                                                                                                                          EXCAVATION AND                                                    CULTIVATION &                            FILL & TOPSOIL                           EROSION AND
                                                                                                                          EARTHWORKS                                                        SUBSURFACE                                                                        SEDIMENT CONTROL
                                                                                                                                                                                            DRAINAGE                                 Fill and subsoil material used to
                                                                                                                                                                                                                                     make up levels shall be re-used from
                                                                                                                          Inspect the site and ascertain the                                                                                                                  The Landscape Contractor shall
                                                                                                                          nature of excavation required and                                                                          previous earthworks operations on        ensure measures to minimise
                                                                                                                                                                                            The Landscape Subcontractor is to        site where possible which is
                                                                                                                          the working conditions that will be                                                                                                                 erosion and situation.
                                                                                                                                                                                            provide for sufficient surface and       composed of natural site subsoils
                                                                                                                          encountered prior to the                                                                                                                            Take all precautions necessary to
                                                                                                                                                                                            sub-surface drainage to garden and       but free from stones, sticks, roots,     prevent erosion, contamination and
                                                                                                                          commencement of work. The
                                                                                                                                                                                            grass areas to ensure adequately         rubbish and material toxic to plant
                                                                                                                          location of topsoil stockpiles,                                                                                                                     sedimentation of the site,
                                                                                                                                                                                            drained soft landscaped areas free       growth.                                  surrounding areas, water and
                                                                                                                          roadway and cut embankment
                                                                                                                                                                                            from surface ponding water and                                                    drainage systems, in accordance
                                                                                                                          profiles and water connection points
                                                                                                                                                                                            heavy/ waterlogged soils. Surface        Supply and install imported topsoil      with the Environmental Protection
                                                                                                                          must be taken into account.
                                                                                                                                                                                            and sub-surface drainage is to aid in    where necessary that complies with
                                                                                                                                                                                                                                                                              (Water) Policy 1997.
                                                                                                                           Surface drainage shall be diverted                               the healthy growth and continued         Australian Standards to all turf
                                                                                                                           clear of excavations and covers shall                            thriving of all plant stock and grass    (100mm) and garden (300mm) areas         Methods of protection shall include
                                                                                                                                                                                            areas.                                   as shown on drawings unless
GENERAL                                                                                                                    be provided where necessary for
                                                                                                                           safety. Ensure that run-off is not                                                                        otherwise specified. Ensure modified
                                                                                                                                                                                                                                                                              but not be limited to the following:
                                                                                                                                                                                            Comply with the relevant Australian                                               · Construction of temporary surface
                                                                                                                           concentrated onto adjoining                                      Standards to the extent that they are    site soil is free from stones, sticks,
All works to be performed by a           Convey soils, earth, sand, loose debris Unless otherwise specified, reinstate                                                                                                               roots, rubbish and material toxic to       swales;
                                                                                                                           properties and does not cause a                                  relevant and not over-ridden by the
licensed Contractor familiar with        and the like to or from the site in a    all existing surfaces, items, structures nuisance thereto. Finished surfaces                                                                       plant growth. Modified topsoil shall     · Diversion and dispersal of
                                                                                                                                                                                            specification.                                                                      concentrated flows to point where
landscape construction of this nature. manner that will prevent dropping of       and anything disturbed or damaged by shall be graded in accordance with                                                                            have a friable structure with good
