KD The wastewater generated by the Domestic Dwelling and Factory Office Facilities is
Septic/ to be diverted to the existing Septic tank. The existing Septic tank is to be convert-
Pump Well ed to a pump station. All collected waste is to be pumped to the new STP.
Cc
[se Distribution
Valve
® Fact *
Domestic oie Filter lilac a Check Valve
Dwelling sinc P ibe SS
Facilities Oly Pip
Waste Waste = =
= : JN
| I
> 3
» 2.5m 2.5m *
| 5m |
Cc .
‘3 * £
- 0
oe 5m | 6
vo a
5 | :
Cc ao
=. ~
5° i
£ | | &
c n
2 o
ov *>
ace = a
| \ Sprinkler
Cooroy Mountain Spring Water—trrigation Layout Plan
Cor Location: 314 Cooroy Mountain Road, Scale: Not to Scale
Cooroy Mountain
< ; . Figure Measurements to Take
FPE Reference Number: 4377-131119-1.0 Client: Cooroy Mountain Spring Water Pty Ltd
Precedence Over Scale Measurements
AUSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.