Page 2
General Site Information - Overview This Riparian Rehabilitation Plan has been prepared to direct the ecological restoration of the waterway and immediately adjoining riparian zone within Lot 83 on MCH3546 located at 157 Lawnville Road, Black Mountain. A second order stream flows through the property which is mapped as waterway under Biodiversity, Waterways and Wetlands Overlay mapping within the Noosa Plan 2020. A Riparian Protection Area extends outwards from the mapped waterway and covers the majority of the site. The Biodiversity, Waterways and Wetlands Overlay Code within the Noosa Plan 2020 includes performance objectives PO6 and PO10 and acceptable outcomes (AO6.2) which requires the enhancement of riparian corridors and connectivity and rehabilitation of ecologically important areas. In this regard, this Rehabilitation Plan has been prepared to satisfy the relevant performance objectives of the Overlay Code. The Rehabilitation Area is proposed to encompass all existing riparian vegetation that adjoins the mapped waterway. The Rehabilitation Area has an average width of 25-30m and covers a total area of approximately 1.14ha (refer to Plate 1). The Rehabilitation Area is characterised by a band of riparian notophyll vine forest which is flanked by mowed grass. Plates 2 and 3 depict existing conditions within the Rehabilitation Area. The Rehabilitation Area contains moderate to high in-situ ecological resilience, with a diversity of native recruitment occurring in the ground stratum (refer to Plates 4 and 5). Selective weed control within the Rehabilitation Area is expected to encourage recruitment from the existing soil stored seed bank and from outside sources. The Rehabilitation strategy prescribed for the area will involve both reconstruction/revegetation and assisted natural regeneration as defined in the South East Queensland Ecological Restoration Framework - Manual (Chenowith LPA, 2012). The Rehabilitation Area is mapped by the Queensland Herbarium as containing the pre-clearing regional ecosystem RE 12.3.1 which is described as Gallery rainforest (notophyll vine forest) on alluvial plains. The existing tree species and native recruitment within the Rehabilitation Area was observed to be consistent with the regional ecosystem mapping. The narrow band of trees is dominated by mature Waterhousea floribunda (weeping lily pily), with Ficus coronata (creek sandpaper fig), Neolitsea dealbata (white bolly gum), Archontophoenix cunninghamiana (picabeen palm), Cryptocarya sp. (laurels) with mature Eucalyptus grandis (flooded gum) emergents also present. The edge of the waterway is dominated by a dense band of semi- aquatic herbs and macrophyte species including Lomandra hystrix (mat rush), and several native sedge species (Cyperus spp.). Several weed species occur within the Rehabilitation Area in generally low densities. Primary weed control and ongoing maintenance of the Rehabilitation Area is expected to assist in reducing the potential for weed dominance and over-competition as the native species composition re-establishes over time. Direct revegetation and the enhancement of the riparian corridor through the control of the existing invasive species is expected to satisfy the requirements of the relevant performance objectives contained within the Biodiversity, Waterways and Wetlands Overlay Code. The level of rehabilitation proposed is considered commensurate with the development proposed within the site, which is a low impact development that does not pose excessive impacts to the local environment. : 2s $ ; ug om es PLATE 1 - RIPARIAN REHABILITATION AREA BY “i Zl a PLATE 4 & 5 EXISTING CONDITION RIPARIAN REHABILITATION PLAN 157 LAWNVILLE ROAD, BLACK MOUNTAIN LEGEND DEVELOPMENT SITE [EBB iranian REHABILITATION AREA APPROXIMATELY 1.22ha COPYRIGHT © 2022 N
Page 3
RIPARIAN REHABILITATION PLAN 157 LAWNVILLE ROAD, BLACK MOUNTAIN LEGEND CL] DEVELOPMENT SITE ASSISTED NATURAL REGENERATION AREA APPROXIMATELY 1.1ha [) Revecetarion area APPROXIMATELY 1,100m2 COPYRIGHT © 2022
Page 4
