Council archive · source document
Acid Sulfate Management Plan · MCU16/0103
Plans and drawings: the text below has words only, no drawings.
FPE Ref: 4956-161019-1.0
Table 5: Groundwater Results
Analysis Units 4956-161019-GW1
Temperature °C 23.9
Turbidity NTU 854
In-situ TPS Water Quality Elec. Conductivity mS 3.85
Meter TDS (Salinity) ppk 2.27
pH - 7.02
Redox mV 5
Bicarbonate Alkalinity mg/L 560
Total Alkalinity mg/L 560
Chloride 750
Sulphate 180
SGS Environmental Calcium 96
Laboratory Magnesium 88
Potassium 35
Sodium 480
Iron (Dissolved) µg/L 48
Aluminium (Dissolved) µg/L 19
6.5 GROUNDWATER MANAGEMENT
Groundwater was detected at 0.83m bgl during the ASS investigation, however it is understood that no
groundwater will be required to be dewatered based on the construction proposed. However, should
construction design change or dewatering is required for any other reason, a dewatering plan must be
prepared prior to dewatering activities to ensure that any groundwater dewatered during the project is
appropriately treated onsite prior to discharge.
October 2016 Acid Sulfate Soil Investigation Report 15
New Duplex, Noosaville
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Acid Sulfate Management PlanRelated documentApplication case desk ↗
About this file
- File size
- 3.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.