2021-10-08 SM - Item 1 - Attachment 2 - Draft Coastal Hazards Adaptation Plan - tracked changes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Liaise with beachfront asset owners to ensure their natural disaster
Other
management plans are mitigating erosion event risks where possible
Table 15 - Five year action plan for responding to projected coastal erosion risks in Noosa Heads
Other shire wide actions are also identified at the beginning of this Section 5.
Inundation Rrisks – Inundationto Noosa Heads
Inundation due to storm tide and increases in tidal extents present risks to public assets throughout
the planning horizon of this plan. In the present day, areas and assets at risk due to storm tide
include low-lying parks, road networks and buried infrastructure (e.g. stormwater networks), and
natural areas within Noosa Spit.
Permanent tidal inundation exposes many of the same assets that are subject to the effects of
storm tide inundation, however these events are lesser in area and depth, albeit on a much more
regular basis. It is this regularity that results in permanent tidal inundation representing a significant
risk to some assets within Noosa Heads. These assets include natural and recreational foreshore
assets along the river-side of Noosa Spit, Lions Park, as well as road and other network
infrastructure along Noosa Parade and Noosa Drive.
A small number of private commercial and tourism assets at the Hastings Street end of Noosa
Drive are expected to be exposed by 2100. Other private assets along Noosa Parade and Noosa
Drive are not considered at high risk from inundation due to elevated land and building floor
heights as a result of planning controls in place through successive planning schemes.
Asset Type Tidal Inundation Risks by Year
Present Day 2040 2070 2100
Tourism Low Very High
Business Low Very High
Residential Low
Infrastructure Low High Very High
18
Recreational Low Medium Very High
Natural Low
Table 16 - Change in Noosa Heads asset inundation risk profiles across planning horizons
At present, the only method for mitigating inundation risks in Noosa Heads is:
- Planning and land use regulations are in place for new development including minimum
floor heights for new buildings.
Inundation Aadaptation outcomes and associated actions – Inundationfor Noosa Heads
The assessment of inundation risks across Noosa Heads show the level of risk to some tourism,
business, recreational and infrastructure assets is likely projected to become intolerable in the later
decades of the century.
18 This result is due to risks to ‘Dog Beach’ and surrounds. Lions Park was rated medium risk by 2100.
Noosa Council – Coastal Hazards Adaptation Plan 2020 - 2030 Page 57
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.