Original source · versioned page text
Attachment L Flood Risk Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnLett eda ed Beetgced Location of Hazard, Hot Spot or cin Pernt Aerie evidence of fee eer sca ST a ae recency Flooding of Six Mile Creek Pockets of tourists (unfamiliar with Pomona local hazards) staying at Showground Caravan Park Lack of emergency or evacuation packs in homes Succession plan for Chair of Pomona DM Sub-group Various bridges span six mile creek in the north and east of Pomona. The bridge closures forces limited exit or entry routes into/out of Pomona | Pavilion Rd Council monitors water levels at bridges | Caretaker Tim Congram 5485 1477 "| Noosa LDC to assist in preparation phase See Annex F — Specific Actions in Flooding for sequence of probable flooding Needs publicity and awareness literature Nominate deputies to take over when Chair is away 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.