTING
       THE CONTRACTOR IS RESPONSIBLE FOR ENSURING SEDIMENT & EROSION CONTROL                         2m                 am                 2m                                 REMOVE ALL WEEDS FROM PLANTING AREAS LEVEL & TRIM PER ENGINEER'S PLANS
       DEVICES ARE INSPECTED & MAINTAINED AS FOLLOWS.                                               1.5m                6n                 1.5m                               PLANTING AREAS TO BE DECOMPACTED 8 CULTIVATED 150mm DEEP
             a.) DURING CONSTRUCTION                - DAILY DURING DRY WEATHER                      1.2m                48m                12M                                INSTALL PLANTS PER PLANT SCHEDULE DENSITIES & NOTES S DETAILS
                                                    . PRIOR TO PREDICTED STORM EVENTS
                                                    - TWICE DAILY DURING PROLONGED RAIN    • ALL OTHER CONCRETE WORKS INCLUDING PATHWAYS & RAMPS TO BE CONSTRUCTED TO
                                                                                                                                                                             • INSTALL FERTILISER TABLET(S)
                                                                                                                                                                              BACKFILL PLANT PIT WITH AS4419 TOPSOIL
                                                                                                                                                                                                                                                                       LEGEND                                                         DETAIL
             b.) DURING ESTABLISHMENT PERIOD - WEEKLY DURING DRY WEATHER                     CURRENT SCRC ROADSTREET STANDARDS ROOSS & R0084 & IN ACCORDANCE WITH ALL         WATER PLANT THOROUGHLY & MAINTAIN APPROPRIATE SOIL MOISTURE LEVELS THROUGH
                                                    - PRIOR TO PREDICTED STORM EVENTS        AUSTROADS CONSTRUCTION DETAILS OR GREATER EXTENT AS DESCRIBED HEREIN & ON        ESTABLISHMENT WATER ADDITIONALLY DURING DRY PERIODS DURING ON-MAINTENANCE                             EXISTING 1REE 1O BE RETAINED
                                                    • TWICE WEEKLY DURING PROLONGED RAIN     PLANS & DETAILS.                                                                • DO NOT MULCH 810RETENTKON AREAS SAND FILTER MEDIA.                                       ®900        Refer to LPI3. General Notes, Details, & data
      ALL STOCKPILES ARE TO BE PROTECTED WITH SUITABLE EROSION CONTROL DEVICES &                                                                                                                                                                                                    by others.
       GRADED TO ENSURE CONTROL OF RUNOFF                                                  EDGING                                                                            NEW TURFED AREAS
     • COORDINATE INSTALLATION OF SEDIMENT & EROSION CONTROL DEVICES WITH CIVIL              MAINTAIN SPADE CUT EDGES PER PLAN & DETAIL                                       EXCAVATE CIVIL FINISH LEVELS 150mm FOR TURF AREAS (UNLESS COMPLETED BY CIVIL
       CONTRACTOR TO ENSURE COMPATIBILITY & CONSISTENCY IN CONTROL MEASURES                  SUPPLY & INSTALL 100x100nm CONCRETE GARDEN EDGES AS SPECIFIED & SHOWN ON THE     CONTRACTOR)                                                                                           STAGE BOUNDARY
      ALL I XPO51'] SURFACES, ONCE COMPLETED SHAT L BE IMMEDIATELY STABILISED TO             PLANS 8 DETAILS, SPECIFICALLY WHERE NEW GARDENS ARE LOCATED ADJACENT TO NEW      CULTIVATE SUBGRADE SOIL TOA DEPTH OF 150mm,                                                           Refer 10 Plans
       PREVENT FROSITN                                                                       TURF AREAS TIE OFF ENDS PERPENDICULARLY TO PATHS AT KERBS AT CONTROL OR          CML CONTRACTOR TO HARVEST, STOCKPILE S RE-SPREAD SITE TOPSOIL
                                                                                             EXPANSION JOINTS                                                                 LANDSCAPE CONTRACTOR TO TEST TOPSOIL TO AUSTRALIAN STANDARDS FOR SOIL
     SITEWORKS AND DRAINAGE                                                                • SUPPLY & INSTALL TIMBER EDGES AS SPECIFIED & SHOWN ON THE PLANS & DETAILS,       MODIFICATION RECOMMENDATIONS FURNISH LA WITH RESULTS & CONFIRMATION
                                                                                                                                                                                                                                                                                    SHEET ADJOIN LINE
