Council archive · source document
Development Application Part 1 of 2 IDAS Forms 1 & 5 & 6 MCU11/0168 & OPW11/0257
Place barcode here
SCRC CC
I Il
PONDENCE I fPIP
1
THIS IS THE NEXT PART OF
MULTIPLE PART RECORD
Part I Of .)
Application number: 'VivJ << kC '^
a v°^ o pm er t C o u ter
f NRAMIBCS IAMIWFORMATION MANAG€? E NP ECORDS MANAGEMEN1'Coapol or FOW PART do
5JUL2011
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 21 pages
Page 2
Integrated Development Assessment System form
Application Details - IDAS form 1
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
• complete this form (Application details - IDAS form 1)
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.
Applicant details (note: the applicant is the person responsible for making the application and need not be the
owner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is
correct. Any development permit or preliminary approval that may be issued as a consequence of this application will
be issued to the applicant.)
Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another
applicant" button below.
Name/s (individual or company name in full) FOSTER DESIGNS PTY LTD
For companies, contact name MR RICHARD FOSTER
Postal address PO BOX 86; PEREGIAN BEACH; QLD 4573
Contact phone number 07 5448 3186
Mobile number (non-mandatory) 0417 623 252
Fax number (non-mandatory)
e-mail address (non-mandatory) [email protected]
1. What Is the nature of development proposed? (tick all applicable boxes)
® material change of use of premises
Z building work
operational work Development Counter
q reconfiguring a lot
2 5 JUL 2011
Yhwaf) tlf
Department of Infrastructure and Planning QPlan Queensland
Government
Page 3
2. What type of approval is being sought?
® development permit
q preliminary approval
q both - provide details below
3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?
Z N0
q Yes - complete table A and then go to question 5
4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)
Table B - street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises
Lot on plan
Street Address
description Local government area
Unit Street Street name and official Post Plan type (e.g. Logan,Caims)
Lot No .
No. No. suburb/locality name code and plan no.
1 lot 34 Marcus Dunes Court 34 SP 111721 Noosa
® Street address / lot on plan
Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
q water e.g. jetty, pontoon)
Table C - premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g.
channel dredging in Moreton Bay)
Coordinates (note: place each set of
coordinates in a separate row) Zone Local government
Datum area (If a pp licable)
re ference
Fasting Northing Latitude Longitude
q GDA94
q WGS84
1
q other
5. Total area of the premises on which the development is proposed (indicate hectares or m2)
557 M2
6. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm, etc.)
1 VACANT LAND
7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.)
DETATCHED DWELLING
Application Details - IDAS fort
Vernon 1 0 18 December 2(
Page 4
8. Is owner's consent required for this application? (refer to notes at the end of this form for more information)
q No
® Yes - complete either table D, table E or table F as applicable
Table D (note: do not complete this table if lodging the application on-line using Smart eDA)
Name of owner/s of the land x El'
MAek
I/We, the above-mentioned owner/s of the land, s t to the making of this application.
1*0
Signature of owner/s of the Ian x
^O/
Date Ix -
Table E
Name of owner/s of the land
q The owner's written consent is attached or will be provided separately to the assessment manager
Table F
Name of owner/s of the land
By making this application, I, the applicant, declare that the owner has given written consent to the making of
q the application.
9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry
materials. Refer to the notes at the end of this form for more information)
® No q Yes - complete table G
10. Identify if any of the following apply to the premises (tick applicable box/es)
adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H
on strategic port land under the Transport Infrastructure Act 1994 - complete table I
in a tidal water area - complete table J
11. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow,
water, etc.)
M No q Yes - ensure the type, location and dimension of each easement is included in the plans submitted
Page 5
12. Does the proposal include new building work or operational work on the premises? (including any
services)
q No ® Yes - ensure the nature, location and dimensions of proposed works are included in plans submitted
13. Is the payment of a portable long service leave levy applicable to this application? (refer to the notes at the
end of this form for more information)
® No - Go to question 15 q Yes
15. Has the local government agreed to apply a superseded planning scheme to this application under
section 96 of the Sustainable Planning Act 2009?
q No
Z Yes - provide details below
Date of written notice given by Reference number of written notice given
Name of local govemment
local government by local government (if applicable)
Noosa Shire council plan of development ACA -1 TPC 2850
16. List below all of the forms and supporting Information that accompany this application (include all IDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this
question does not apply for applications made online using Smart eDA)
Method of lodgement to
Description of attachment or title of attachment
assessment manager
ARCHITECTS REPORT FOSTER DESIGNS PL 22ND JUNE 2011
1 ARCHITECTS PLANS FOSTER DESIGNS PL 22ND JUNE 2011 over the counter
LANDSCAPE PLANS
IDAS FORMS 1, 5, 6
17. Applicant's declaration
® By making this application, I declare that all information in this application is true and correct (note: it is
unlawful to provide false or misleading information).
