Council archive · source document
Information Request MCU25-0034 and OPW25-0048 · MCU25/0034
1. Provide sufficient detail to demonstrate how the proposed works achieve compliance
with The Noosa Plan 2020 – Waterways Works Code - Performance Outcome PO16 for
Character and Amenity and Performance Outcome PO19 for Design, Construction and
Safety for Jetties within Noosa Waters Estate Waterways
3. DUE DATE FOR RESPONSE TO INFORMATION REQUEST
The due date for providing the requested information is 22 July 2025. Email your response to
[email protected]. Please advise Council of your response to this information request
in accordance with section 13 of the Development Assessment Rules.
If you do not provide a response before the due date, it will be taken as if you have decided
not to respond to the information request and Council will continue with the assessment of
your application.
4. OTHER DETAILS
You can follow the progress of this application online at www.noosa.qld.gov.au. The “Online
Services” page can be accessed via "Quick Links" on the left hand side of the screen.
Should you have any further queries in relation to the above, please do not hesitate to contact
me on the number above.
Yours faithfully,
Mark Lewis
Coordinator Engineering
Page 2 of 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Information Request MCU25-0034 and OPW25-0048.pdfRelated documentApplication case desk ↗
About this file
- File size
- 291 KB (small file)
- File type
No other editions are linked here.