      REMOVE ALL UNWANTED MATERIAL. DELETERIOUS S OPERATIONAL DEBRIS FROM SITE.              INCLUDING WHERE GRAVEL AREAS ARE ADJACENT TO NEW GARDEN AREAS                    ALLOWANCES SHALL BE MADE BY LANDSCAPE CONTRACTOR TO ADJUST TOPSOIL FOR PH
                                                                                                                                                                                                                                                                                    Refer W Plans
      PLAN DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS.                               WHERE DRAINAGE IS REQUIRED THE FOLLOWING APPLIES,                                 BALANCING & NUTRIENT IMPROVEMENTS
      VERIFY ALL DIMENSIONS IN-THE-FIELD,                                                         - ALLOW FOR SEEPAGE INTERCEPTION SUBSURFACE DRAINAGE WHERE PATHS &          TRIM AMELIORATED TOPSOIL. FILL DEPRESSIONS & PROVIDE EVEN FALLS AS INDICATED
                                                                                                                                                                                                                                                                                    LANDSCAPE FIELD INLET (PROPOSED)
      WHERE BAD GROUND OCCURS OR LEVELS PROVIDED ARE NOT FUNCTIONAL REFER TO LA.                  LANDSCAPE WORKS IMPEDE DRAINAGE (TO BE COORDINATED ON SITE)                 ON DRAWINGS
      ENSURE SITE DRAINAGE CAN OCCUR TO WHOLE OF SITE 8 WHERE PATHS, EDGES, &                     - ALLOW FOR 300mm x 300mm GRAVEL TRENCH WITH SOCKED AG-LINE UNDER PATH,     FINISHED TURF GRADES/CONTOURS SHALL BE SMOOTH AND UNDULATING. FREE FROM
                                                                                                                                                                                                                                                                                    Refer to General Noes. Plans & Schedule
      GARDENS ETC MAY IMPEDE DRAINAGE REFER TO SUPERINTENDENT BEFORE CONTINUING                   DISCHARGE TO NATURAL DRAINAGE LINES                                         DELETERIOUS MATERIALS. DEBRIS. LARGE CLODS OF SOIL. STONES. & ORGANIC MATTER,
      WORKS                                                                                       - ALLOW FOR 300mm x 300mm LATERAL COLLECTION TRENCHES EXTENDING NOM 1m      POSITIVE FLOWING MIN 2% SLOPES & NO PONDING AREAS CO.ORDINATE ON.SITE W TH LA S                       CONCRETE EDGE
      ENSURE DRAINAGE WORKS CORRELATE WITH ADJACENT LAND.                                        EITHER SIDE OF LOW POINT                                                     ENSURE LEVELS ARE APPROVED PRIOR TO LAYING TURF                                                       Refer to PlanS. General Notes. Dalai
      CML DESIGN HAS PROVIDED A POSITIVELY DRAINED SITE HOWEVER, WHERE DRAINAGE                                                                                               SUPPLY & LAY 'A' GRADE TURF PER PLANS 8 THE PLANTING SCHEDULE
      ISSUES ARE IDENTIFIED REFER SUPER.                                                   PLANTING                                                                           WATER TURF IN WELL. APPLY WATER TO MAINTAIN SOIL MOISTURE UNTIL ESTABLISHED
      REFER TO 2 0 LANDSCAPE CONSTRUCTION . DRAINAGE FOR MORE INFORMATION
                                                                                                                                                                                                                                                                                    STREET TREE PLANTING
      EXCEPT WHERE INDICATED OR SPECIFIED. FINISHED SURFACE LEVELS ARE TO BE FLUSH
      WITH ADJACENT SURFACES & GRADED EVENLY ELSEVNERE
      ENSURE SMOOTH FLOWING. EVEN GRADES AND POSITIVE DRAINAGE WITH NO PONDING TO
                                                                                           NEW GARDENS
                                                                                           • EXCAVATE CML FINISH LEVELS 300mm FOR GARDEN AREAS (UNLESS COMPLETED BY CML
                                                                                            CONTRACTOR)
                                                                                                                                                                             FAUNA FRIENDLY FENCING
                                                                                                                                                                              REFER TO ECOLOGICAL RESTORATION PLANS BY RPS                                                n         Refer be Plans, Detail & Schedule

