2015-03-31 I&S Committee - Item 4 - Attachment 1 - Flood Mitigation Investigation Ashgrove Dr Cooroy

of 34

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (16.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Flood Mitigation Investigation: Ashgrove Drive, Cooroy




                                                               TABLE OF CONTENTS

1     INTRODUCTION ...............................................................................................................................................1
2     AVAILABLE DATA .............................................................................................................................................2
3     EXISTING SITE TOPOGRAPHY AND FLOODING CHARACTERISTICS ....................................................................3
4     FLOOD MITIGATION ANALYSIS ........................................................................................................................5
    4.1      METHODOLOGY ..................................................................................................................................................5
    4.2      BASE CASE .........................................................................................................................................................5
    4.3      OPTIONS ANALYSIS ..............................................................................................................................................5
5     DISCUSSION ON THE PREFERRED OPTION........................................................................................................9
    5.1      PEAK FLOOD LEVEL IMPACTS .................................................................................................................................9
6     KEY HYDRAULIC REQUIREMENTS & DESIGN INPUTS FOR THE PREFFERED OPTION ........................................11
7     CONCLUSIONS ...............................................................................................................................................13
8     QUALIFICATIONS & LIMITATIONS ..................................................................................................................14
9     REFERENCES ..................................................................................................................................................15



List of Appendices

    Appendix A             Existing Case Peak Flood Depth and Flow Velocity Mapping
    Appendix B             Concept Design of Preferred Mitigation Option
    Appendix C             Mitigated Case Peak Flood Depth and Flow Velocity Mapping
    Appendix D             Peak Flood Level Impact Mapping




                                                                                                                                                                           T
                                                                                                                                                           AF
                                                                                                                                                  R
                                                                                                                                          D




J00158D1V1                                                                                                                                                                  iii
Log in to download the original file

2015-03-31 I&S Committee - Item 4 - Attachment 1 - Flood Mitigation Investigation Ashgrove Dr Cooroy(PDF, 16MB).pdf · 16.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.