Minor Change Report 51992 213 03 (As Published)
22 The maximum height of the shade shelter and ablution block must not exceed 4 metres
above the finished ground level and the natural ground level.
23 With regard to the construction of the shade shelter and ablution block, existing trees on the
site must be retained. Trees must be protected from construction activities by using low
impact construction techniques around vegetation.
24 The ablution block must be connected to the onsite sewer connection in accordance with the
standards and requirements of Northern SEQ Distributer-Retailer Authority (Unitywater).
Applicant’s Request
The applicant has requested that the existing approval be amended to reflect the inclusion of the
new amenities building. Given the code assessment undertaken above, the gross floor area of
buildings on site should be reflective of the details assessed under this application. The conditions
stated above mention the previously approved ablution block, the approval of which has since
lapsed in 2020. The conditions of approval should be amended to remove any mention of the
previously proposed ablution block which is no longer required as a result of the newly proposed
amenities block.
Assessment of Request
It is considered necessary to amend these conditions to remove mention of the previously
proposed ablution block, in line with the total gross floor area of buildings sited on this lot as
considered in the code assessment undertaken in this report.
Recommendation
It is recommended existing Conditions 21, 22, 23 and 24 be amended to read as follows:
21 The shade shelter and ablution block must be setback a minimum of 10 metres from the
southern boundary and 45 metres from the eastern boundary of the site.
22 The maximum height of the shade shelter and ablution amenities block must not exceed 4
metres above the finished ground level and the natural ground level.
23 With regard to the construction of the shade shelter and ablution amenities block, existing
trees on the site must be retained. Trees must be protected from construction activities by
using low impact construction techniques around vegetation.
24 The ablution amenities block must be connected to the onsite sewer connection in
accordance with the standards and requirements of Northern SEQ Distributer-Retailer
Authority (Unitywater).
Building colour and demolition.
The proposed development will require partial demolition of an existing building on the site to
accommodate the new ablutions block. Council’s standard demolition conditions will be included
to ensure that the sorting and removal of any waste or potentially hazardous waste is appropriately
managed.
An additional condition will also be included to ensure that colours of the building are in keeping
with muted environmental tones.
4. CONSULTATION
4.1. Referral Agencies
Not applicable
4.2. Internal Council Referrals
The application was forwarded to the following internal Council officers for review and/or comment:
• Senior Development Engineer, Development Assessment
Page 10 of 13
Document Set ID: 24305782
Version: 7, Version Date: 01/12/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.