Original PDF page 9, section 1. The text section number identifies this passage in the reader.
LE ED
DU AT
S
HE IC
SC IND
AMENDMENTS
NT S
Rev Date Description By
½ PLANT PLA G A
N
IN ACI
A 14.10.21 Operational Works CI
SP
B 12.11.21 OPW CI
C 22.11.21 OPW CI
SPACING
D 06.12.21 OPW CI
Staggered pattern to densities as
scheduled. PLAN VIEW
Decorative gravel as Containerised plant material as per
DISTANCE FROM
Organic mulch as specified. EDGE OF KERB OR PAVEMENT
specified. planting schedule.
½ PLANT
SPACING Containerised plant
Topsoil as specified. material as per planting
Topsoil as specified. Containerised plant material as per
Turf as specified Plan view planting schedule. schedule
Organic mulch as specified
Imported topsoil as specified Organic mulch as specified. (Keep (keep 50mm clear of base
50mm clear of base of plant stems). of plant stems).
Ripped and cultivated Mulch to be installed 15mm below
subgrade as specified Ripped and cultivated finished kerb or retaining wall level.
sub-grade as specified. Ripped and cultivated Topsoil as specified
sub-grade as specified.
100
Topsoil as specified.
Existing subgrade
300
Ripped and cultivated sub-grade, Ripped and cultivated
add Terracottem®. subgrade as specified
Existing sub-grade
Existing sub-grade Existing sub-grade
Existing subgrade
01 Turf 02 Garden Bed 03 Gravel Mulch 04 Tubestock Planting on Natural Ground 05 Ground Cover Planting on Natural Ground
801 1:10 @ A1 801 1:10 @ A1 801 1:10 @ A1 801 1:20 @A1 801 1:20 @ A1
Bio-filteration planting.
Refer planting plan for
Bermed soil dish for water species
retention
Organic mulch as specified (keep Jute matting as specified
50mm clear of base of tree trunks).
Mulch to be installed 15mm below FALL FALL
Note:
adjoining surface. Surface treatment as specified All pipe connections where shown on drawings Drainage gravel trench as per Adjoining surface treatment as
refer to landscape plans. to fully penetrate depth of coupling housing subsurface drainage detail indicated on landscape plans.
Imported topsoil as specified and glued into position. finish surface to achieve falls to Filter media to engineers
Filter fabric with 400mm inlet specification
ROOTBALL Slow release fertiliser as specified
overlap minimum. 45 degree 3-way to stormwater
piping. 100mm subsurface drainage Connect field gully into flexible Transition & gravel layers
Ripped & cultivated subgrade as connected into gully pit as indicated to engineers detail
10-20mm diameter drainage 65-100mm stormwater or hard stormwater upstand
specified on landscape plans.
gravel. piping. provided by site plumber
2 Excavate hole for rootball as
specified Trench to be a minimum depth Existing subgrade
1 Existing subgrade of 300mm and width of 200mm.
100mm perforated or flexible STRAIGHT Existing subgrade Field gully as specified Ag pipe to engineers
PVC Ag. line with geo-textile detail
75
filter sock cover.
Subsoil drain clean out to
Existing Sub-grade RIGID UPVC COUPLINGS engineers detail
06 Shrub Planting on Natural Ground 07 Subsoil Drainage 08 Gully Pit 09 Bio Basion Planting
801 1:20 @ A1 801 1:10 @ A1 801 1:20 @ A1 801 1:20 @ A1
This drawing is protected by copyright. Form Landscape Architects Pty Ltd
Tree planting notes: retains the Copyright and Intellectual Property Rights. All rights reserved.
Drawings shall not be used for construction purposes until issued by Form
Landscape Architects Pty Ltd as "FOR CONSTRUCTION". Use figured
place rootball on firmed imported soil 45l - 200l tree -tease out base of dimensions only. Do not scale off this drawing. Verify all dimensions on site.
to achieve fsl. rootball prior to planting Report any discrepancies to the Landscape Architect for decision before
proceeding with any work.
Position plant so that the top soil level 100l - 200l tree -tease out base of
Not For Construction
Bermed soil dish for water retention Tree planting notes:
of the rootball is level with the rootball prior to planting
finished surface level. Imported topsoil as specified excavate a square hole twice the
width and 300mm deeper than the Treated hardwood timber stake (50 x
Tamp backfill lightly and form a Organic mulch as specified (keep
rootball. Break up base of hole to a 50 x 1800) -do not penetrate rootball -
temporary watering ring. 50mm clear of base of tree trunks).
further depth of 100mm. Loosen stake to penetrate 200mm minimum
Mulch to be installed 15mm below
compacted sides of the hole. into existing subgrade Form Landscape Architects
Water tree thoroughly to eliminate air finished kerb or retaining wall level
900 Ann Street [email protected]
pockets. Where subsoil is dry, fill hole with
Deep subsurface drains provided by 50mm nylon/hessian tie stapled to Trinity Lane, via Church Street ABN 29 097 234 305
water and let drain thoroughly prior to stake Adjoining garden bed as PO BOX 393 ACN 097 234 305
Refer finishes schedule for sizing. civil.
planting. specified. FORTITUDE VALLEY, QLD 4006 formla.com.au
Bermed soil dish for water retention T 07 3216 0606
Staple ties in a figure eight pattern 60° Cut angle. 150mm cut
approximately 300mm from the top of Organic mulch as specified (keep depth. CLIENT
ROOTBALL
50mm clear of base of tree trunks).
300
stakes. Drive in stake as specified.
Deluca
DEPTH
Position plant so that the top soil level Mulch to be installed 15mm below Adjoining turf as specified.
ROOTBALL
Ripped and cultivated subgrade as of the rootball is level with the finished kerb or retaining wall level PROJECT
specified finished surface level. Where possible, Noosa Youngcare
ROOTBALL
300
DEPTH
Root barrier to protect adjacent position the tree so that the branches ROOTBALL Imported topsoil as specified
structure. 32 Viewland Drive
do not rub against stakes or will in
2
300
Lightly compact site topsoil or washed Ripped and cultivated subgrade as Noosa Heads
future conflict with buildings or
specified
150
1 river sand in 150mm layers and place overhead wires. 60°
DATE PROJECT NORTH
100
rootball on top Lightly compact site topsoil or washed
2 Sept '21
300
100mm thick gravel drainage layer Tamp backfill lightly and form a river sand in 150mm layers and place
with filter fabric cover temporary watering ring. 1 rootball on top SCALE
ROOTBALL WIDTH 100 Ø corrugated perforated polyethylene 100mm thick gravel drainage layer As Shown@A1
pipe class 400 to water drainage layer and Water tree thoroughly to eliminate air with filter fabric cover 0 1 2 5M
2 X ROOTBALL WIDTH protect pavement from water ingress. pockets.
ROOTBALL WIDTH
Connect to stormwater system.
2 X ROOTBALL WIDTH DRAWING TITLE
Details
200 Softscape
DRAWN CHECKED BY PHASE
CI RH OPW
10 Street Tree Planting 11 Tree Planting on Natural Ground 12 Spade Edge PROJECT NO. DRAWING NO. REVISION
801 801 1:20 @ A1 801
1:20 @ A1 1:10 @A1 191206 801 D
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.