Application Details - /
V--, 1 n IR n,.,
Page 6
qqq
Notes for completing this form
Question 8:
• Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required
for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is
required under section 263, then an application must contain, or be accompanied by, the written consent of the
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application.
• Owners consent is not required for a mobile and temporary ERA.
Question 9:
• Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation.
Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is
required to be given, and the evidence required, to support the application.
Question 13:
• The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable
long service leave levy is payable.
• The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.
Question 14:
• The portable long service leave levy need not be paid when the application is made, but the Building and
Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
permit is issued.
• Building and Construction Industry Notification and Payment Forms are available from any Queensland post
office or agency, on request from QLeave, or can be completed on the QLeave website at
www.aleave.gld.gov, au. For further information contact QLeave on 1800 803 481 or www.gleave.glld,gov.au.
Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a
purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act
2009) or as required by Parliament. This information may be stored in a departmental database. The information
collected will be retained as required by the Public Records Act 2002.
OFFICE USE ONLY
Date received Reference numbers
NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER
Council. I have been engaged as the private certifier for the
To:
building work referred to in this application.
Date of BSA Certification Building
Name
engagement license number classification/s
Application Details - I
Version 1 0 18 Devi
Page 7
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
Date receipted
QLeave Project Amount form sighted by Name of officer who
Description of the work Date paid
Number paid ($) assessment sighted the form
manager
1
The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This
form and all other required application materials should be sent to your assessment manager and any referral
agencies.
Page 8
Integrated Development Assessment System form
Material change of use assessable against a planning
scheme - IDAS form 5
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
This form must be completed for development applications for a material change of use assessable against a
planning scheme.
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
• complete Applicant details - IDAS form I
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.
This form can also be used for development on strategic port land under the Transport Infrastructure Act 1994.
1. How is the premises identified / zoned in the applicable planning scheme? (if the premises involves
multiple zones, clearly identify the relevant zone for each lot in a separate row in the below table) Non-mandatory
Lot description
Applicable zone / precinct Applicable overlays
(i.e. street address or lot on plan details)
LOT 34 MARCUS DUNES COURT, EASTERN BEACHES. coastal protection
SP111721 ZONE 4a landslide hazard
2. How is the proposed use/s defined in the applicable planning scheme?
Planning scheme Days and
No. of dwelling /
ten No. of
General explanation of definition (include each hours of
tenancy units employees
the proposed use definition in a new row) operation
if a pp licable if applicable
(non-mandatory) ( ) (if applicable) ( )
1 Detached Dwelling 1
3. What type of approval is being sought for the material change of use?
® development permit q preliminary approval q both - provide details below
4. Are there any current approvals associated with this application for the change of use of the premises?
(eg. a preliminary approval)
No q Yes - provide details below
Department of Infrastructure and Planning QPIan 1 `Queensland
l\ Government
Page 9
5. Does the proposed use involve (tick applicable box/es)
the reuse of existing buildings on the premises ® No q Yes
new building work on the premises q No ® Yes
the reuse of existing operational works on the premises ® No q Yes
new operational work on the premises q No ® Yes
6. Confirm that the following mandatory supporting information accompanies this application
Confirmation Method of
All applications
of lodgement lodgement
a site plan drawn to scale (1:100, 1:200 or 1:500 are the recommended scales)
which shows the following:
• the location and site area of the land to which the application relates
(relevant land)
• the north point
• the boundaries of the relevant land
• any road frontages of the relevant land, including the name of the road
• the location and use of any existing or proposed buildings or structures on
the relevant land (note: where extensive demolition or new buildings are
proposed, two separate plans (an existing site plan and proposed site plan)
may be appropriate) confirmed
• any existing or proposed easements on the relevant land and their function
• the location and use of buildings on land adjoining the relevant land
• all vehicle access points and any existing or proposed car parking areas on
the relevant land. Car parking spaces for persons with disabilities and any
service vehicle access and parking should be clearly marked.
