Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Development Application Part 1 of 2 IDAS Forms 1 & 5 & 6 MCU11/0168 & OPW11/0257

of 22

Text shows just the words. Original shows the document exactly as it was published.

    I                          Integrated Development Assessment System form


    3uilding or operational work assessable
    against a planning scheme - IDAS form 6
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)

This form must be completed for development applications for building works or operational work assessable against
a planning scheme.

You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
•     complete Applicant details - IDAS form 1

•     complete any other forms relevant to your application
•     provide any mandatory supporting information identified on the forms as being required to accompany your
      application.

All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.

This form can also be used for development on strategic portland under the Transport Infrastructure Act 1994.


1. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es)


q building work - complete table A                    ® operational work - complete table B



Table B


          What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es)


          q road works                   q stormwater                    q water infrastructure
          q drainage Works               ® earthworks                    q sewerage infrastructure
          q landscaping                  q signage                       q clearing vegetation under the planning scheme
          q other - please specify below

          What type of approval is being sought? (if you have indicated multiple works in the above question, please
          use an attachment to this form to detail each approval request)

          ® development permit                q preliminary approval                q both - specify below

          Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)

          ® No          q Yes - specify the number of lots being created

         Are there any current approvals associated with this application? (e.g. material change of use)


          q No          q Yes - provide details below

Used in these records

About this file

File size
3.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 1 of 2 IDAS Forms 1 & 5 & 6 MCU11_0168 & OPW11_0257.pdf · 3.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.