Reference Document MCU22-0102 Cubo Consulting Letter Final

of 10

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Engineering Buildable Solutions




Our Ref : 23122_LO_01/DB
Contact: Doug Black
21/12/2023
                                                                                  REFERENCE DOCUMENT
                                                                                       MCU22/0201
Kings Group (QLD) Pty Ltd                                                            NOOSA COUNCIL
PO Box 11,                                                                           15 AUGUST 2024
COOROY QLD, 4563

Attention: Joanne Hill




Dear Joanne,

PROPOSED CARWASH DEVELOPMENT, 34 ELM ST, COOROY QLD, 4563

Summary

This letter presents the results of a DRAINS drainage model including onsite detention for
the proposed development at the above address, and is intended as supporting information
for the Holistic Stormwater & Waste Water Management Plan, by TMC Building Design
Group, job number 20-032 CIV-Rev B, dated 11th May 2023.

The model found that the inclusion of 10.75m3 of onsite detention volume in the proposed
drainage arrangement will result in peak flow rates from the proposed development not
exceeding pre-development peak flow rates, for all events up to and including the 1% AEP
event with a 20% increase in rainfall intensity by 2100 for climate change.

The model was based on the drawings by CMG Consulting Engineers, 46143 rev C, issued
20/12/23.

Background

TMC have prepared a Water Management Plan for the proposed carwash development at
34 Elm St, Cooroy, stating that an effective reduction in impervious area draining from the
site will result in a reduction in peak flow rates from the site.

Noosa Council have requested more detail, specifically:

“A revised conservative assessment is required which demonstrates how peak flows will be
mitigated from the development to pre-existing levels, based on the rainwater tanks being
full.”

Existing Site Conditions

The existing site is currently unoccupied, with the previous motel having been demolished.
The site is surrounded on three side by roads with a bowling club on the eastern boundary.
The site falls generally to the southeast.


                                                                                      CUBO CONSULTING PTY LTD
                                                                                                ABN 46 610 277 462
                                                                   Elizabeth Court, Shop 16, 30 Karalta Rd Erina 2250
                                                                                PO BOX 315Avoca Beach NSW 2251
                                                                                                    www.cubo.net.au
                                                                                           Phone 02 4326 0990
Log in to download the original file

Reference Document MCU22-0102 Cubo Consulting Letter Final.pdf · 400 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 9 pages

Page 2

23122_LO_01 – 34 Elm St, Cooroy – King Group


The total area within the property boundaries is 2014m2.

Proposed Development

A carwash and takeaway food outlet is proposed for the site.

A 2m wide road widening easement on the northern boundary removes 80.4m2 from the
finished site, and further council conditioned publicly accessible footway on the eastern
boundary next to the bowling club removes 100.6m2 from the total site area, leaving a final
effective total site area of 1,837m2.

845m2 of roof area is to be directed to 60kL of on-site rainwater tank capacity, with the
overflow and surrounding paved areas to be directed to council’s piped stormwater system
in Opal Street.

Rainfall

It is likely that the existing street storm water system was designed pre-2016, and so was
designed using the ARR87 IFD rainfall rates to have sufficient capacity for the then existing
motel and other upstream sites.

The new development design uses the ARR2016 IFD rates and ARR2019 methodology to
determine peak flowrates from the site. Fortunately, for the sake of comparison between pre
and post development, for larger events the ARR87 rates for this location are very similar to
the ARR2016 rates.

The table below shows the comparable rainfall rates for event of 5 minutes duration.


 ARI                      1          2             5            10           20           50          100
 ARR87 mm/h 5            123        156           194          215          245          285          315
 mins
 AEP                    0.632       50%          20%           10%          5%           2%           1%
 ARR2016 mm/h 5          120        135          183           215          245          285          315
 min

Noosa Council have also requested that climate change be taken into account for the design,
in this case described as a likely 20% increase on ARR2016 rainfall intensity rates by the
year 2100.

