Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Attachment 6 - Traffic Impact Assessment

Attached to the e-mail MCU16/0044 & REC16/0009 Development Application - Att 3F2 and Att 4,5,6 & 7 - Email 4 of 4.

of 12

Page text shows just the words. Original shows the document exactly as it was published.

Way, we have assumed that 60% of generated traffic would be oriented in the north along David Low
Way, with 40% being oriented in the south along David Low Way.

On the above basis, preliminary predicted peak hour traffic flows generated by the proposed
development, with allowance for future additional parking in Rufous Street, are as follows:


Predicted AM generated:
                                             David Low Way
                                                 29 14




                  Woodland       1
                  Drive          1




                                               19 4    2
                                             David Low Way



Predicted PM generated:
                                             David Low Way
                                                  1 2




                  Woodland       29
                  Drive          19




                                               1 14 10
                                             David Low Way



3.3 Future traffic projections

For the prediction of future year peak hour traffic flows at the Woodland Drive / David Low Way
intersection, we have conservatively adopted a base year scenario that comprises turning traffic flows to
and from Woodland Drive as indicated by the recent September 2015 survey, but we have adopted the
significantly higher through traffic flows along David Low Way as indicated by the Heron Street
intersection survey in May 2015. We have then made additional allowance for future traffic growth (at a
low rate of about 1%pa to the year 2036) along David Low Way.

Resultant traffic projections to the year 2036 with the proposed development fully operational, as well as
75 possible future parking spaces in Rufous Street are as follows:




15.s.24.2                                         Page - 6
Log in to download the original file

Attachment 6 - Traffic Impact Assessment.pdf · 1.6 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.