Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2015-03-31 I&S Committee - Item 4 - Attachment 1 - Flood Mitigation Investigation Ashgrove Dr Cooroy

of 34

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (16.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Flood Mitigation Investigation: Ashgrove Drive, Cooroy


Existing scenario Cooroy Creek flooding characteristics through the study area are shown in
Appendix A. Results are presented for the following design flood events:

      10% Annual Exceedance Probability (AEP) design flood. A flood of this magnitude has a
       1 in 10 chance of occurring every year.
      1% AEP design flood. A flood of this magnitude has a 1 in 100 chance of occurring every
       year.
      0.05% AEP design flood. A flood of this magnitude has a 1 in 2000 chance of occurring
       every year.

Results show that under existing conditions, major floods overtop the Bruce highway to the east of
Cooroy Creek and are directed straight towards the Ashgrove Drive Estate.

Aerial imagery of the study focus area is provided on Image 3-2.




                                                                                              T
                                                                                      AF




Image 3-2 Aerial Imagery of the Study Focus Area
                                                                                 R
                                                                            D




J00158D1V1                                                                                     4
Log in to download the original file

2015-03-31 I&S Committee - Item 4 - Attachment 1 - Flood Mitigation Investigation Ashgrove Dr Cooroy(PDF, 16MB).pdf · 16.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.