Onsite Detention

An on-site detention arrangement is proposed to ensure peak flowrates from the site do not
exceed pre-development peak flowrates.

A revised stormwater drainage design proposes to provide 3x 20kL linked rainwater tanks
collecting roof water, with the top portions of the tanks functioning as OSD.

Keeping the invert of the OSD system 150mm above the invert of the adjacent gutter
(108.28m AHD at the driveway in Opal St) and allowing for 500mm cover above the tanks
(min FFL 109.35m AHD), a height of 420mm is available for detention.

Based on the drawings provided by TMC, each tank has an area of 8.5m2, resulting in an
available OSD volume of 3 x 0.42 x 8.5 = 10.75m3.

This leaves 49m3 of storage volume for reuse on site in the car washing process.




Civil, Structural & Hydraulic Engineering ⬧ Water Supply and Sewerage ⬧ Heritage ⬧ Planning ⬧ Environmental   Page 2 of 4

Page 3

23122_LO_01 – 34 Elm St, Cooroy – King Group


Modelling

A model of the site was prepared using DRAINS Version 2023.11.8718.30178, with site
specific rainfall data published by the BoM.

Catchments used the Horton method with post-development catchments based on the
design drawings by TMC, which can be summarised as:

    •     845m2 of roof area, 100% impervious
    •     718m2 of pavement, 100% impervious
    •     274m2 of landscaping, paved seating area, and small driveway areas, 38%
          impervious

All roof areas are directed to the rainwater/OSD tanks, which discharge into the site drainage
network that also collects the pavement areas, directs them through the treatment train, then
discharges into the piped stormwater network in Opal St.

The various landscaping, paved seating areas, and small driveway areas outside the site
network are assumed to drain uncontrolled across the boundary.

The rainwater tanks were assumed to be full to the OSD outlet invert, with outflow controlled
by a 105mm orifice on the outlet of Pit 1.

Two further catchments were added to model the natural state – 1,857m2, 0% impervious –
and the previous development – 1,857m2, 77% impervious.

The model was run for several events from 1EY to 1% AEP, for 5 minutes duration to 2
hours.

Results

The table below shows the peak flow rates for each event from the site for the natural state,
previous development, and proposed arrangement.

 Event       Natural State       Previous           Post               Comment
             (L/s)               Development        Development
                                 (L/s)              (L/s)
 1EY                       37             47                 33                Developed flows less than
                                                                                     predeveloped flows
       50%                 40                 54                  37           Developed flows less than
                                                                                     predeveloped flows
       20%                 63                 78                  53           Developed flows less than
                                                                                     predeveloped flows
       10%                 79                 94                  61           Developed flows less than
                                                                                     predeveloped flows
        5%                 93                109                  68           Developed flows less than
                                                                                     predeveloped flows
        2%               108                 130                  78           Developed flows less than
                                                                                     predeveloped flows
        1%               121                 146                  83           Developed flows less than
                                                                                     predeveloped flows
 1% x 1.2                148                 178                  97           Developed flows less than
                                                                                     predeveloped flows
DRAINS output for the model is attached.
The drainage design for the site can be further refined at the detailed design stage.




Civil, Structural & Hydraulic Engineering ⬧ Water Supply and Sewerage ⬧ Heritage ⬧ Planning ⬧ Environmental   Page 3 of 4

Page 4

23122_LO_01 – 34 Elm St, Cooroy – King Group


Conclusion

The modelling suggests that for all events up to and including the 1% AEP +20%, the
provision of on-site detention will ensure peak flowrates for the proposed development do
not exceed peak flow rates from the current conditions or the natural state of the site.

Modelling of downstream flooding conditions in Opal St would not be required as the peak
flow rates from the site are reduced by the proposed development and will therefore improve
pipe network flows through private land.

This satisfies the request from Noosa Council.

