Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2014-08-25 General Committee Agenda

of 60

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   25 AUGUST 2014




                                     Page 22 of 60

GENERAL COMMITTEE MEETING AGENDA                                              25 AUGUST 2014

                   PERFORMANCE                              ACCEPTABLE
                       CRITERIA                              SOLUTIONS
      P2     Buildings and structures —     A2     (a) The side and rear boundary
                                                       clearance for a part of the
             (a)  provide adequate daylight            building or structure is —
                  and     ventilation    to             :                .
                  habitable rooms; and                  ()  in re ine a re at
             (b)  allow adequate light and                  1.5m; and
                 ventiation   2 1 sjackanls             (ii) where the height of that
                  cioini - t ulaings    on                  part is greater than 4.5m
                  adjoining lors.                           but not more than 7.5m -
             (c)  do not adversely impact                   2m; and
                  on   the   amenity   and              (iii) where the   height  is
                  privacy of residents on                   greater that 7.5m - 2m
                  adjoining /ofs.                           plus 0.5m for every 3m
                                                            or part exceeding 7.5m.
             Table A2                              (b)  For a rectangular or near
             Road Frontage     Side and Rear                ne narrow lot with a
                            Boundary Clearances           m or less frontage, the
                                                        minimum    side   and_= rear
                in metres        in metres                                      _
                         | asortess [451075            Setbacks for that part are
                                                        (i) where the height is not
          Hasor1a000 Hrs                                    more than 7.5m — in
                                                            accordance with Table
                                                            A2; and
                                                        (ii) where the height is more
                                                            than 7.5m — 2m plus
                                                            0.5m _ for every 3m or
                                                            part of 3m by which the
                                                            height exceeds 7.5m.
                                                   (c)  Structures may be exempted
                                                       from A2 (a) and (b) where —
                                                        (i)   the structure is not a
                                                            deck,   patio,  pergola,

                                                                                  Page 22 of 60
Log in to download the original file

2014-08-25 General Committee Agenda(PDF, 6MB).pdf · 6.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.