The Contractor shall verify the location materials on streets, public and         the performance of the works, to its                                                                                                               drainage and high organic content.         the water can pass through the
                                                                                                                           Construction Plans.                                              Cultivate sub-grade to a minimum
of utilities on site prior to the        private areas. Ensure that the wheels, condition at the commencement of                                                                                                                                                                site without damage;
                                                                                                                                                                                            depth of 150mm prior to placing
commencement of construction, and        tracks and body surfaces of all vehicles the Contract, other than that forming Erect barriers as required to                                       topsoil to all planting and turf areas
                                                                                                                                                                                                                                                                              · Construction and maintenance of
ensure that they will not have an        and plant leaving the site are free of   part of or directly modified by the new prevent excavated material and                                    on ground.
                                                                                                                                                                                                                                                                                silt traps (eg hay bales) to prevent
effect on the works. The Landscape       mud and that mud is not carried onto work.                                        rocks from intruding onto adjoining                                                                                                                  the discharge of scoured materials
Contractor is advised to visit the site  adjacent paved streets or other areas. Remove and cart away debris, spoil         properties.                                                                                                                                          to downstream areas;
                                                                                                                                                                                            Minimum cross falls of 1:50 on
to satisfy themselves as to local        Restrict dust caused by the Works to a and surplus building materials from                                                                                                                                                           · Progressive restoration of
                                                                                                                                                                                            planting and pathways to drainage
conditions, accessibility, storage       minimum. Take all practicable steps      the site and buildings, with the                                                                                                                                                              disturbed areas;
                                                                                                                                                                                            collection points and overflow
space, the full extent and character of to minimise noise resulting from the      exception of those works associated                                                                                                                                                         · Construction of temporary siltation
                                                                                                                                                                                            points. Planting areas should not
the works and the site, the nature of    Works.                                   with others prior to practical                                                                                                                                                                fencing.
                                                                                                                                                                                            exceed 1:3.
the ground, the supply of materials                                               completion.                                                                                                                                                                                 Any erosion damage reinstatement
and water and the execution of the       Check all delivery tickets, labels,                                                                                                                                                                                                  or cleanup as a result of the
contract generally. No claim will be     identification marks and, the goods      Fire Ant Control                                                                                                                                                                            contractor not adequately protecting
allowed for any alleged inadequacy of themselves to ensure that all               The Landscape Subcontractor is to                                                                                                                                                           the site, materials or the works shall
the description herein. Should there     products comply with the project         allow to carry out all necessary                                                                                                                                                            be the responsibility of the
be any conflict, the Contractor shall    documents. Where different types of      measures, inspections and safeguards                                                                                                                                                        landscape contractor.
notify the Landscape Architect           any product are specified, check to      to ensure Fire Ants do not enter the
                                         ensure that the correct type is being    site via equipment, machinery,                                                                                                                                                              Remove temporary erosion control
immediately.
                                         used in each location. In particular,    materials and plant stock.                                                                                                                                                                  measures when they are no longer
                                         check that:-                                                                                                                                                                                                                         required.
Establish exact locations of services,
drains, sewers and water supply lines All stock has been adequately
and points prior to commencing works protected for loading and in transit.
and ensure their protection during the The sources, types, qualities, finishes
works.                                   and colours are correct, and match
                                         any approved samples.
Figured dimensions shall take            The correct species, cultivars, pot
precedence over scale measurements sizes, plant height, girth or spread
and large scale drawings over small      have been supplied for each
scale. Unless otherwise specified the consignment from the supplier.
Drawings and Specification shall         All materials should be clean,
include everything reasonable for the undamaged and otherwise in good
proper and entire completion of the      condition.
                                                                                                                                                   NOTES:
                                                                                                                                                   1. All fixtures, framing & fittings to
                                                                                                                                                   be hot dipped galvanised (HDG)
                                                                                                                                                   2. Joist attached to trough with
                                                                                                                                                   HDG coach-screws