• for any new building on the relevant land, the location of refuse storage
• the location of any proposed retaining walls on the relevant land and their
height
• the location of any proposed landscaping on the relevant land
• the location of any stormwater detention on the relevant land
a statement about how the proposed development addresses the local
government's planning schemes and any other planning documents relevant to confirmed
the application
a statement about the intensity and scale of the proposed use (e.g. number of
employees, days and hours of operation, number of visitors, number of seats, confirmed
capacity of storage area etc.)
information that states:
• the existing or proposed floor area, site cover, maximum number of storeys confirmed
and maximum height above natural ground level for existing or new buildings
(e.g. information regarding existing buildings but not being reused)
• the existing or proposed number of on-site car parking bays, type of vehicle
cross-over (for non-residential uses) and vehicular servicing not
arrangement (for non-residential uses) applicable
Version 1.0 18 Decemb.
Page 10
Confirmation Method of
of lodgement lodgement
When the application involves the reuse of existing buildings
plans showing the size, location, existing floor area, existing site cover, existing q confirmed
maximum number of storeys, and existing maximum height above natural
not
ground level of the buildings to be reused
applicable
When the application involves new building work (including extensions)
floor plans drawn to scale (1:50, 1:100 or 1:200 are the recommended scales)
which show the following:
• the north point
• the intended use of each area on the floor plan (for commercial, industrial or
mixed use developments only) confirmed
• the room layout (for residential development only) with all rooms clearly
labelled
• the existing and the proposed built form (for extensions only)
• the gross floor area of each proposed floor area
elevations drawn to scale (1:100, 1:200 or 1:500 are the recommended scales)
which show plans of all building elevations and facades, clearly labelled to ® confirmed
identify orientation (e.g. north elevation)
plans showing the size, location, proposed site cover, proposed maximum ® confirmed
number of storeys, and proposed maximum height above natural ground level of
the proposed new building work not
applicable
When the application involves the reuse of other existing works
plans showing the nature, location, number of on-site car parking bays, existing confirmed
q
area of landscaping, existing type of vehicular cross-cover (non-residential
uses), and existing type of vehicular servicing arrangement (non-residential not
uses) of the works to be reused ® applicable
When the application involves new operational work
plans showing the nature, location, number of new on-site car parking bays, confirmed
proposed area of new landscaping, proposed type of new vehicle cross-cover
(non-residential uses), proposed maximum new vehicular servicing arrangement not
(non-residential uses) of the proposed new operational works q applicable
Notes for completing this form:
• This form can also be used for a material change of use assessable against the land use plan for Cairns airport
land or Mackay airport land. Whenever a planning scheme is mentioned, take it to mean land use plan for the
airport land.
Privacy - please refer to your assessment manager for further details on the use of information recorded in
this form.
OFFICE USE ONLY tin curer
Date received Z 5 JUL 2011 Reference numbers
The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and
all Ql;her required application materials should be sent to your assessment manager and any referral agencies.
able against a planning scheme - IDAS form 5
Version 10 18 December 2009
Page 11
m Integrated Development Assessment System form
Application Details - IDAS form I
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
• complete this form (Application details - IDAS form 1)
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.
Applicant details (note: the applicant is the person responsible for making the application and need not be the
owner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is
correct. Any development permit or preliminary approval that may be issued as a consequence of this application will
be issued to the applicant.)
Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another
applicant" button below.
Name/s (individual or company name in full) FOSTER DESIGNS PTY LTD
For companies, contact name MR RICHARD FOSTER
Postal address PO BOX 86; PEREGIAN BEACH; QLD 4573
Contact phone number 07 5448 3186
Mobile number (non-mandatory) 0417 623 252
Fax number (non-mandatory)
e-mail address (non-mandatory) [email protected]
1. What is the nature of development proposed? (tick all applicable boxes)
® material change of use of premises ^a )C; pmT1aI ountei
Z building work
Z operational work Z 5 JUL 2011
q reconfiguring a lot
Department of Infrastructure and Planning QPlan Queensland d
Page 12
2. What type of approval is being sought?
® development permit
q preliminary approval
0 both - provide details below
3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?
