Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2021-10-08 SM - Item 1 - Attachment 2 - Draft Coastal Hazards Adaptation Plan - tracked changes

of 108

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
The following actions will help progress the achievement of these outcomes:

 MANAGEMENT             ACTIONS FOR TEWANTIN – THE NEXT 5 YEARS
 RESPONSE
 AREA

 Land Use               Maintain land use planning approach and alignment with State Planning
 Planning               Policyexisting development requirements.

                        Investigate a range of backflow prevention methods and technology for
                        stormwater network assets identified as vulnerable

                        Investigate location, scale and design of adaptive landscape structures (e.g.
 Public                 non-intrusive levees, innovative design features for garden beds, public
 recreational,          furniture, park design and raised foreshore footpaths22) to prevent frequent,
 built, and             shallow and low flow tidal inundation of Ward Park, RSL Memorial Park, and
 Infrastructure         Tewantin Park and adjacent parking areas.
 assets                 Investigate road corridor designs that are more resilient to frequent wet/dry
                        scenarios and incorporate into asset renewal plans where appropriate

                        Investigate opportunities for maintaining functional approaches to Doonella
                        Bridge and the ferry to Noosa North Shore

 Foreshores and         Ensure landscaping and species management/selection appropriately
 Natural Areas          considers inundation risksNo actions proposed.

 Other                  No actions proposed.

           Table 21- Five year action plan for responding to projected coastal inundation risks in Tewantin.

Other shire wide actions are also identified at the beginning of this Section 5.




22 Depending on the location requirements, these may range in height up to 300mm in the case of raised

footpaths, or a height consistent with safety regulations in the case of barriers (e.g. approximately waist high)
Noosa Council – Coastal Hazards Adaptation Plan 2020 - 2030                                                    Page 66
Log in to download the original file

2021-10-08 SM - Item 1 - Attachment 2 - Draft Coastal Hazards Adaptation Plan - tracked changes(PDF, 5MB).pdf · 5.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.