Original source · versioned page text
Lake MacDonald Drive Cooroy - WMP
Workplace Management Plan
Lake MacDonald Drive, Cooroy
In addition, pest management plans are consistent with legislation and guidelines published on the relevant
government website. The following links provide information on invasive species requirements.
http://www.daff.qld.gov.au/plants/weeds-pest-animals-ants/legislation-policies-permits/policies-and-guidelines
Different classes of pests require different levels of management. State guidelines must be viewed for
requirements depending on the class of the invasive species. Pest management on site is conducted in line with
the following process.
▪ Pest species are identified at the construction pre-commencement meeting, removal or management of
these species occurs where required
▪ All site personnel are informed of the locations and management of the invasive species.
▪ Heavy vehicles working on site are not removed from the job unless inspected by a certified inspector.
▪ Site vehicles remain on designated haul roads to prevent pest dispersal.
▪ If invasive species are sighted outside of restricted areas, the project management team are to notify the
client.
The Weed Hygiene Declaration Form IMS-05-64 is used to record all movements of plant in and out of the
project located within a declared weed infested zone.
Fire Ants
Shadforth takes all reasonable and practical measures to ensure fire ants are not spread through construction
activities associated with this project. Fire ants have been identified as a category 1 restricted pest under the
Biosecurity Act 2014. This site is not located in a Fire Ant Biosecurity Zone.
17. CONSTRUCTION ACTIVITIES
All construction activities are undertaken by Shadforth in line with client, council and state specifications,
standards and requirements. Refer to the TOD Project Specific Specifications.
Clearing and Grubbing
The Project Manger shall perform the following pre-commencement checks:
• Confirm that a permit/authorisation to clear and vegetation is in place;
The project team shall perform the following pre-commencement checks:
• Confirm that the survey set out for clearing is adequate and that the boundary of the area to be cleared is
clearly identified;
• Confirm that trees to be salvaged are clearly marked;
• Confirm that an excavation permit is in place;
• Confirm the location of existing services;
• Ensure that the equipment is safe and appropriate for the required tasks;
• Brief the work crew on the extent of the work.
The Foreman will ensure that clearing and grubbing does not take place outside the defined boundaries as per
the drawings.
Cleared and grubbed material will be disposed of as directed by the Superintendent.
The area is to be checked off by the Foreman.
IMS-04-01_P – Reviewed – September 2020 Document Uncontrolled When Printed Page 42 of 60
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original