Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Attachment L Flood Risk Management Plan

of 14

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Lett eda ed
Beetgced

Location of Hazard, Hot Spot or
cin

Pernt
Aerie
evidence of
fee

eer sca
ST a ae
recency

 

Flooding of Six Mile Creek

Pockets of tourists (unfamiliar
with Pomona local hazards)
staying at Showground Caravan
Park

Lack of emergency or
evacuation packs in homes

Succession plan for Chair of
Pomona DM Sub-group

Various bridges span six mile creek
in the north and east of Pomona.
The bridge closures forces limited
exit or entry routes into/out of
Pomona

| Pavilion Rd

Council monitors
water levels at
bridges

| Caretaker

Tim Congram

5485 1477

"| Noosa LDC to

assist in preparation
phase

See Annex F —
Specific Actions in
Flooding for sequence
of probable flooding

Needs publicity and
awareness literature

Nominate deputies to
take over when Chair
is away

25
Log in to download the original file

Attachment L Flood Risk Management Plan.pdf · 2.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.