® No
q Yes - complete table A and then go to question 5
4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)
Table B - street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises
Lot on plan
Street Address
description
Local government area
Unit Street Street name and official Post Plan type (e.g. Logan,Caims)
Lot No.
No. No. suburb/locality name code and plan no.
1 lot 34 Marcus Dunes Court 34 SP 111721 Noosa
Z Street address / lot on plan
Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
q water e.g. jetty, pontoon)
Table C - premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g.
channel dredging in Moreton Bay)
Coordinates (note: place each set of
coordinates in a separate row) Zone Local government
Datum
reference area (If applicable)
Easting Northing Latitude Longitude
q GDA94
q WGS84
1
q other
5. Total area of the premises on which the development is proposed (indicate hectares or m2)
557 M2
6. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm, etc.)
1 VACANT LAND
7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.)
DETATCHED DWELLING
Application Details - iDAS form
Veision 10 18 December 200
Page 13
8. Is owner's consent required for this application? (refer to notes at the end of this form for more information)
q No
® Yes - complete either table D, table E or table F as applicable
Table D (note: do not complete this table if lodging the application on-line using Smart eDA)
Name of owner/s of the land x R
I/We, the above-mentioned owner/s of the land, s t to the making of this application.
00,
Signature of owner/s of the land x
Date x - / ,
Table E
Name of owner/s of the land
q The owners written consent is attached or will be provided separately to the assessment manager
Table F
Name of owner/s of the land
By making this application, I, the applicant, declare that the owner has given written consent to the making of
q the application.
9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry
materials. Refer to the notes at the end of this form for more information)
® No q Yes - complete table G
10. Identify if any of the following apply to the premises (tick applicable boxes)
adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H
on strategic port land under the Transport Infrastructure Act 1994 - complete table I
in a tidal water area - complete table J
11. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow,
water, etc.)
Z No q Yes - ensure the type, location and dimension of each easement is included in the plans submitted
Application Details - IDAS form 1
Version 1.0 18 December 2009
Page 14
12. Does the proposal include new building work or operational work on the premises? (including any
services)
q No ® Yes - ensure the nature, location and dimensions of proposed works are included in plans submitted
13. Is the payment of a portable long service leave levy applicable to this application? (refer to the notes at the
end of this form for more information)
® No - Go to question 15 q Yes
15. Has the local government agreed to apply a superseded planning scheme to this application under
section 96 of the Sustainable Planning Act 2009?
q No
® Yes - provide details below
Date of written notice given by Reference number of written notice given
Name of local government
local government by local government (if applicable)
Noosa Shire council plan of development ACA -1 TPC 2850
16. List below all of the forms and supporting information that accompany this application (include all IDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this
question does not apply for applications made online using Smart eDA)
Method of lodgement to
Description of attachment or title of attachment
assessment manager
ARCHITECTS REPORT FOSTER DESIGNS PL 22ND JUNE 2011
1 ARCHITECTS PLANS FOSTER DESIGNS PL 22ND JUNE 2011 over the counter
LANDSCAPE PLANS
IDAS FORMS 1, 5, 6
17. Applicant's declaration
® By making this application, I declare that all information in this application is true and correct (note: it is
unlawful to provide false or misleading information).
Application Details - IDAS form 1
Version 1.0 18 December 2009
Page 15
Notes for completing this form
Question 8:
• Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required
for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is
required under section 263, then an application must contain, or be accompanied by, the written consent of the
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application.
• Owner's consent is not required for a mobile and temporary ERA.
Question 9:
• Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation.
Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is
required to be given, and the evidence required, to support the application.
Question 13:
• The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable
long service leave levy is payable.
• The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.
Question 14:
• The portable long service leave levy need not be paid when the application is made, but the Building and
Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
permit is issued.
• Building and Construction Industry Notification and Payment Forms are available from any Queensland post
office or agency, on request from QLeave, or can be completed on the QLeave website at
www.gleave.gld.gov. au. For further information contact QLeave on 1800 803 481 or www gleave.gld.gov au.
Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a
purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act
2009) or as required by Parliament. This information may be stored in a departmental database. The information
collected will be retained as required by the Public Records Act 2002.
