Original source · versioned page text
2015-03-31 I&S Committee - Item 4 - Attachment 1 - Flood Mitigation Investigation Ashgrove Dr Cooroy
The original of this document is very large (16.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
0 30 60 90 (m)
1:3,000 (A3)
Legend
DCDB
Future Greenwood Grove Estate Lots
Mitigation Option Linework
Flow Velocity Vector
Impact
(m)
> 0.20
0.15 to 0.20
0.10 to 0.15
0.05 to 0.10
0.01 to 0.05
-0.05 to -0.01
-0.10 to -0.05
-0.15 to -0.10
-0.20 to -0.15
< -0.20
W as Dry, Now W et
W as W et, Now Dry
© Hydrology and Water Management Consulting Pty Ltd (HWMC) 2014.
HWMC endeavours to ensure that the inf ormation contained in this
f igure is correct at the time of publication. Furthermore, HWMC
makes no representations, w arranties or guarantees about its
accuracy, reliability, completeness or suitability for any
particular purpose. HWMC accepts no liability or responsibility
w hatsoever f or it in respect of any use of , or reliance upon,
this f igure by any third party.
Flood M itigation Investigation
Ashgrove Drive, Cooroy
Peak Flood Level Impact Map
T
0.05% Annual Exceedance Probability
Design Flood Event
AF
(Case D01b Vs B01b)
Client: Noosa Council
R
D
C:\HWMC\Projects\J00158_Cooroy _Mitigation_f or_Noosa_Council\Calcs\MapInf o\Figures
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.