Council archive · source document
PART Response to Information Request · OPW11/0335
Very large file (26.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
APPENDICES
APPENDIX A LAYOUT DRAWINGS
APPENDIX B MUSIC MODELLING
APPENDIX C SEDIMENT AND EROSION CONTROL PLAN DAILY CHECKLIST
APPENDIX D LONG TERM MAINTENANCE OF STORMWATER MANAGEMETN
FACILITIES
APPENDIX E SEDIMENT AND EROSION MANAGAEMENT PLAN
APPENDIX F SOIL AND WATER QUALITY SAMPLING MAP
TABLE OF FIGURES
Figure 1: General Location of the Proposed Development ...................................................................2
LIST OF TABLES
Table 1-1: Water Quality Design Objectives for Loads Reductions ......................................................3
Table 2-1: Water Quality Measured in the Terminal Wetland of the Existing Caravan Park Site........5
Table 3-1: The Quality of Surface Soil Measured In the Undeveloped Site ..........................................6
Table 3-2: The Quality of Surface Soil Measured In the Undeveloped Site ..........................................6
Table 4-1: Drawing List ...............................................................................................................................7
Table 6-2: MUSIC Model Results - Undeveloped Site ........................................................................... 10
Table 4-3: MUSIC Model Results - Stage 1 Site ..................................................................................... 11
Table 4-4: MUSIC Model Results - Fully Developed Site ...................................................................... 11
Table 5-1: Management Actions of the Essence of Peregian Stormwater Management Plan ......... 12
Table 6-1: Factors Contributing to Erosion Hazard .............................................................................. 13
Table 6-2: Sediment and Erosion Control for Construction of the Essence of Peregian ................. 14
Table 7-1: Installation Sequence for the Essence of Peregian Development .................................... 15
Table 8-1: Site Details of the Essence of Pereglan Development ....................................................... 16
Table 8-2: Dimensions of Rainwater Tanks and WSUD Deemed to Comply Solutions .................... 17
Table 9-1: Summary of Test Methods for Ambient Surface Waters .................................................... 18
Table 9-2: Location of Water Quality Monitoring at the Essence of Peregian Site ........................... 19
Table 9-3: Monitoring Schedule for the Construction and Operational Development ...................... 20
©2010 Simmonds & Bristow Pty Ltd Contrast Constructions 1108-155C - 13 January 2012
I\CLIENTFILES\Contrast Constructions\1108-155c - Essence of Peregian SCEP Stage 1 Update\09_Output Documents\1108-155C_SWMP
SCEMP_Scanlon Property Group_V3,0_ta_120113.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
PART Response to Information RequestRelated documentApplication case desk ↗
About this file
- File size
- 26.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.