This letter is issued in accordance with our standard terms of engagement. This advice shall
not be construed as relieving any other party of their legal responsibilities or contractual
obligations




Yours Faithfully,




Vincent Francis Cubis
MIEAust CPEng NER RPEQ 10086 Registered Professional Engineer - Engineers Australia (231327)
Director
Cubo Consulting Pty Ltd




Civil, Structural & Hydraulic Engineering ⬧ Water Supply and Sewerage ⬧ Heritage ⬧ Planning ⬧ Environmental   Page 4 of 4

Page 5

 

0.035 0.039 108.24

 

108.04

 

107.08

0.146
°

90.121

Page 6

PIT / NODE DETAILS               Version 15
Name      Type        Family     Size       Ponding   Pressure Surface      Max Pond Base        Blocking x         y         Bolt-down id        Part Full Inflow     Pit is                                      Internal     Inflow is Minor Safe Major Safe
                                            Volume    Change     Elev (m) Depth (m) Inflow       Factor                       lid                 Shock Loss Hydrograph                                            Width        Misaligned Pond DepthPond Depth
                                            (cu.m)    Coeff. Ku                       (cu.m/s)                                                                                                                     (mm)                    (m)       (m)
Pit11      OnGrade    SIP        900 mm Sqre SIP             1.5    108.99                     0         0 10904.7 39979.4 Yes                 10 1 x Ku     No        New
Pit9       OnGrade    SIP        900 mm Sqre SIP             1.5    108.35                     0         0 11614.76 12060.86 Yes                8 1 x Ku     No        New
N44        Node                                                     108.32                     0           11962.15 6047.001                  172            No
P8A        OnGrade    SIP        1200 x 900 mm SIP           1.5    108.75                     0         0 20786.32 20354.95 No                12 1 x Ku     No        New
P8         OnGrade    SIP        600 mm Sqre SIP             1.5        109                    0         0 19599.84 22486.9 No                 11 1 x Ku     No        New
P9         OnGrade    SIP        600 mm Sqre SIP             1.5    108.75                     0         0 18454.5 12250.97 No                  7 1 x Ku     No        New
P7         OnGrade    SIP        600 mm Sqre SIP             1.5      109.3                    0         0 24549.84 29500.97 No                13 1 x Ku     No        New
N Diamond Node
           Ln                                                         109.5                    0            78677.1 12994.54                  175            No
N PreDev Node                                                       108.32                     0           12100.34 -2778.93              2231611            No
N Landscaping
           Node                                                       109.3                    0           25480.11 40093.27              2730476            No
P1         Sag        SIP        600 mm Sqre SIP7.866        1.5      109.6      0.15          0         0 55999.84 34975.97 No                 1 1 x Ku     No        New                                                                            0.05        0.15
N Natural Node                                                      108.32                     0            21620.7   -3988.7            10149475            No
N P1 DUMMY Node                                                       109.6                    0           57713.32 29911.36              8692681            No
P2         OnGrade    SIP        600 mm Sqre SIP             1.5      109.7                    0         0 55999.84 21650.97 No                 2 1 x Ku     No        New
P3         Sag        SIP        600 mm Sqre SIP0.765        1.5    109.65       0.05          0         0 58743.62 12509.4 No                  3 1 x Ku     No        New                                                                            0.05        0.05
P4         OnGrade    SIP        600 mm Sqre SIP             1.5    109.65                     0         0 33499.84 9990.973 No                 4 1 x Ku     No        New
P5 - Treatment
           OnGrade    SIP        600 mm Sqre SIP             1.5      109.6                    0         0 29949.84 8470.973 No                 6 1 x Ku     No        New
P6         OnGrade    SIP        600 mm Sqre SIP             1.5      109.2                    0         0 26699.84 9990.973 No                 5 1 x Ku     No        New

DETENTION BASIN DETAILS
Name     Elev       Surf. Area Not Used Outlet Type K                      Dia(mm)        Centre RL Pit Family Pit Type           x        y        HED          Crest RL   Crest Length(m)
                                                                                                                                                                                       id
OSD        108.425            1         Culvert                      0.5                                                           44912.91 36273.7 No                                   3728845
            108.43         25.6
            108.85         25.6
           108.855         0.72
              109.8        0.72
            109.85          100
              109.9         500

