Original source · versioned page text
Attachment 6 - Traffic Impact Assessment
Attached to the e-mail MCU16/0044 & REC16/0009 Development Application - Att 3F2 and Att 4,5,6 & 7 - Email 4 of 4.
2.0 Proposed Development
The proposed development is depicted on Sparks Architects drawings 97 SD A.1.1, SD A.1.2, SD B1.1,
SD C.1.1, and SD C.1.2, as well as on Callaghan & Toth drawing numbers 1532-01B, 1532-02B, 1532-
03B, and1532-04B.
From a traffic engineering perspective the development involves the following elements:
(i) Construction of a new IT digital hub office building having a GFA of 554 sq m (including 30 sq
m café) fronting David Low Way.
(ii) Construction of new community house building having a GFA of 335 sq m fronting Rufous
Street. This includes 23 basement parking spaces accessed via Rufous St.
(iii) Conversion of the existing community house building at the southern corner of the David Low
Way / Woodland Drive intersection, to a new IT digital hub office building having a GFA of 329
sq m.
(iv) Construction of a new 59 space carparking area, plus 2 short term loading bays, having access
via the existing left turns only driveway to David Low Way, with 42 of those parking spaces
(and the 2 short term loading bays) on the IT digital hub office building allotment, and 17
spaces on the community house building allotment.
15.s.24.2 Page - 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.