      FALL PERCENTAGES SHOWN ON PLAN 3% (MINIMUM 2`,) FINISHED GRADES SHALL BLEND           CULTIVATE SUBGRADE SOIL TO A DEPTH OF 150nan
                                                                                                                                                                                                                                                                                    TREE PLANTING
      INTO EXISTING GRADES PRC'VNDING A NATURAL APPEARANCE WITH NO ABRUPT EDGES             SPREAD A S 4419 IMPORTED ORGANIC TOPSOIL MIX TO A DEPTH OF 300mm OVER PREPARED
                                                                                                                                                                             3.0 MAINTENANCE                                                                                        Refer to Plans. Detail & Schad le
                                                                                            GARDEN AREAS & TRIM.
     TOPSOL HARVESTING. STOCKPILING, RE-USE & SPREADING                                    - CROWN BEDS AT CENTRE. 1 Wnm
      CML ENGINEERING EARTHWORK OPERATIONS WILL HAVE HARVESTED B STOCKPILED SITE                                                                                              MAINTAIN WHOLE OF LANDSCAPE WORKS FOR ESTABLISHMENT PERIOD OF TWELVE (12)
                                                                                            MULCH GARDENS WITH SITE OR LA APPROVED COMPOSTED & FINELY TUB GROUND MULCH                                                                                                              PALM TREE
      TOPSOILS LANDSCAPE CONTRACTOR TO COORDINATE WITH CIVIL CONTRACTOR TO                  TO A DEPTH OF 100mn UNLESS OTHERWISE NOTED ON PLANS                               WEEKS FROM DATE OF PRACTICAL COMPLETION OF LANDSCAPE WORKS.
                                                                                                                                                                                                                                                                                    Refer to Plans. Detail & Schedule
      ENSURE TOPSOIL IS RE-INSTALLED PER THE FOLLOWING SPECIFICATIONS IN RESPECTIVE         ALL SUPPLIED TOPSOIL & MULCH TO COMPLY WITH CURRENT AS 8 FREE OF WEEDS. SEEDS     MAINTAIN WHOLE OF LANDSCAPE WORKS FOR ON-MAINTENANCE PERIOD OF FORTY (40)
      LANDSCAPING AREAS                                                                     (SPECIFICALLY NUTSEDGE). PESTS INCLUDING FIRE ANTS & SOIL BORNE VIRUSES 8         WEEKS FROM END OF ESTABLISHMENT PERIOD