SUB-CATCHMENT DETAILS
Name       Pit or    Total      Paved     Grass     Supp                   Paved          Grass         Supp           Paved      Grass    Supp     Paved        Grass      Supp        Paved       Grass          Supp         Lag Time        Gutter       Gutter      Gutter     Rainfall
           Node      Area       Area      Area      Area                   Time           Time          Time           Length     Length   Length   Slope(%)     Slope      Slope       Rough       Rough          Rough        or Factor       Length       Slope       FlowFactor Multiplier
                     (ha)       %         %         %                      (min)          (min)         (min)          (m)        (m)      (m)      %            %          %                                                                   (m)          %
C P8       P8A           0.0335       100         0                   0               5             5              2                                                                                                                        0                                                1
C P7       P7            0.0093       100         0                   0               5             5              2                                                                                                                        0                                                1
C PreDev N PreDev        0.1837        77        23                   0               5             5              2                                                                                                                        0                                                1
C Landscaping
           N Landscaping 0.0274         0        62                  38               5             5              2                                                                                                                        0                                                1
C Roofs    OSD           0.0845       100         0                   0               5             5              2                                                                                                                        0                                                1
C P1       P1            0.0144       100         0                   0               5             5              2                                                                                                                        0                                                1
C Natural N Natural      0.1837         0       100                   0               5             5              2                                                                                                                        0                                                1
C p2       P2             0.006       100         0                   0               5             5              2                                                                                                                        0                                                1
C P3       P3            0.0086       100         0                   0               5             5              2                                                                                                                        0                                                1

PIPE DETAILS
Name      From        To         Length     U/S IL    D/S IL     Slope      Type       Dia        I.D.      Rough      Pipe Is                      No. Pipes Chg From At Chg           Chg         Rl             Chg          RL              etc
                                 (m)        (m)       (m)        (%)                   (mm)       (mm)                                                                                  (m)         (m)            (m)          (m)             (m)
Pipe6      Pit11      Pit9           27.926     107.15 106.971         0.64 Concrete, under roads,
                                                                                             600 1% minimum
                                                                                                       600     slope
                                                                                                                 0.013 New                                     1 Pit11              0
Pipe7      Pit9       N44             6.007 106.968       106.93       0.63 Concrete, under roads,
                                                                                             600 1% minimum
                                                                                                       600     slope
                                                                                                                 0.013 New                                     1 Pit9               0
Pipe3      P8A        P8              2.426 107.695 107.671            0.99 uPVC, under roads,150
                                                                                               1% minimum
                                                                                                       154 slope 0.012 New                                     1 P8A                0
Pipe4      P8         P9               10.3 107.671 107.568               1 uPVC, under roads,225
                                                                                               1% minimum
                                                                                                       242 slope 0.012 New                                     1 P8                 0
Pipe5      P9         Pit9            6.842 107.568        107.5       0.99 uPVC, under roads,225
                                                                                               1% minimum
                                                                                                       242 slope 0.012 New                                     1 P9                 0
Pipe2      P7         P8              8.585 107.757 107.671               1 uPVC, under roads,225
                                                                                               1% minimum
                                                                                                       242 slope 0.012 New                                     1 P7                 0
Pipe1      OSD        P1                3.1 108.425       108.21       6.94 uPVC, under roads,225
                                                                                               1% minimum
                                                                                                       242 slope 0.012 New                                     1 OSD                0
Pipe12     N P1 DUMMY P2             13.325     108.21 108.077            1 uPVC, under roads,225
                                                                                               1% minimum
                                                                                                       242 slope 0.012 New                                     1 N P1 DUMMY         0
Pipe13     P2         P3              9.544 108.077 107.982               1 uPVC, under roads,225
                                                                                               1% minimum
                                                                                                       242 slope 0.012 New                                     1 P2                 0
Pipe14     P3         P4             25.369 107.982 107.728               1 uPVC, under roads,225
                                                                                               1% minimum
                                                                                                       242 slope 0.012 New                                     1 P3                 0
Pipe10     P4         P5 - Treatment 3.862 107.728 107.689             1.01 uPVC, under roads, 90
                                                                                               1% minimum
                                                                                                        86 slope 0.012 New                                     1 P4                 0
Pipe9      P4         P6                6.8 107.728 107.653             1.1 uPVC, under roads,225
                                                                                               1% minimum
                                                                                                       242 slope 0.012 New                                     1 P4                 0
Pipe11     P5 - Treatment
                      P6              3.588 107.689 107.653               1 uPVC, under roads,150
                                                                                               1% minimum
                                                                                                       154 slope 0.012 New                                     1 P5 - Treatment     0
Pipe8      P6         P9              8.549 107.653 107.568            0.99 uPVC, under roads,225
                                                                                               1% minimum
                                                                                                       242 slope 0.012 New                                     1 P6                 0

