Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2015-03-31 I&S Committee - Item 4 - Attachment 1 - Flood Mitigation Investigation Ashgrove Dr Cooroy

of 34

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (16.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Flood Mitigation Investigation: Ashgrove Drive, Cooroy


8 QUALIFICATIONS & LIMITATIONS
This report has been prepared by HWMC specifically to provide advice to Noosa Council, DTMR
and GHD in relation to a preferred flood mitigation option for Ashgrove Drive Cooroy.

Our analysis and overall approach have been specifically tailored to the particular requirements of
this project and may not be applicable beyond this scope. For this reason, this report is not
authorised to be utilised for any purpose other than for the purpose stated in this report.

The design options presented in this report are concept designs only and additional investigation
and design is required prior to construction.

The investigation and modelling procedures adopted for this study follow current industry best
practice. However, the inherent uncertainties within an investigation of this nature should be taken
into account when interpreting the results outlined in this report.

This investigation is based upon various sources of data, information and assumptions which are
outlined within this report. The accuracy of this report is reliant upon the accuracy of this
information.




                                                                                                T
                                                                                        AF
                                                                                   R
                                                                              D




J00158D1V1                                                                                       14
Log in to download the original file

2015-03-31 I&S Committee - Item 4 - Attachment 1 - Flood Mitigation Investigation Ashgrove Dr Cooroy(PDF, 16MB).pdf · 16.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.