1) REVEGETATION DESIGN Reconstruction/Revegetation is required within approximately 1,100m? within the rehabilitation area which is currently characterised by exotic grass and herbaceous weed species and is generally devoid of native vegetation. 2) REVEGETATION METHODOLOGY The methodology for the revegetation program is to generally occur in the following chronological order: 1. Slash existing pasture grasses to a maximum of 100mm height. Avoid existing native woody regrowth where possible. 2. Control existing pasture grass and herbaceous weeds by application of herbicide. Allow approximately 3 weeks after herbicide treatment before planting. Avoid herbicide treatment to existing native herb patches as far as practicable. Commence planting only once all items above have been completed. Water in plants as required (refer to Section 3.2). Install weed mats/mulch (refer to Section 3.3). Conduct follow up maintenance and replace failed plants as required (refer to Section 3.4 & 3.5). oo. & we 3) REVEGETATION SPECIFICATIONS 3.1 PLANTING SPECIFICATIONS Once weed treatment has taken effect, individual planting holes are to be manually dug or by a mechanical auger at the densities prescribed within this Plan. Plants are to be provided as 50mm native tubestock. As a minimum, all tubestock is required to: e Be of local provenance e = Have a significantly established root system but not root bound e Be healthy and display signs of active growth e Not display signs of yellowing, leaf or stem damage or disease root curling or restriction ° Be free of weeds in the container e Bea minimum of 30cm in height e Be sun hardened All tubestock is to be installed as per the Specification detailed in Plate 7 (as applicable). Slow-release fertilizer is to be installed into each planting hole as per the manufacturer’s recommended rates. Mt SHALLOW DISH JLCH NOT TO BE IN a min 20mm 0 DEPTH TO B BOAT AUN Ara AITIN UNDER RCOT; 1D SITE SOL At IPO! € SUBGRACE TC PLANTING HOLE CIAMETER 2 X PLANT POT CIAVETE EXISTING SUBGRADE Plate 7 —- Tubestock Planting Specification 3.2 Watering Planting is to occur as follows: e Planting must not occur unless soil moisture is adequate - do not undertake plant installation during periods of extreme dry weather conditions e All stock is to be watered immediately prior to planting and have a thorough initial establishment watering e All planting holes are to be pre-watered prior to plant installation e Apply an initial establishment watering The following watering schedule shall be implemented considering rain fall prior to, during and post plant installation: e Initial watering as specified in above section e One follow-up watering each week for the first 2 weeks after installation If dry conditions prevail, ensure sufficient watering is delivered at appropriate intervals to ensure the plants establish and thrive. Note that ongoing and increased frequency will be required should heatwave or ongoing dry spell conditions occur. 3.3 Mulch All plants are to have 350mm x 350mm organic mulch (e.g. tree mulch or straw) which is to be installed to a depth of 100mm (after settlement). 3.4 Replacement of Failed Plantings Monitoring is to be undertaken at the prescribed frequency and all failed/lost plants are to be replaced to maintain 100% of the original number of plants installed. All replacement plants are to be installed as per initial planting and watering requirements. All plants will be assessed to determine survival rate at the following prescribed frequencies and replaced as required: ¢ 1 month after initial installation e 6 months after initial installation e Prior to Off-Maintenance certification (i.e., 12 months after on-maintenance is granted) 3.5 Revegetation Maintenance The Revegetation Area is to have a weed maintenance schedule implemented for a twelve month period which includes herbicide application and brush cutting of pasture grass/herbaceous weeds. Maintenance activities are to include the following: ¢ Monitor plant survival and replace as specified and as required ¢ Identify and treat all weed species e Perform weed treatment activities in line with the SEQ Ecological Restoration Framework using the relevant APVMA Minor Use Permits e = Identify recruitment of naturally occurring species within planting area and retain e Water plants if required or at a specified timing 4) REVEGETATION SPECIFICATIONS 4.1 Plant Density Plants are to be installed at densities prescribed within Table 1, whilst Table 2 details the estimated total of plants required. Table 1 - Planting Density Trees 2m centres Shrubs 2m centres Lomandra hystrix 1m centres planted as a single row on outer edge of each revegetation area (approx. 