DETAILS of SERVICES CROSSING PIPES
Pipe       Chg        Bottom Height of Service
                                        Chg                 Bottom         Height of Service
                                                                                      Chg               Bottom         Height of Service
                                                                                                                                  etc
           (m)       Elev (m)      (m) (m)                  Elev (m)           (m) (m)                  Elev (m)           (m) etc

CHANNEL DETAILS
Name     From         To         Type           Length      U/S IL         D/S IL         Slope         Base WidthL.B. Slope R.B. Slope Manning     Depth        Roofed
                                                (m)         (m)            (m)            (%)           (m)       (1:?)      (1:?)      n           (m)

OVERFLOW ROUTE DETAILS
Name    From     To              Travel         Spill       Crest          Weir           Cross   Safe Depth SafeDepth Safe          Bed        D/S Area                    id          U/S IL      D/S IL         Length (m)
                                 Time           Level       Length         Coeff. C       Section Major StormsMinor Storms
                                                                                                                         DxV         Slope      Contributing
                                 (min)          (m)         (m)                                   (m)         (m)        (sq.m/sec) (%)         %
OF222      P8A       N44                  0.1                                           4 m wide pathway 0.3        0.15         0.4       2.13          0                    411112       108.75         108.32         20.2
OF220      P7        P8A                  0.1                                           7.5 m roadway with0.3
                                                                                                            3% crossfall
                                                                                                                    0.15and barrier
                                                                                                                                 0.4kerb 4.37            0                    411109        109.3         108.75         12.6
OF2144     N Landscaping
                     N44                  0.3                                           4 m wide pathway 0.3        0.15         0.4       1.86          0                   2730479        109.3          108.4         48.4
OF7546     OSD       P1                   0.1       109.8            1.2              2 4 m wide pathway 0.3        0.15         0.4       0.43          0                   8176507        109.8         109.75         11.5
OF1        P1        P2                   0.2                                           4 m wide pathway 0.3        0.15         0.4       0.36          0                       179       109.75          109.7         13.7
OF2        P2        P3                   0.1                                           4 m wide pathway 0.3        0.15         0.4       0.52          0                       180        109.7         109.65          9.7
OF3        P3        N Diamond Ln         0.1                                           4 m wide pathway 0.3        0.15         0.4        2.5          0                       181        109.7          109.5            8


