Council archive · source document
Approved Plans · OPW11/0335
Plans and drawings: the text below has words only, no drawings.
Very large file (15.6 MB): may take a few minutes to open.
GENERAL NOTES: 1, ALL WORK ON THIS CONTRACT IS TO BE CARRIED OUT IN ACCORDANCE WITH THE JOB SPECIFICATION AND TO THE SATISFACTION OF THE LOCAL AUTHORITY AND THE ENGINEER. 2. THE CONTRACTOR IS TO CONTACT ENERGEX, TELSTRA, COUNCIL AND OTHER SERVICE AUTHORITIES AND LOCATE EXISTING UNDERGROUND SERVICES PRIOR TO CONSTRUCTION. 3. CONDUIT LOCATIONS IF SHOWN ON THE PLANS ARE PROVISIONAL ONLY AND THE CONTRACTOR IS TO LIAISE WITH THE ENGINEER, TELSTRA AND THE ELECTRICAL CONSULTANT FOR THEIR FINAL PLANS IMMEDIATELY PRIOR TO LAYING ROAD AND FOOTPATH CONDUITS. 4, THE ENGINEERING DESIGN IS BASED PARTLY ON A DATA TERRAIN MODEL COMPUTER GENERATED FROM THE SITE SURVEY AND SOME ELEMENTS OF THE SURVEY DATA ARE INTERPOLATED AND MAY VARY FROM THE ACTUAL SITE CONDITIONS. THE CONTRACTOR SHALL LIAISE WITH THE ENGINEER AND SURVEYOR AND SET OUT THE WORKS ONLY FROM APPROVED REFERENCE PEGS AND LEVEL BENCH MARKS. 5. THE CONTRACTOR IS TO ORGANISE HIS WORKS SO THAT EROSION, DEPOSITION OF SILT, AND STORMWATER RUNOFF FROM THE JOB SITE DOES NOT EXCEED THE PRE CONSTRUCTION RATES AT ANY POINT AS A RESULT OF HIS ACTIONS, 6. CLEAR ALL VEGETATION FROM THOSE AREAS TO BE EXCAVATED OR FILLED. IN OTHER AREAS WHERE CLEARING IS SPECIFIED, SELECTED CLEARING ONLY IS TO BE CARRIED OUT BY RETAINING THOSE TREES MARKED BY THE ENGINEER AND LEAVING THE AREA IN A CONDITION SUITABLE FOR SLASHING. 7, THE CONTRACTOR IS TO PRESENT UP THE JOB FOR ON- MAINTENANCE AND OFF-MAINTENANCE INSPECTIONS WHEN DIRECTED BY THE ENGINEER WITH ALL PIPES, ROADS AND ALLOTMENTS FREE OF RUBBISH OR SILT AND WITH FOOTPATHS AND PARK AREA SLASHED OR MOWN, AND UNDERGROUND SERVICES OPENED FOR INSPECTION, 8, NO WORK IS TO COMMENCE ON THE SITE UNTIL THE APPROVAL OF THE COUNCIL HAS BEEN RECEIVED IN WRITING AND AN OFFICIAL PRE-START MEETING WITH A REPRESENTATIVE OF COUNCIL AND THE ENGINEER HAVE BEEN HELD, THE CONTRACTOR IS TO OBTAIN A COPY OF THE MINUTES OF THE PRE-START MEETING AND SHALL COMPLY WITH ALL REQUIREMENTS THEREOF. 9, ALL CONSTRUCTION IS TO BE SET OUT BY THE CONTRACTOR FROM PEGGING OF ROAD CENTERLINE, MANHOLE POSITIONS, LOT STAKING AND TBMs PROVIDED BY THE PRINCIPAL'S LICENSED SURVEYOR, EARTHWORKS NOTES 1. CLEAR ALL VEGETATION FROM THOSE AREAS TO BE EXCAVATED OR FILLED. ALL RUBBISH INCLUDING DEBRIS FROM CLEARING IS TO BE DISPOSED IN ACCORDANCE WITH THE STANDARDS OF THE LOCAL AUTHORITY. BURNING WILL NOT BE ALLOWED 2. ALL ORGANIC MATERIAL, TOPSOIL, AND UNSUITABLE SUBGRADES ARE TO BE STRIPPED FROM THE AREA TO BE FILLED AND REMOVED FROM THE SITE EXCEPT THAT SUFFICIENT TOPSOIL IS TO BE RETAINED