180m) Table 2 - Estimated Planting Numbers Trees 175 Shrubs 175 Lomandra hystrix 180 4.2 Plant Diversity The following minimum plant diversity is to be achieved from species selected from Table 3: . 5 species of trees e 4 species of shrubs Table 3 lists revegetation species to be used. Table 3 — Revegetation Species red ash creek sandpaper fig Moreton white beech wild quince white boll iant water gum water gum weeping lil Alphitonia excelsa Ficus coronata Ficus macrophylla Gmelina leichhardtii Guioa semiglauca Neolitsea dealbata Ss ium francisii Tristaniopsis laurina Waterhousea floribunda Acmena smithii small-leaved lily pil Breynia oblongifolia coffee bush Cordyline rubra Im li Scolopia braunii flintwood Homalanthus nutans bleeding heart Ss ium australe creek che Species selection may be dependent on commercial availability at the time of planting. Species substitution is allowable provided it is guided by a suitably qualified and experienced practitioner (e.g., nursery staff or revegetation contractor) and only if substituted species are drawn from locally occurring riparian vine forest species. RIPARIAN REHABILITATION PLAN 157 LAWNVILLE ROAD, BLACK MOUNTAIN COPYRIGHT © 2022 N
Page 5
5) WEED MANAGEMENT
5.1 Assisted Natural Regeneration
A very low density of environmental weeds occurs within the Rehabilitation Area.
Assisted Natural Regeneration is anticipated to be the predominant management
activity as the principles apply:
e To natural areas where the native plant community is largely healthy and
functioning
e When native plant seed is still stored in the soil or will be able to reach the site
from nearby natural areas, by birds or other animals, wind, or water
e Where the natural regeneration processes (seedling germination, root
suckering, etc.) are being inhibited by external factors, such as weed invasion,
soil compaction, cattle grazing, mechanical slashing, etc.
e = When limited human intervention, such as weed control, minor amelioration
of soil conditions, erection of fencing, cessation of slashing, etc. will be enough
to trigger the recovery processes through natural regeneration
e When the main management issue is weed infestation and/or current land use
practices
The re-establishing plant community will be substantially similar in structure,
composition and diversity to the original vegetation type (based on the Regional
Ecosystem Pre-Clearing mapping). It is expected the general management techniques
are to follow the principles of:
. Identifying nodes of resilience
. Working to strengthen identified nodes and protect and encourage all existing and
naturally regenerating species through assisted natural regeneration processes
. Working outwards from nodes of resilience to increase the size of nodes and
gradually connect to other nodes of resilience.
All assisted natural regeneration works are to be undertaken by appropriately
experienced and qualified people utilising techniques as presented within Section 5
of the SEQ Ecological Restoration Framework Manual (Chenowith LPA, 2012).
5.2 Weed Species to be Controlled
Assisted natural regeneration will be applied throughout the in-tact areas within the
Rehabilitation Area which contain good in-situ ecological resilience and do not require
revegetation planting to restore natural biodiversity. The primary management
activities will be the selective targeted control of environmental weed species.
Weed management is to include the management of all environmental weeds from
the Rehabilitation Area including (but not limited to) those listed in Table 1, as well as
any additional weeds listed in the following documents:
Restricted Matters (Invasive Plants) listed under the QLD Biosecurity Act 2014
e Weeds of National Significance (WONS) under the Commonwealth Government
Weeds strategy
e Invasive Naturalised Plants in Southeast Queensland, 2002, Queensland
Herbarium
¢ Noosa Biosecurity Plan 2020
e Any other exotic plants known to exhibit weed characteristics (i.e., Invasive,
competitive characteristics)
5.3 General Methods
All works are to be conducted in line with the SEQ Ecological Restoration Framework.
