Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2021-10-08 SM - Item 1 - Attachment 2 - Draft Coastal Hazards Adaptation Plan - tracked changes

of 108

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Figure 19 shows the expected progression of these preferred outcomes between 2020 and 2100.
Table 19. provides a breakdown of actions in support of these outcomes, to be pursued within the
five year life of this plan.




    Figure 19 - Preferred long-term adaptation pathway response to projected coastal inundation risks in Noosaville




The following actions will help progress the achievement of these outcomes:

 MANAGEMENT              ACTIONS FOR NOOSAVILLE – THE NEXT 5 YEARS
 RESPONSE
 AREA

 Land Use                Maintain land use planning approach and alignment with State Planning
 Planning                Policyexisting development requirements.

                         Investigate a range of backflow prevention methods and technology for parts
                         of the stormwater network identified as vulnerable
 Public
                         Investigate location, scale and design of adaptive landscape structures (e.g.
 recreational,
                         non-intrusive levees, innovative design features for garden beds, public
 built, and
                         furniture, park design and raised foreshore footpaths21) to prevent frequent,
 Infrastructure
                         shallow and low flow tidal inundation of parks and road corridors
 assets
                         Investigate road corridor designs that are more resilient to frequent wet/dry
                         scenarios and incorporate into asset renewal plans where appropriate




21 Depending on the location requirements, these may range in height up to 300mm in the case of raised

footpaths, or a height consistent with safety regulations in the case of barriers (e.g. approximately waist high)
Noosa Council – Coastal Hazards Adaptation Plan 2020 - 2030                                                   Page 62
Log in to download the original file

2021-10-08 SM - Item 1 - Attachment 2 - Draft Coastal Hazards Adaptation Plan - tracked changes(PDF, 5MB).pdf · 5.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.