OFFICE USE ONLY it Lountei
Date received 2011 Reference numbers
NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER
Council. I have been engaged as the private certifier for the
To:
building work referred to in this application.
Date of BSA Certification Building
Name
engagement license number classification/s
Application Details - IDAS form 1
Version 1 0 18 December 2009
Page 16
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
Date receipted
QLeave Project Amount form sighted by Name of officer who
Description of the work Date paid
Number paid ($) assessment sighted the form
manager
1
The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This
form and all other required application materials should be sent to your assessment manager and any referral
agencies.
appncation uerans - ►uAJ ►
Version 1 0 18 December
Page 17
I Integrated Development Assessment System form
3uilding or operational work assessable
against a planning scheme - IDAS form 6
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
This form must be completed for development applications for building works or operational work assessable against
a planning scheme.
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
• complete Applicant details - IDAS form 1
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.
This form can also be used for development on strategic portland under the Transport Infrastructure Act 1994.
1. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es)
q building work - complete table A ® operational work - complete table B
Table B
What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es)
q road works q stormwater q water infrastructure
q drainage Works ® earthworks q sewerage infrastructure
q landscaping q signage q clearing vegetation under the planning scheme
q other - please specify below
What type of approval is being sought? (if you have indicated multiple works in the above question, please
use an attachment to this form to detail each approval request)
® development permit q preliminary approval q both - specify below
Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
® No q Yes - specify the number of lots being created
Are there any current approvals associated with this application? (e.g. material change of use)
q No q Yes - provide details below
Page 18
2. What is the dollar value of the proposed building work? (inc GST, materials and labour) $ 0.00
Building and operational work assessable against a planning scheme - IDAS form 6
Version 10 18 December 2009
Page 19
3. Confirm the following mandatory supporting information accompanies this application
Confirmation
Method of lodgement
of lodgement
All applications for operational works
site plans drawn to scale which show the following:
• the location and site area of the land to which the application relates
(relevant land)
• the north point
• the boundaries of the relevant land
• the allotment layout showing existing lots, any proposed lots (including
the dimensions of those lots), existing or proposed road reserves, ® confirmed
building envelopes and existing or proposed open space (note:
numbering is required for all lots)
• any existing or proposed easements on the relevant land and their
function
• any access limitation strips
• all existing and proposed roads and access points on the relevant land
a statement about how the proposed development addresses the local
government's planning schemes and any other planning documents confirmed
relevant to the application
Applications for operational works involving earthworks (filling and excavating)
drawings showing:
• existing and proposed contours
• areas to be cut and filled
• the location and level of any permanent survey marks or reference
stations used as datum for the works ® confirmed
• the location of any proposed retaining walls on the relevant land and
their height
• the defined flood level (if applicable)
• the defined fill level (if applicable)
Applications for operational works involving roadworks
drawings showing:
• existing and proposed contours
• the centreline or construction line showing chainages, bearings, offsets
if the construction line is not the centreline of the road and all
intersection points
• information for each curve including tangent point chainages and
offsets, curve radii, arc length, tangent length, superelevation (if
applicable) and curve widening (if applicable)
• kerb lines including kerb radii (where not parallel to centreline) and
tangent point changes (where not parallel to centreline)
• edge of pavement where kerb is not constructed q confirmed
• position and extent of channelisation
• location and details of all traffic signs, guideposts, guardrail and other
street furniture
• pavement markings including details on raised pavement markers
• catchpit, manhole and pipeline locations
• drainage details (if applicable)
• cross road drainage culverts (if applicable)
• concrete footpaths and cycle paths
• location and details for access points, ramps and invert crossings
• changes in surfacing material
assessable against a planning scheme - IDAS form
Version 1.0 18 December 201
Page 20
Confirmation
Method of lodgement
of lodgement
Applications for operational works involving stormwater drainage
drawings showing:
• existing and proposed contours
• drainage locations, diameters and class of pipe, open drains and
easements E] confirmed
• manhole location, chainage and offset or co-ordinates and inlet and
outlet invert levels
• inlet pit locations, chainage and offset or co-ordinates and invert and
kerb levels
Applications for operational works involving water reticulation
drawings showing:
• kerb lines or edge of pavement where kerb is not constructed
• location and levels of other utility services where affected by water
reticulation works
• pipe diameter, type of pipe and pipe alignment
• water main alignments J confirmed
• water supply pump station details (if applicable)
• minor reservoir details (if applicable)
• conduits
• location of valves and fire hydrants
• location of house connections (if applicable)
• location of bench marks and reference pegs
Applications for operational works involving sewerage reticulation
drawings showing:
• location of all existing and proposed services
• location of all existing and proposed sewer lines and manhole locations
• location of all house connection branches
• kerb lines or edge of pavement where kerb is not constructed
• chainages confirmed
• design sewer invert levels
• design top of manhole levels
• type of manhole and manhole cover
• pipe diameter, type of pipe and pipe alignment
• location of house connections (if applicable)
• sewer pump station details (if applicable)
Applications for operational works involving street lighting
drawings showing.