      TOPSOIL STOCKPILING SHALL OCCUR IN AN AREA ADJACENT TO THE STRIPPED AREA(S) OR        DISEASES PROVIDE LA WITH CERTIFICATION                                            WATER - DURING EP PERIOD WATER EVERY SECOND OR THIRD DAY TO MAINTAIN SOIL                             SHRUBS
      AREA BY ENGINEER OR OWNER WHICH WILL NOT HINDER VISIBILITY FOR INSPECTION OF THE                                                                                        MOISTURE OR AS REQUIRED DURING DROUGHT OR EXTREME HEAT PERIODS WATER ONCE                             Refer to Plans, Detail & Schedule
      WORK                                                                                 TREE PLANTING                                                                      WEEKLY DURING MAINTENANCE PERIOD WATER ALL PLANTS,
      STOCKPILE CONSTRUCTION TO ENSURE NO PONDING OF WATER S POSITIVE DRAINAGE              REFER TO STREET TREE 8 TREE PLANTING DETAILS (AS APPLICABLE) FOR INFORMATION.     DURING DROUGHT PERIODS

      INSTALL EROSION CONTROL MEASURES PER ENGINEER S ABOVE FOR STOCKPILED                  ALL TREES TO BE CERTIFIED THAT THEY COMPLY WITH THIS SPECIFICATION & WITH         MOWING - ONCE WEEKLY TO A HEIGHT OF 30mm.                                                             GROUNDCOVERS
      TOPSOIL                                                                               T4ATSPEC GLIDE SPECIFYING TREES: A GUIDE TO ASSESSMENT OF TREE QUALJTY(2003)'     TRIMMING - TRIM TURF ADJACENT TO HARD EDGES AS PART OF MOWING PROGRAM                                 Refer to Plans & Schedule
      LANDSCAPE CONTRACTOR TO CONDUCT SOILS ANALYSES TESTS TO STOCKPILED TOPSOILS           FURNISH LA WITH CERTIFICATION PRIOR TO INSTALLATION                               TOP DRESSING . WHEN TURF AREAS HAVE BECOME ESTABLISHED B IMMEDIATELY AFTER
      8 AMELIORATE PER RECOMMENDATIONS PRIOR TO RE-SPREADING FURNISH LA WITH                LANDSCAPE CONTRACTOR TO PEG STREET TREE POSITIONS FOR APPROVAL BY SCRC            THE FIRST CUT, TOP DRESS LAWN WITH 10mm LAYER OF PIT SAND OR APPROVED SCREENED

      RESULTS LANDSCAPE CONTRACTOR TO ALLOW FOR FOR PH BALANCING & NUTRIENT                 OFFICER & SUPER BEFORE EXCAVATION                                                 TOPSOIL SCREED TOP DRESSING LAYER INTO LAWN TO GIVE AN EVEN LAYER OVER THE                            TURF
      AMELIORATIONS ALL SOIL TESTING TO BE CONDUCTED BY A LAB ACCREDITED BY THE             STREET TREES TO HAVE A FULL & EVEN CROWN.                                         ENTIRE AREA. ENSURE FALLS & LEVELS ARE EVEN ADJUST LEVELS WHERE NECESSARY TO                          Refer W General Notes, Plans & Schedule
      NATIONAL ASSOCIATION OF TESTING AUTHORITIES OR A LAB WITH RELEVANT                   • INSTALL TREES AT LOCATIONS INDICATED ON THE PLANS. PER NOTES 6 DETAILS HEREIN    ACHIEVE PREVIOUSLY SPECIFIED FINISH LEVELS
      CERTIFICATION                                                                         MULCH TREE GARDENS WITH MIN. 12D0mm8 COLLAR WITH 25rmH HOOP PINE MULCH 100mm      FERTILISE - AS REQUIRED, INCLUDING STOCK >45L, WHERE PLANTS ARE NOT RESPONDING
                                                                                                                                                                              TO SLOW RELEASE FERTILISER APPLIED AT PLANTING NOTIFY SUPER IN WRITING IF PLANTS
                                                                                                                                                                                                                                                                                    RIO-HE ) LN T ION ARIA PLANTINGS
     SHOULD AMENDED SITE TOPSOILS BE INSUFFICIENT IN QUANTITY, CONTRACTOR TO                DEEP DO NOT MULCH WITHIN 50mm OF TRUNK I PLANT STEM
                                                                                                                                                                              ARE NOT IN GOOD HEALTH                                                                                Rotor to Plans & Schodule
      IMPORT AS 4419 TOPSOIL & SPREAD TO PROPOSED PLAN FINISH LEVELS PRIOR TO               EDGE STREET TREES PER DETAIL.
      SPREADING. IMPORTED TOPSOILS SHALL HAVE SOILS ANALYSES TEST AS PER ABOVE              INSTALL STREET TREE DRAINAGE PER DETAIL IF REQUIRED BY CIVIL ENGINEER OR TREE     WEEDING - AS REQUIRED TO PREVENT WEED COMPETITION & SEEDING
      IMPORTED SOILS SHALL THEN BE AMENDED PER TEST RESULTS PRIOR TO SPREADING              PITS DO NOT DRAIN. LANDSCAPE CONTRACTOR TO FURNISH RATE PER TREE                  RE.MULCHING - AS REQUIRED TO MAINTAIN CONSISTENT DEPTH