FOR RESPREADING TO A MINIMUM DEPTH OF 100mm ALL OVER THE SITE AFTER FILLING TO LEVEL WITH IMPORTED FILL. AFTER STRIPPING AS ABOVE THE WHOLE SITE IS TO BE COMPACTED AND PROOF ROLLED TO THE SATISFACTION OF THE GEOTECHNICAL CONSULTANT PRIOR TO PLACING OF IMPORTED FILL. 3, FILLING IS TO BE CARRIED OUT IN CONTROLLED LAYERS NOT TO EXCEED 200mm DEPTH BY 2500 m*. EACH LAYER IS TO BE COMPLETELY COMPACTED TO ‘A MINIMUM OF 95% RELATIVE DRY DENSITY FOR COHESIVE SOILS OR A MINIMUM DENSITY INDEX OF 70% FOR NON-COHESIVE SOILS AND TESTED AND APPROVED BY THE GEOTECHNICAL CONSULTANT PRIOR TO THE PLACEMENT OF THE NEXT LAYER. THE TOP 300mm OF THE ROAD SUBGRADE IS TO BE COMPACTED TO A MINIMUM OF 98% RELATIVE DRY DENSITY, 4, THE WHOLE OF THE MATERIAL IN ANY PARTICULAR LAYER SHOULD BE HOMOGENOUS, AND IF NECESSARY SMALL QUANTITIES OF FILL DIFFERING FROM THE REST SHOULD BE SPREAD AS A THIN LAYER OVER THE WHOLE SITE AND INCORPORATED INTO A FULL LAYER. IN A CUT/FILL SITUATION THE GEOTECHNICAL CONSULTANT MAY DIRECT THAT ANY EXISTING SOIL WITHIN 600mm OF THE FINISHED SURFACE LEVEL BE REMOVED AND REPLACED WITH — FILL EQUIVALENT TO THE GENERAL FILL MATERIAL. THE MATERIAL SO REMOVED MAY, IF IT OTHERWISE MEETS THE SPECIFICATION, BE USED AS GENERAL FILL AS ABOVE, 5. IMPORTED FILL IN ALLOTMENTS IS TO CONSIST OF HOMOGENOUS MATERIAL CONTINUOUSLY GRADED WITH A MAXIMUM PARTICLE SIZE OF 100mm, A = MAXIMUM LINEAR SHRINKAGE OF 8%, AND A MOISTURE CONTENT BETWEEN -2% TO +2% OF OPTIMUM MOISTURE CONTENT AT THE TIME OF COMPACTION. IMPORTED FILL IN ROADWAYS IS TO CONSIST OF HOMOGENOUS MATERIAL CONTINUOUSLY GRADED WITH A MAXIMUM PARTICLE SIZE OF 100mm, A MINIMUM CBR OF 8, AND A MOISTURE CONTENT BETWEEN -2% TO +2% OF OPTIMUM MOISTURE CONTENT AT THE TIME OF COMPACTION. 6, THE CONTRACTOR SHALL ENSURE THAT ALL WORK IS CARRIED OUT, TESTED AND CERTIFIED AS CONTROLLED FILL IN COMPLIANCE WITH AS.3798 "GUIDELINE ON EARTHWORKS FOR COMMERCIAL AND RESIDENTIAL DEVELOPMENTS". ALL TESTING AND INSPECTIONS ARE 10 BE CARRIED OUT BY A NATA CERTIFIED LABORATORY APPOINTED BY THE GEOTECHNICAL CONSULTANT IN ACCORDANCE WITH LEVEL ONE TESTING AS SET OUT IN APPENDIX B OF AS.3798, THE CONTRACTOR SHALL PROVIDE CERTIFICATION TO THE ENGINEER ON COMPLETION OF THE EARTHWORKS, 7. ALL "UNCONTROLLED FILL" IDENTIFIED ON SITE TO BE REMOVED TO NATURAL SURFACE LEVEL AND, IF SUITABLE, REUSED AND PLACED AS SPECIFIED ABOVE. ASPHALT TYPE DG10 MINIMUM COMPACTED DEPTH 30mm ON HOT BITUMEN [email protected] 1 /m?, NEW PAVEMENT EXISTING PAVEMENT = 2 300 MIN + SAW CUT EXISTING ASPHALT 5 £ 2| \ 200mm LEAN MIX \ NS i | ~~ 200mm LEAN MIX WS LEAN MIX PAVEMENT COMPACTED IN 200mm LAYERS TO 100% RELATIVE DENSITY COMPACTED SUBGRADE TO 95% RELATIVE DENSITY * EXISTING PAVEMENT TO BE CUT BACK UNTIL FULL