• location of all light poles and service conduits
• location of all other cross road conduits
• type of wattage and lighting
E] confirmed
• any traffic calming devices
• additional plans for roundabouts and major roads (if applicable)
• details of any variations to normal alignment
• details of lighting levels
Version 1.0 18 December
Page 21
-1C
Confirmation
Method of lodgement
of lodgement
Applications for operational works involving public utility services
drawings showing:
• any existing light poles and power poles
• any existing underground services Oconfirmed
• details of proposed services
• alternation to existing services
Applications for operational works involving landscaping works
drawings showing:
• the location of proposed plant species
• a plant schedule indicating common and botanical names, pot sizes
and numbers of plants
• planting bed preparation details including topsoil depth, subgrade
preparation, mulch type and depth, type of turf, pebble, paving and confirmed
garden edge
• the location and type of any existing trees to be retained
• construction details of planter boxes, retaining walls and fences
• the proposed maintenance period
• irrigation system details
Notes for completing this form:
• This form can also be used for development applications for building works or operational works assessable
against the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is
mentioned, take it to mean the land use plan for the airport land.
Privacy -please refer to your assessment manager for further details on the use of information recorded in
this form.
OFFICE USE ONLY ,lent Countei
Date Received Reference Numbers
ThetSustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and
all other required application materials should be sent to your assessment manager and any referral agencies.
sessable against a planning scheme - IDAS ff
Version 1.018 December
Page 22
Page 1 of I
Mark Tapley
From: "Richard Foster" <[email protected]>
To: <[email protected]>
Sent: Tuesday, 5 July 2011 9:38 AM
Subject: Tapley residence
Hi Mark,
I went out to council last week,
They advise that fee for submission of plans will be
1. mcu assesment against approved plan of development, $1,014.00
2. Operational works assesment Bulk earthworks, in a landslip hazard area $1,483.00
The officer I spoke to suggested that the Body Corporate approval should be attached to our submission,
and therefore we should wait for this to occur before submitting.
We have also been chasing Peter Rinecker regards Soils report. I will chase him again.
Regards Richard and Jane
F fosterdesigns
PTY LTD ARCHITECTS
CRW Foster Old Board Arch. Reg. NO 002793
Suite 718 be St
Peregian Beach 0 P 07 5448 3188
PO Box 86 F 07 5448 1415
Peregian Beach 4573 E [email protected]
ELECTRONIC TRANSFER DISCLAIMER
FOSTER DESIGNS PTY LTD advise this E-mail drawing/documents
project specific and forwarded solely for the information /co-ordinate of the party
to whom we have transmitted it. It is confidential and may contain copyright
material of FOSTER DESIGNS Pty Ltd and should be read by the intended
addressee only. If the recipient of this E-mail is not the intended addressee only,
please call FOSTER DESIGNS on (07) 5448 3186 and promptly delete
this E-mail and Attachments.
FOSTER DESIGNS Pty Ltd are not responsible for re-use nor liable
for alterations therto.
The recipient will be liable for all subsequent alterations and re-transmittals.
Co-ordinating personnel must confirm the accuracy and adequacy of
information relative to their expertise before preparing their own
documentation
22/07/2011
Used in these records
Development Application Part 1 of 2 IDAS Forms 1 & 5 & 6 MCU11/0168 & OPW11/0257Related documentApplication case desk ↗
Development Application Part 1 of 2 IDAS Forms 1 & 5 & 6 MCU11/0168 & OPW11/0257Related documentApplication case desk ↗
About this file
- File size
- 3.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.