     CIVIL WORKS SHALL STRIP TOP 300mm SITE WORKS SOIL FROM GARDEN AREAS 1150mm             INSTALL STREET TREE ROOT BARRIER PER DETAIL IF REQUIRED. LANDSCAPE CONTRACTOR     PRUNING (FORMATIVE) - SHRUBS & VINES <200mm POT INCLUDING STOCK 5451 COMMENCE                         FAUNA FRIENDLY FENCING
      FOR TURFED AREAS                                                                      TO FURNISH RATE PER TREE                                                          3 WEEKS AFTER PLANTING. TIP PRUNE TO ENCOURAGE BUSHY HABIT >200mm POT                                 Refer to Ecological Restoration Plan by RPS
     CLEAR & REMOVE ALL NON-ORGANIC, DELETERIOUS 8 LARGE ORGANIC MATTER SUCH AS             TREE STAKING - PER DETAIL                                                         COMMENCE 6 WEEKS AFTER PLANTING REMOVE ALL DEAD WOOD

     ROCKS GREATER THAN 40mm DIAMETER, TREE ROOTS, TRUNKS. LIMBS. S STUMPS FROM             ALL TREES TO BE LOCATED.                                                          REMOVE ALL STAKING & TIES PRIOR TO ON-MAINTENANCE INSPECTION PLANTS UNABLE TO

     ALL AREAS TO BE LANDSCAPED.                                                                    AT LEAST 2m FROM DRIVEWAY CROSSOVERS                                      BE SULF.SUPPORTING CONSISTENT WITH APPROPRIATE FORM & VIGOUR TO BE PRUNED OR

     CML CONTRACTOR TO RE-SPREAD STOCKPILED TOPSOIL TO PLAN PRESCRIBED PROPOSED                  - AT LEAST 600mn FROM CONCRETE PATHS                                         REMOVEDS REPLACED IN LAKE PLANTS DISPLAYING WEAKNESS OR FAILURE IN ROOT
     CONTOURS & TRACK-IN                                                                         - MINIMUM OF 1000mm FROM UNDERGROUND SERVICES LOCATION OF SERVICES TO        SYSTEM SHALL BE REPLACED
                                                                                                    BE CONFIRMED ON SITE BY CONTRACTOR BEFORE EXCAVATION COMMENCES            MONITORING - PROVIDE LIST OF ACTMTIES COMPLETED AT MONTHLY INTERVALS
                                                                                                                                                                              INCLUDING STOCK >45L


Client                                                                     Project                                                                                                7                                                                                        IJOBNO   51004636
                                                                                                                                                                                                                                                                                                                        anembo consultants
SCANLON PROPERTY GROUP                                                     essence of peregian beach                                                                                                                                                                        DWG No LD1
                                                                                                                                                                                                                                                                                                                        wetb COMM41epq.IM.        "A 750(91)1 156
IM da1N11 h 0e cN1n(Pe ormmbo omsWaxr 8 r3/(
ml be clee(Mban elnm 10Pm11, w rxe A be l,red
                                                                           215A-219 David Low way                                                                                                                     IN                                                   "ET OF 16
                                                                                                                                                                                                                                                                                                                        Sonrlw Carl    Po am 21 1WI. I..c. ale 4551
                                                                                                                                                                                                               e1     IH                                                                                                M 02 51110000                1u 015111 u)x1
'Ac-l. k4wAFem n!Ile 3/r rmAe6 IC.
rw    be ereleurl Mee o<IeN luxe eUr 9lrs                                  Peregian Beach, QLD                                                                                                                C4n11                                       GENERAL NOTES                                                 e 1W 11ur,Nn,llbocwn          ew v,emnc r

Used in these records

About this file

File size
26.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

PART Response to Information Request.pdf · 26.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.