PIPE COVER DETAILS
Name      Type       Dia (mm) Safe Cover (m)
                                          Cover (m)
Pipe6     Concrete, under roads,
                           600 1% minimum
                                     0.6     slope
                                                0.73
Pipe7     Concrete, under roads,
                           600 1% minimum
                                     0.6     slope
                                                0.74
Pipe3     uPVC, under roads,154
                             1% minimum
                                     0.5 slope 0.9
Pipe4     uPVC, under roads,242
                             1% minimum
                                     0.5 slope 0.93
Pipe5     uPVC, under roads,242
                             1% minimum
                                     0.5 slope 0.6
Pipe2     uPVC, under roads,242
                             1% minimum
                                     0.5 slope 1.08
Pipe1     uPVC, under roads,242
                             1% minimum
                                     0.5 slope -0.25 Unsafe
Pipe12    uPVC, under roads,242
                             1% minimum
                                     0.5 slope 1.14
Pipe13    uPVC, under roads,242
                             1% minimum
                                     0.5 slope 1.38
Pipe14    uPVC, under roads,242
                             1% minimum
                                     0.5 slope 1.42
Pipe10    uPVC, under roads, 86
                             1% minimum
                                     0.5 slope 1.82
Pipe9     uPVC, under roads,242
                             1% minimum
                                     0.5 slope 1.3
Pipe11    uPVC, under roads,154
                             1% minimum
                                     0.5 slope 1.39
Pipe8     uPVC, under roads,242
                             1% minimum
                                     0.5 slope 0.93


This model has no pipes with non-return valves

Page 7

DRAINS results prepared from Version 2023.11.8718.30178

PIT / NODE DETAILS                       Version 8
Name       Max HGL Max Pond Max SurfaceMax Pond Min          Overflow Constraint
                     HGL      Flow Arriving
                                         Volume Freeboard (cu.m/s)
                              (cu.m/s) (cu.m)       (m)
Pit11         107.15                   0                1.84           None
Pit9          107.13                   0                1.22           None
N44           107.06               0.015
P8A           107.93               0.024                0.82         0 None
P8            107.84                   0                1.16           None
P9            107.81                   0                0.94           None
P7            107.84               0.006                1.46         0 Inlet Capacity
N Landscaping 109.31               0.016
P1            109.71   109.71       0.01        4.1        0     0.027 Outlet System
N P1 DUMMY 108.33                      0
P2            108.25               0.004                1.45         0 None
P3            108.17   109.66      0.006          0     1.48         0 Inlet Capacity
P4            107.93                   0                1.72           None
P5 - Treatment107.88                   0                1.72           None
P6            107.88                   0                1.32           None

SUB-CATCHMENT DETAILS
Name       Max        Paved     Grassed Paved          Grassed       Supp.     Due to Storm
           Flow Q     Max Q     Max Q     Tc           Tc            Tc
           (cu.m/s) (cu.m/s) (cu.m/s) (min)            (min)         (min)
C P8            0.019     0.019         0          5             5           2 10% AEP, 5 min burst, Storm 1
C P7            0.005     0.005         0          5             5           2 10% AEP, 5 min burst, Storm 1
C PreDev        0.094      0.08     0.014          5             5           2 10% AEP, 5 min burst, Storm 1
C Landscaping 0.013           0     0.013          5             5           2 10% AEP, 10 min burst, Storm 8
C Roofs         0.048     0.048         0          5             5           2 10% AEP, 5 min burst, Storm 1
C P1            0.008     0.008         0          5             5           2 10% AEP, 5 min burst, Storm 1
C Natural       0.079         0     0.079          5             5           2 10% AEP, 10 min burst, Storm 4
C p2            0.003     0.003         0          5             5           2 10% AEP, 5 min burst, Storm 1
C P3            0.005     0.005         0          5             5           2 10% AEP, 5 min burst, Storm 1


