Original source · versioned page text
2019-01-14 General Committee Agenda - Attachment 2 to Item 1 - Amended Court Approval
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GD future-plus
Cad > ENVIRONMENTAL
4377-131119-1.0
It is understood that the owner proposes to upgrade the existing septic tank and trench system
to an aerated sewerage treatment plant (STP) and effluent disposal area, to service the existing
dwelling and daytime factory staff facilities as shown in the attached Site Layout Plan (refer
Figure 2). As part of the upgrade of the on-site sewerage facilities, FPE was engaged to carry
out an assessment of the on-site sewage treatment and potential disposal areas. This site and
soil evaluation report presents the on-site sewage treatment and effluent disposal area
required to cater for the existing development. The assessments and recommendations
contained within this report are based on our site assessment, information provided by the
Client and the recent geotechnical investigation carried out by Australian Soils Investigation
(ASD).
Figure 1: -Site Location Plan (Source —- Google Earth)
fii Ble aw SS Y em,
(67.< ! | Ry ee a
BIT, ri Kee
eae om I / i ¥ , ,
, aa 4 |
/ i} I . a
if <
i Z . |
if i
i /
2/7
i ii / |
te
yi a ny ;
= 9 poo
Ban + , hi : "j
Cotes \.
ay R en” Wag ae i
<i % ; "
\ eae
‘ i
Vn < Be
. ‘ " a : Regional Location
*
te “ > a
February 2014 Site & Soil Evaluation Report 2
Wastewater Treatment and Effluent Disposal
314 Cooroy Mountain Road, Cooroy MountainSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.