All weed treatments to comply with, Minor Use Permit PER11463 & 82307, product
labels and individual SDS, and other applicable permits as well as the Chemical Usage
(Agricultural and Veterinary) Control Act 1988, Agricultural Chemical Distribution and
Control Act 1966, and the Work Health and Safety Act 2011 (including all applicable
Regulations).
All weed management works are to be conducted by experienced persons proficient
in both native species and weed species identification. The method adopted for
removal of weeds from the site will be dependent upon the physical stage of
development of individual weed specimens. Only herbicides registered for aquatic
use as detailed on the manufacturer’s specifications are to be applied. Herbicide
sprays should be applied in non-windy conditions in order to prevent incidental
poisoning of native species and not on days preceding forecast rainfall. Those
responsible for managing weeds need to consider the sensitivity of frog larvae and
other aquatic fauna to herbicides and wetting agents before use.
5.4 Weed Control Area Identification
Weed control is to be undertaken within the entirety of the existing vegetated
riparian corridor within the site as well as within defined revegetation areas to assist
in growth of planted tubestock.
5.5 Maintenance Schedule
An initial primary weed control event is to occur in which woody weeds are to be
poisoned in-situ (drilled/frilled and poisoned) and all other visible weeds (excluding
exotic grasses) are treated. Exotic grasses are not to be poisoned. It is anticipated that
grass species will be outcompeted and shaded out once native species regenerate.
Follow up maintenance is to be enacted for a period of one year. The frequency of
the maintenance schedule is to be one maintenance event six months after primary
weed control is complete, with a final follow up weed control event at the end of the
twelve-month maintenance period (i.e., a total of two weed maintenance events
following primary weed control).
5.6 Weed Coverage
A list of weed taxa observed within the Rehabilitation Area prior to works commencing
is detailed in Table 4. This list is indicative only. Overall weed management is to be
guided by the specifications as detailed in Section 5.2.
TABLE 4— WEED SPECIES LIST
Comm
Ardisia crispa coral berry |
Cinnamomum camphora camphor laurel R
Desmodium uncinatum silver leaved Desmodium |
Lantana camara lantana
Ligustrum sinense small-leaved privet
Megathyrsus maximus green panic I
Murraya paniculata mock orange I
Paspalum mandiocanum broad-leaved paspalum I
Passiflora edulis passionfruit |
Passiflora subpeltata white passionfruit |
Solanum mauritianum wild tobacco |
RIPARIAN REHABILITATION PLAN
157 LAWNVILLE ROAD,
BLACK MOUNTAIN
Sphagneticola trilobata Singapore daisy R
Syagrus romanzoffiana Cocos palm I
Tradescantia fluminensis Trad I
| = Invasive species
R = Restricted Invasive Plant under the Queensland Biosecurity Act 2014
6) PERFORMANCE CRITERIA
The progress of the rehabilitation is to be qualitatively assessed against Key
Performance Indicators (KPI) that have been developed to determine completion
of the rehabilitation works (refer to Table 5). KPls represent a benchmark of
expected progress of rehabilitation works within the 12 month management
period. These KPI must be met for the works to be considered complete and
granted off-maintenance. At the end of the twelve month maintenance period, a
monitoring report must be prepared by a suitably qualified person and submitted
to Council demonstrating that the KPI have been met.
TABLE 5 — KEY PERFORMANCE INDICATORS
ASSISTED NATURAL REGENERATION AREA
Native Evidence of native recruitment throughout majority of
Regeneration Rehabilitation Area.
Weed <5% weed cover (low threat environmental weeds) in any
Cover 5m x 5m plot (excluding exotic grass species)
0% woody weeds (>1m high) or Restricted Invasive Plant
species regulated under Biosecurity Act 2014
REVEGETATION AREAS
COPYRIGHT © 2022 N
Desired height of Average of height >1m
trees and shrubs
One tree/shrub per 4m? (i.e., planted at 2m centres)
An outer row of Lomandra Hystrix
Plant density
175 Trees
175 Shrubs
180 Lomandra
Plant numbers
All failed plants to be replaced to meet the Plant Density KPI
of 100%
Plant mortality
Minimum plant 5 species of trees