PIPE DETAILS
Name       Max Q      Max V     Max U/S Max D/S Due to Storm
           (cu.m/s) (m/s)       HGL (m) HGL (m)
Pipe6               0         0   107.15 107.129 10% AEP, 5 min burst, Storm 1
Pipe7            0.05      1.11 107.129 107.059 10% AEP, 15 min burst, Storm 5
Pipe3           0.019      1.03 107.862 107.838 10% AEP, 5 min burst, Storm 1
Pipe4           0.023      0.71 107.831 107.814 10% AEP, 5 min burst, Storm 1
Pipe5            0.05      1.42   107.75 107.672 10% AEP, 15 min burst, Storm 5
Pipe2           0.005      0.35 107.843 107.838 10% AEP, 5 min burst, Storm 1
Pipe1            0.04      0.87 109.724 109.706 10% AEP, 10 min burst, Storm 6
Pipe12          0.027      1.22 108.329 108.253 10% AEP, 30 min burst, Storm 9
Pipe13           0.03      1.03 108.222   108.17 10% AEP, 15 min burst, Storm 8
Pipe14          0.033      1.12 108.131 107.934 10% AEP, 15 min burst, Storm 7
Pipe10          0.004      0.61 107.911 107.882 10% AEP, 15 min burst, Storm 8
Pipe9            0.03       0.8 107.903 107.879 10% AEP, 15 min burst, Storm 8
Pipe11          0.004      0.19   107.88 107.879 10% AEP, 20 min burst, Storm 4
Pipe8           0.034      0.87 107.842 107.814 10% AEP, 15 min burst, Storm 8

CHANNEL DETAILS
Name     Max Q        Max V                            Due to Storm
         (cu.m/s)     (m/s)

OVERFLOW ROUTE DETAILS
Name    Max Q U/S Max Q D/S Safe Q     Max D     Max DxV Max Width Max V     Due to Storm
OF222           0         0      1.325         0         0      0          0
OF220           0         0      0.642         0         0      0          0
OF2144      0.011     0.011      1.239     0.023      0.01      4       0.35 10% AEP, 10 min burst, Storm 6
OF7546          0         0      0.596         0         0      0          0
OSD Ori     0.027     0.027                                                  10% AEP, 30 min burst, Storm 9
OF1             0         0      0.545         0         0      0          0
OF2             0         0      0.655         0         0      0          0
OF3             0         0      1.436         0         0      0          0


DETENTION BASIN DETAILS
Name     Max WL MaxVol         Max Q      Max Q     Max Q
                               Total      Low Level High Level
OSD          109.75       11.5       0.04      0.04          0

Run Log for 23122 v4
{\colortbl;\red0\green0\blue0;\red192\green0\blue0;}Run Log for 23122 v4.drn - DRAINS run at 12:21:53 on 21/12/2023 using Watercom Drains v2023.11.8718.30178

Page 8

Upwelling occurred at: P1
Flows were safe in all overflow routes.
These sag pits have unsafe water levels for minor storms: P1

Page 9

DRAINS results prepared from Version 2023.11.8718.30178

PIT / NODE DETAILS                       Version 8
Name       Max HGL Max Pond Max SurfaceMax Pond Min          Overflow Constraint
                     HGL      Flow Arriving
                                         Volume Freeboard (cu.m/s)
                              (cu.m/s) (cu.m)       (m)
Pit11         107.15                   0                1.84           None
Pit9          107.15                   0                 1.2           None
N44           107.08               0.021
P8A           108.19               0.032                0.56         0 Inlet Capacity
P8            108.01                   0                0.99           None
P9            107.95                   0                 0.8           None
P7            108.01               0.008                1.29     0.002 Inlet Capacity
N Landscaping 109.31               0.022
P1            109.77   109.77      0.032        7.9        0     0.028 Outlet System
N P1 DUMMY 108.35                      0
P2            108.31               0.016                1.39     0.002 Inlet Capacity
P3            108.24   109.66      0.008          0     1.41         0 Inlet Capacity
P4            108.09                   0                1.56           None
P5 - Treatment108.04                   0                1.56           None
P6            108.03                   0                1.17           None

