Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

Acid Sulfate Management Plan · MCU16/0103

of 57

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
FPE Ref: 4956-161019-1.0


NOTICE TO USERS OF THIS REPORT
Apart from fair dealing for the purposes of private study, research, criticism, or review as
permitted under the Copyright Act, no part of this report, its attachments or appendices may be
reproduced by any process without the written consent of Future-Plus Environmental (“FPE”). All
enquiries should be directed to FPE.

We have prepared this report for the sole purposes of Dee Williams (“Client”) for the specific
purpose only for which it is supplied. This report is strictly limited to the Purpose and the facts and
matters stated in it and does not apply directly or indirectly and will not be used for any other
application, purpose, use or matter.

In preparing this report we have made certain assumptions. We have assumed that all
information and documents provided to us by the Client or as a result of a specific request or
enquiry were complete, accurate and up-to-date. Where we have obtained information from a
government register or database, we have assumed that the information is accurate. Where an
assumption has been made, we have not made any independent investigations with respect to
the matters the subject of that assumption. We are not aware of any reason why any of the
assumptions are incorrect.

This report is presented without the assumption of a duty of care to any other person (other than
the Client) (“Third Party”). The report may not contain sufficient information for the purposes of a
Third Party or for other uses. Without the prior written consent of FPE:
    a) this report may not be relied on by a Third Party; and
    b) FPE will not be liable to a Third Party for any loss, damage, liability or claim arising out of
        or incidental to a Third Party publishing, using or relying on the facts, content, opinions or
        subject matter contained in this report.

If a Third Party uses or relies on the facts, content, opinions or subject matter contained in this
report with or without the consent of FPE, FPE disclaims all risk and the Third Party assumes all
risk and releases and indemnifies and agrees to keep indemnified FPE from any loss, damage,
claim or liability arising directly or indirectly from the use of or reliance on this report.

In this note, a reference to loss and damage includes past and prospective economic loss, loss of
profits, damage to property, injury to any person (including death) costs and expenses incurred in
taking measures to prevent, mitigate or rectify any harm, loss of opportunity, legal costs,
compensation, interest and any other direct, indirect, consequential or financial or other loss.


Signed on behalf of                                                          Date: 26th October 2016
Future-Plus Environmental




Paul Wood
Director




October 2016                       Acid Sulfate Soil Investigation Report                           iii
                                         New Duplex, Noosaville

Used in these records

About this file

File size
3.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Acid Sulfate Management Plan.pdf · 3.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.