                                                                                                                                      PLAN VIEW

                                                                                                                                                   DECKING:
                                                                                                                                                   140x19mm HWD decking as
                                                                                                                                                   per decking by architect
                                                                                                                                                   FACADE:
                                                                                                                                                   2mm steel sheet to side facade
                                                                                                                                                   (Dulux 'Monument' Matt exterior
                                                                                                                                                   paint or like colour/product)
                                                                                                                                                   CONTAINER:
                                                                                                                                                   Eco Trough WaterStore1900Lt
                                                                                                                                                   EcoTrough (2485mmD x 500mmH)

                                                                                                                          SIDE VIEW   FRONT VIEW




work.
Verify discrepancies between             Ensure adequate provision is made for
Specification and Drawings with the      the protection and storage of
Landscape Architect before
proceeding with the particular work.
                                         deliveries. In particular ensure that:-
                                         Materials which may deteriorate with
                                                                                                                          PLANT SUPPLY                                                      EXISTING TREES                           ENVIRONMENTAL                            TURFING
Failure to do so will not be taken as a  storage must not be stockpiled on site.                                                                                                                                                     PROTECTION
reason to claim for extra work.          Adequate and appropriate provision is                                             The Landscape Contractor shall                                   Protect all existing vegetation unless                                            Supply and install A-grade turf
                                         made for storage prior to deliveries                                              supply plants as specified in the                                otherwise specified. All vegetation                                               (variety specified on drawings) to
                                                                                                                                                                                                                                     The Landscape Contractor should
                                         arriving on site. ALL materials in                                                planting schedule. Plants shall be                               and weed removal is to be carried                                                 areas shown on drawings. Finishing
                                                                                                                                                                                                                                     consider in every instance whether
                                         storage are to be suitably protected                                              delivered on site true to pot size,                              out using industry standard accepted                                              levels should be flush with adjacent
                                                                                                                                                                                                                                     the use of chemicals is strictly
                                         from physical damage and extremes                                                 species and type, and free of weeds,                             safety procedures and equipment to                                                surfaces unless otherwise detailed.
                                                                                                                                                                                                                                     necessary before application, and
                                         of weather. Keep storage areas neat                                               disease and fungal infection.                                    ensure personal and environmental                                                 Spread topsoil and grade surface to
                                                                                                                                                                                                                                     assess the product, site conditions
                                         and tidy.                                                                         Substitutes will not be made without                             protection. Avoid damage to nearby                                                ensure a level finished surface,
                                                                                                                                                                                                                                     and species to ensure minimum risk
                                                                                                                           prior consent of the Landscape                                   trees and surroundings.                                                           which drains to nominated field
                                                                                                                                                                                                                                     to his employees, other users of the
                                                                                                                           Architect.                                                                                                                                         gullies.
                                                                                                                                                                                                                                     site and the environment, and take
                                                                                                                                                                                            Grub out stumps and roots over
                                                                                                                          Ensure that trunks and branches                                                                            appropriate safety precautions in        Turf to be free from nutgrass or
                                                                                                                                                                                            75mm diameter to a minimum depth
                                                                                                                          are free of dieback, cavities,                                                                             accordance with all current statutory    other noxious weeds or any other
                                                                                                                                                                                            of 500mm below sub-grade. Stumps
                                                                                                                          sunburn and secretions. Trunk and                                                                          regulations.                             material deleterious to plant growth.
                                                                                                                                                                                            less than 75mm diameter shall be
                                                                                                                          branches are to be evenly tapered                                 cut off at ground level and treated to
                                                                                                                          and textured typical of the specie.                               prevent regrowth.                                                                 Deliver the turf within 24 hours of
                                                                                                                          Plant material is to be matured                                                                                                                     cutting, and lay it within 36 hours
                                                                                                                          enough to support themselves                                      Completely remove woody weeds                                                     of cutting. Prevent it from drying
                                                                                                                          without staking.                                                  within the extent of works.                                                       out between cutting and laying.




                                                                                                                                                                                            MULCH                                    FERTILISER                               MAINTENANCE/ESTABLISHMENT
                                                                                                                                                                                            Supply and install organic mulch to a    Provide proprietary fertilisers,
                                                                                                                                                                                                                                                                              PERIOD
                                                                                                                                                                                            minimum of 100mm and gravel              delivered to the site in sealed bags
                                                                                                                                                                                            mulch to a minimum of 50mm.              marked to show manufacturer or           Maintenance of all landscape works
                                                                                                                                                                                            Ensure mulch meets Australian            vendor, weight, fertiliser type, N:P:K   is to be carried out by the Contractor
                                                                                                                                                                                            Standards and is free from               ratio, recommended uses and              until completion of the landscape
                                                                                                                                                                                            deleterious matter, fungi and            application rates. Store in a dry        works.
                                                                                                                                                                                            disease. Mulch shall finish 25mm         secure environment. Apply                Maintenance includes replacement
                                                                                                                                                                                            below adjacent surfaces.                 according to manufacturer's              of dead and/or diseased plant stock,
                                                                                                                                                                                                                                     recommendations                          removal of weeds and rubbish, weed
                                                                                                                                                                                                                                     (rate/reapplication/watering).           spraying and mowing.




         PROJECT

     211207
                                        DRAWING

                                        specifications
                                                                                                                       CLIENT

                                                                                                                       auxilium property
                                                                                                                                                                                                                                                                                                                    seed  landscape design

     19 werin street                    drawing no         drawn       scale           date           issue                                                                                                                                                                                                         t 07 3217 6491 m04 1616 9858
     tewantin qld 4565                  211207 02          ps          na              dec 2021       a                                                                                                                                                                                                             po box 527 paddington qld 4064
                                                                                                                                                                                                                                                                                                                       www.seedlandscapes.com.au

                                                                                                                                                                                                                                                                                                                               abn 85 468 007 510
Log in to download the original file

RFI - Combined design eng and landscaping.pdf · 8.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.