SUB-CATCHMENT DETAILS
Name       Max        Paved     Grassed Paved          Grassed       Supp.     Due to Storm
           Flow Q     Max Q     Max Q     Tc           Tc            Tc
           (cu.m/s) (cu.m/s) (cu.m/s) (min)            (min)         (min)
C P8            0.028     0.028         0          5             5           2 1% AEP, 5 min burst, Storm 1
C P7            0.008     0.008         0          5             5           2 1% AEP, 5 min burst, Storm 1
C PreDev        0.146     0.119     0.026          5             5           2 1% AEP, 5 min burst, Storm 1
C Landscaping 0.019           0     0.019          5             5           2 1% AEP, 10 min burst, Storm 3
C Roofs         0.071     0.071         0          5             5           2 1% AEP, 5 min burst, Storm 1
C P1            0.012     0.012         0          5             5           2 1% AEP, 5 min burst, Storm 1
C Natural       0.121         0     0.121          5             5           2 1% AEP, 10 min burst, Storm 4
C p2            0.005     0.005         0          5             5           2 1% AEP, 5 min burst, Storm 1
C P3            0.007     0.007         0          5             5           2 1% AEP, 5 min burst, Storm 1


PIPE DETAILS
Name       Max Q      Max V     Max U/S Max D/S Due to Storm
           (cu.m/s) (m/s)       HGL (m) HGL (m)
Pipe6               0         0 107.154 107.154 1% AEP, 10 min burst, Storm 7
Pipe7           0.065       1.2 107.154 107.078 1% AEP, 10 min burst, Storm 7
Pipe3           0.029      1.56 108.059 108.012 1% AEP, 5 min burst, Storm 1
Pipe4           0.033      0.71 107.978 107.951 1% AEP, 5 min burst, Storm 1
Pipe5           0.066      1.58   107.81 107.706 1% AEP, 10 min burst, Storm 7
Pipe2           0.006      0.12 108.013 108.012 1% AEP, 5 min burst, Storm 1
Pipe1           0.056      1.21 109.801 109.773 1% AEP, 5 min burst, Storm 1
Pipe12          0.029      1.07 108.347 108.305 1% AEP, 5 min burst, Storm 1
Pipe13          0.034      0.86 108.272 108.243 1% AEP, 25 min burst, Storm 9
Pipe14          0.039      0.91 108.194 108.094 1% AEP, 25 min burst, Storm 9
Pipe10          0.004      0.64 108.068 108.037 1% AEP, 25 min burst, Storm 3
Pipe9           0.035       0.8 108.054 108.032 1% AEP, 25 min burst, Storm 9
Pipe11          0.004       0.2 108.034 108.032 1% AEP, 30 min burst, Storm 1
Pipe8           0.039      0.85 107.984 107.951 1% AEP, 25 min burst, Storm 9

CHANNEL DETAILS
Name     Max Q        Max V                            Due to Storm
         (cu.m/s)     (m/s)

OVERFLOW ROUTE DETAILS
Name    Max Q U/S Max Q D/S Safe Q     Max D     Max DxV Max Width Max V     Due to Storm
OF222           0         0      1.449         0         0       0         0
OF220       0.002     0.002       0.77      0.02      0.02    0.24      0.78 1% AEP, 5 min burst, Storm 1
OF2144      0.018     0.018      1.445     0.025      0.01       4      0.43 1% AEP, 10 min burst, Storm 5
OF7546      0.014     0.014      1.503     0.026      0.01       4      0.32 1% AEP, 10 min burst, Storm 7
OSD Ori     0.028     0.028                                                  1% AEP, 25 min burst, Storm 9
OF1         0.007     0.007      1.506     0.021      0.01       4      0.25 1% AEP, 25 min burst, Storm 4
OF2         0.002     0.002      1.501     0.013         0    1.33      0.26 1% AEP, 25 min burst, Storm 9
OF3             0         0      1.446         0         0       0         0


DETENTION BASIN DETAILS
Name     Max WL MaxVol         Max Q     Max Q     Max Q
                               Total     Low Level High Level
OSD          109.84       12.4     0.069     0.056     0.014

Run Log for 23122 v4
{\colortbl;\red0\green0\blue0;\red192\green0\blue0;}Run Log for 23122 v4.drn - DRAINS run at 12:22:33 on 21/12/2023 using Watercom Drains v2023.11.8718.30178

Page 10

Upwelling occurred at: P1
The maximum pond depth in these sag pits is unsafe: P1\line
Flows were safe in all overflow routes.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.