Attachment F - Addendum to Engineering Report (00016989)
Attached to the e-mail MCU15/0053 Plans & Applicant's Response to Information Request.
Unit Development 30-32 Doonella Street, Tewantin T Due to space constraints of the site it will be necessary to provide a low retaining wall along the side of the bio basin adjacent to the eastern boundary. This retaining wall will vary in height from 0-700mm high and would be located a minimum of 700mm from the boundary to ensure it does not impact on the use of the neighbouring property. The north and west sides of the basin will be provided with a 1:4 vegetated or turfed batter as shown on the attached sketches. The southern boundary of the bio basin fronts Donnella Street and the top of the weir/bund will be less than 300mm higher than the existing footpath level. A 1:4 grass batter will be provided at this location. Prepared by Doug Reynolds RPEQ 9072 Tod Consulting Pty Ltd 20 August 2015 Rev B J/N 13672 August 2015 Page 2 of 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment F - Addendum to Engineering Report (00016989).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.