Skip to the record
Search everything, all in one place.

Original source · versioned page text

2015-03-31 I&S Committee - Item 4 - Attachment 1 - Flood Mitigation Investigation Ashgrove Dr Cooroy

of 34

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (16.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Flood Mitigation Investigation: Ashgrove Drive, Cooroy


2 AVAILABLE DATA
A description of the data used in this investigation is tabulated below.


Table 2-1 Data Utilised for the Investigation
   Item
             Data Description
    No.

             The hydraulic model (TUFLOW) and the hydrologic model (XP-RAFTS) used by GHD for
     1       the modelling of the Bruce Highway Upgrade have been provided by GHD for use in this
             investigation.


             A 1 meter resolution digital elevation model (DEM) based on Aerial LiDAR survey captured
     2
             in 2008.


             Aerial photography captured in 2008 by the QLD Government department formerly known
     3
             as DERM.


             GHD’s Report for DTMR: Bruce Highway (Cooroy to Curra) Upgrade, Section A (Cooroy
     4       Southern Interchange – Sankeys Road); Hydraulic Analysis Supplementary Report
             (November 2012)




                                                                                                        T
                                                                                            AF
                                                                                       R
                                                                                  D




J00158D1V1                                                                                              2
Log in to download the original file

2015-03-31 I&S Committee - Item 4 - Attachment 1 - Flood Mitigation Investigation Ashgrove Dr Cooroy(PDF, 16MB).pdf · 16.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.