Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2015-03-31 I&S Committee - Item 4 - Attachment 1 - Flood Mitigation Investigation Ashgrove Dr Cooroy

of 34

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (16.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                                                                                                 0         20         40        60 (m)

                                                                                                          1:2000 (A3)




                                                                                         Legend

                                                                                                       DCDB
                                                                                                       Future Greenwood Grove Estate Lots
                                                                                                       Mitigation Option Model Line W ork
                                                                                                       Flow Velocity Vector




                                                                                                            Depth (m)
                                                                                                                6.0




                                                                                                                2.0



                                                                                                                0.5
                                                                                                                0.0




                                                                                       © Hydrology and Water Management Consulting Pty Ltd (HWMC) 2014.
                                                                                       HWMC endeavours to ensure that the inf ormation contained in this
                                                                                       f igure is correct at the time of publication. Furthermore, HWMC
                                                                                       makes no representations, w arranties or guarantees about its
                                                                                       accuracy, reliability, completeness or suitability for any
                                                                                       particular purpose. HWMC accepts no liability or responsibility
                                                                                       w hatsoever f or it in respect of any use of , or reliance upon,
                                                                                       this f igure by any third party.


                                                                                               Flood M itigation Investigation
                                                                                                  Ashgrove Drive, Cooroy

                                                                                                     Peak Flood Depth and
                                                                                                     Flow Velocity M apping




                                                                                                                                                   T
                                                                                          1% Annual Exceedance Probability
                                                                                                 Design Flood Event




                                                                                                                                   AF
                                                                                            (1 in 100 Chance Every Year)

                                                                                                      M itigation Case D01b

                                                                                                     Client: Noosa Council




                                                                                                                           R
                                                                                                                  D
C:\HWMC\Projects\J00158_Cooroy _Mitigation_f or_Noosa_Council\Calcs\MapInf o\Figures
Log in to download the original file

2015-03-31 I&S Committee - Item 4 - Attachment 1 - Flood Mitigation Investigation Ashgrove Dr Cooroy(PDF, 16MB).pdf · 16.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.