Original source · versioned page text
Attachment 6 - Traffic Impact Assessment
Attached to the e-mail MCU16/0044 & REC16/0009 Development Application - Att 3F2 and Att 4,5,6 & 7 - Email 4 of 4.
indicated weekday peak hour periods of 7.30-8.30am and 2.30-3.30pm, and a Saturday peak hour of
10.45-11.45am.
Existing peak hour traffic flows indicated by those surveys were as follows:
Existing Sept weekday AM peak:
David Low Way
4 5 490
Woodland 13
Drive 51
19 410 24
David Low Way
Existing Sept weekday PM peak:
David Low Way
2 8 476
Woodland 13
Drive 34
29 443 25
David Low Way
Existing Sept weekend peak:
David Low Way
1 5 443
Woodland 13
Drive 51
21 417 18
David Low Way
15.s.24.2 Page - 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.