Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Approach
QCoast2100

The CHAP has been developed through an eight-phase process (Figure 1) as outlined in the
QCoast2100 Minimum Standards and Guidelines (LGAQ and DEHP 2016). The QCoast2100 program
has been coordinated by the Local Government Association of Queensland (LGAQ) on behalf of
the Queensland Department of Environment and Science (DES). Incorporating regular community
engagement and consultation, the process has included the following key steps:

      Scope coastal hazard issues for the area of interest
      Identify areas exposed to current and future coastal hazards
      Identify key hazards potentially impacted
      Conduct risk assessments of key assets in coastal hazard areas
      Identify potential adaptation options and determine actions, costs, priorities and timeframes.




                     Figure 1 - Process for developing a Coastal Hazards Adaptation Plan


The outputs of each project phase have been subject to review and approval by LGAQ and DES.

Uncertainty is a key characteristic of climate change and long-term coastal management, and can
be viewed as a barrier to progressing important adaptation actions. This uncertainty should not
however be an excuse to delay planning or action. The appropriate approach to managing
uncertainty is to plan over multiple time horizons, and incorporate options that can be attuned to
needs as they change over time. This plan takes a ‘risk-based’ ‘monitor-review-manage’ approach

Noosa Council – Coastal Hazards Adaptation Plan 2020 - 2030                                   Page 6
Log in to download the original file

2021-10-08 SM - Item 1 - Attachment 2 - Draft Coastal Hazards Adaptation Plan - tracked changes(PDF, 5MB).pdf · 5.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.