2021-10-08 SM - Item 1 - Attachment 2 - Draft Coastal Hazards Adaptation Plan - tracked changes

of 108

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Adaptation outcomes and associated actions

The assessment of inundation risks to these localities show the level of risk to most asset type is
acceptable, with the exception of risks to natural areas expected to become intolerable by 2070.

Analysis of socio-economic, environmental, and governance considerations, as well as community
input, indicate the most appropriate adaptation pathway for responding to inundation risks in this
locality is one that seeks the continuing provision of key infrastructure services over the medium- to
long-term. As a result, the preferred adaptation outcome23 for this locality is:

    -    Service infrastructure assets accommodate the increase in inundation risk through adaptive
         design.

Figure 21 shows the expected progression of these preferred outcomes between 2020 and 2100.
Table 23. provides a breakdown of actions in support of these outcomes, to be pursued within the
five year life of this plan.




  Figure 21 - Preferred long-term adaptation pathway response to projected coastal inundation risks in these localities




The following actions will help progress the achievement of these outcomes:

 MANAGEMENT               ACTIONS FOR THESE LOCALITIES – THE NEXT 5 YEARS
 RESPONSE
 AREA

 Land Use                 Maintain land use planning approach and alignment with State Planning
 Planning                 Policyexisting development requirements.

 Public Assets and        Investigate a range of backflow prevention methods and technology for
 Infrastructure           stormwater network assets identified as vulnerable

 Foreshores and           No actions proposed.
 Natural Areas

 Other                    No actions proposed.

         Table 23 - Five year action plan for responding to projected coastal inundation risks in these localities.

Other shire wide actions are also identified at the beginning of this Section 5.
23 The risk to natural assets in this locality will be addressed via Shire-wide adaptation outcomes


Noosa Council – Coastal Hazards Adaptation Plan 2020 - 2030                                                           Page 68
Log in to download the original file

2021-10-08 SM - Item 1 - Attachment 2 - Draft Coastal Hazards Adaptation Plan - tracked changes(PDF, 5MB).pdf · 5.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.