DEPTH PAVEMENT EXPOSED, PAVEMENT JOINT DETAIL ROAD WIDENING - DAVID LOW WAY DESIGN DEPTH# DRAWING SCHEDULE 40525-(1 CIVIL WORKS NOTES AND DRAWING SCHEDULE 10525-C2 SITE FRONTAGE WORKS PLAN 40525-(3 FRONTAGE WORKS DETAILS 40525-C4 BULK EARTHWORKS PLAN SHEET 1 10525-(5 BULK EARTHWORKS PLAN SHEET 2 10525-C6 BULK EARTHWORKS DETAILS 40525-C7 Lown] LINENARKING AND SIGNAGE 10525-C8 CROSS SECTIONS AND ROAD LONGITUDINAL SECTION THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH GEOTECHNICAL REPORT No. 007-160A BY BUTLER PARTNERS PTY. LTD. DATED APRIL 2010 é ASPHALT TYPE OGiO MINMUM CONPACTED DEPTH 30mm ON HOT BITUMEN [email protected] /m, PRE-SEAL INSPECTION a 5 | BASE COURSE: UNBOUND PAVEMENT TYPE 2.3. [CBR 45) MIN. COMPACTED THICKNESS: 125mm. MIN, COMPACTION: 100% ROD, 3 5 $5] SUB BASE COURSE: UNBOUND PAVEMENT TYPE 2.3, [CBR 45) MIN. COMPACTED THICKNESS: 125mm. MIN, COMPACTION: 100% ROD). SS "| LOWER SUB BASE COURSE: UNBOUND PAVEMENT TYPE 2.5. (CBR 15) NS SS THICKNESS AS INSTRUCTED. MIN. COMPACTION: 100% ROD. ‘ PROVISIONAL S ” ! : SUBGRADE INSPECTION K c _| NATURAL SUBGRADE MIN, 95% ROD FOR FILL PLACED TO WITHIN 300mm OF LEVEL AND 97% ROD FOR THE TOP 300mm BELOW THE | FNIsHeD suBGRADe LEVEL. 2 23 22 as =2| Roo RELATIVE MAXIMUM DRY DENSITY Es| # MIN. DEPTH TO BE DETERMINED BY THE ENGINEER AFTER TESTING OF THE INSITU SUB-GRADE, af TOPSOIL: TOPSOIL IS TO BE REMOVED, STOCKPILED, AND REUSED TO COVER ALL DISTURBED EARTHWORKS TO A MINIMUM COMPACTED DEPTH OF 75mm. AND GRASSED. NOTE: ALL PAVEMENT WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH SUNSHINE COAST REGIONAL COUNCIL GUIDELINES AND SPECIFICATIONS. PAVEMENT DETAIL ROAD EXTENSION - LANEWAY ——$—— SUNSHINE COA APPRCV opw 1105 5° STREGIONAL COUNCIL | 7 Ee 2 NOV 2012 ae PROJECT DRAWING TITLE ASSOCIATED CONSULTANT TORTGONSULTINLETY ETD sa’ || PROPOSED ACCOMODATION AND CIVIL WORKS NOTES sven py eyes zr, Sheet Neo fod Mewes, Ba r P.O, 61, Noosaville Ql sercre, || COMMERCIAL DEVELOPMENT AND DRAWING TOECENSUEANG le oe Eeere"|| “ESSENCE OF PEREGIAN’ : SCHEDULE ENGINEERS ee eee od ae a esis prysTuPA| "A. VENESS | "*"* MAY 2010 eae DAVID LOW WAY STAGE 1 AND 2 ; wi, wo aa ISSUE bate) STRUCTURAL CIVIL omits ceorce | cray_| "a rere. PEREGIAN BEACH for essence C_ [30.tit0 | OPERATIONAL WORKS ISSUE FAX ITB 9178 Tet nt Bates ou honey B /10.06.10 | OPERATIONAL WORKS ISSUE PHONE (07) 3678 1026 Approved tor 8 D. REYNOLDS AnD ere SCANLON PROPERTY GROUP of peregian beach K 28.05.10] PRELIMINARY ISSUE | 0. REYNOLDS RPEQ 9872 came ab "10525 ing Ne AF TI lasue Date Drawing Record th
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved PlansRelated documentApplication case desk ↗
About this file
- File size
- 15.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.