LANDSCAPE SPECIFICATIONS

1.0 GENERAL NOTES

ABBREVIATIONS

- EP - ESTABLISHMENT PERIOD + LA- LANDSCAPE ARCHITECT
+ N/A- NOT APPLICABLE + O.C,-ON CENTRE

+ SCRC - SUNSHINE COAST REGIONAL COUNCIL

+ SUPER - SUPERINTENDENT

THE FOLLOWING LANDSCAPE OPERATIONAL WORKS PLAN PACKAGE CONSISTS OF THE
FOLLOWING SCHEDULE OF DRAWINGS;

Lo1 GENERAL NOTES

Lp2 DETAILS

LD3 DETAILS, LEGEND, PLANT SCHEDULES

LP1-LP6 LANDSCAPE DRAINAGE & CONCRETE EDGING PLANS
LP7-LP15 PLANTING PLANS

LP16 ‘TREE RETAINED / REMOVAL PLAN

THE LANDSCAPE PLANS MUST BE READ IN CONJUNCTION WITH THE OPERATIONAL WORKS
LANDSCAPING DECISION NOTICE ONCE ISSUED, ARBORIST'S REPORT, REHABILITATION PLAN,
& KOALA HABITAT MANAGEMENT PLAN. THIS PLAN HAS BEEN DEVELOPED TO COMPLY WITH
THE SUNSHINE COAST REGIONAL COUNCIL - THE NOOSA PLAN PLANNING SCHEME.

PRELIMINARIES:

+ BEFORE WORK COMMENCES THE SUBCONTRACTOR IS TO ORGANISE A PRE-START MEETING
WITH THE LA TO ESTABLISH SCOPE OF WORKS MANAGEMENT PROCEDURES & CLARIFY ANY
ISSUES,

+ CALL DIAL BEFORE YOU DIG 11 00 PRIOR TO ANY EXCAVATION.

+ PRIOR TO COMMENCING CONSTRUCTION WORKS, VERIFY DIMENSIONS, LEVELS & LOCATION
OF SITE SERVICES, REFER ENGINEER'S DRAWINGS GENERALLY.

- WHERE ANY DISCREPANCIES OCCUR WITHIN LANDSCAPE DOCUMENTATION REFER TO
LA & SITE SUPER.

SEDIMENT AND EROSION CONTROL,

+ INSTALL SILT CONTROL FENCING IN ACCORDANCE WITH SITE ENVIRONMENTAL
MANAGEMENT PLAN & LOCAL AUTHORITY REGULATIONS.

+ SEDIMENT & EROSION CONTROL DEVICES TO BE INSTALLED WHERE NECESSARY & AS.
DIRECTED ON SITE BY SUPERINTENDENT.

+ ALL SEDIMENT & EROSION CONTROL DEVICES ARE TO BE INSTALLED IN ACCORDANCE
WITH MANUFACTURER'S SPECIFICATIONS.

+ THE CONTRACTOR IS RESPONSIBLE FOR ENSURING SEDIMENT & EROSION CONTROL,
DEVICES ARE INSPECTED & MAINTAINED AS FOLLOWS;

a.) DURING CONSTRUCTION: - DAILY DURING DRY WEATHER,

- PRIOR TO PREDICTED STORM EVENTS

- TWICE DAILY DURING PROLONGED RAIN
b.) DURING ESTABLISHMENT PERIOD: - WEEKLY DURING DRY WEATHER

= PRIOR TO PREDICTED STORM EVENTS,

- TWICE WEEKLY DURING PROLONGED RAIN

- ALL STOCKPILES ARE TO BE PROTECTED WITH SUITABLE EROSION CONTROL DEVICES &
GRADED TO ENSURE CONTROL OF RUNOFF.

+ COORDINATE INSTALLATION OF SEDIMENT & EROSION CONTROL DEVICES WITH CIVIL
CONTRACTOR TO ENSURE COMPATIBILITY & CONSISTENCY IN CONTROL MEASURES,
ALL EXPOSED SURFACES, ONCE COMPLETED SHALL BE IMMEDIATELY STABILISED TO
PREVENT EROSION.

SITEWORKS AND DRAINAGE

+ REMOVE ALL UNWANTED MATERIAL, DELETERIOUS & OPERATIONAL DEBRIS FROM SITE.

+ PLAN DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS.

+ VERIFY ALL DIMENSIONS IN-THE-FIELD.

- WHERE BAD GROUND OCCURS OR LEVELS PROVIDED ARE NOT FUNCTIONAL REFER TO LA.

+ ENSURE SITE DRAINAGE CAN OCCUR TO WHOLE OF SITE & WHERE PATHS, EDGES, &
GARDENS ETC. MAY IMPEDE DRAINAGE, REFER TO SUPERINTENDENT BEFORE CONTINUING
WORKS.

+ ENSURE DRAINAGE WORKS CORRELATE WITH ADJACENT LAND.

+ CIVIL DESIGN HAS PROVIDED A POSITIVELY DRAINED SITE HOWEVER, WHERE DRAINAGE
ISSUES ARE IDENTIFIED REFER SUPER.

+ REFER TO 2.0 LANDSCAPE CONSTRUCTION - DRAINAGE FOR MORE INFORMATION,

» EXCEPT WHERE INDICATED OR SPECIFIED, FINISHED SURFACE LEVELS ARE TO BE FLUSH
WITH ADJACENT SURFACES & GRADED EVENLY ELSEWHERE.

+ ENSURE SMOOTH, FLOWING, EVEN GRADES AND POSITIVE DRAINAGE WITH NO PONDING TO
FALL PERCENTAGES SHOWN ON PLAN, 3% (MINIMUM 2%). FINISHED GRADES SHALL BLEND
INTO EXISTING GRADES PROVIDING A NATURAL APPEARANCE WITH NO ABRUPT EDGES,

TOPSOIL HARVESTING, STOCKPILING, RE-USE & SPREADING

+ CIVIL ENGINEERING EARTHWORK OPERATIONS WILL HAVE HARVESTED & STOCKPILED SITE
TOPSOILS. LANDSCAPE CONTRACTOR TO COORDINATE WITH CIVIL CONTRACTOR TO
ENSURE TOPSOIL IS RE-INSTALLED PER THE FOLLOWING SPECIFICATIONS IN RESPECTIVE
LANDSCAPING AREAS.

+ TOPSOIL STOCKPILING SHALL OCCUR IN AN AREA ADJACENT TO THE STRIPPED AREA(S) OR
AREA BY ENGINEER OR OWNER WHICH WILL NOT HINDER VISIBILITY FOR INSPECTION OF THE
WORK.

+ STOCKPILE CONSTRUCTION TO ENSURE NO PONDING OF WATER & POSITIVE DRAINAGE.

- INSTALL EROSION CONTROL MEASURES PER ENGINEER & ABOVE FOR STOCKPILED
TOPSOIL.

- LANDSCAPE CONTRACTOR TO CONDUCT SOILS ANALYSES TESTS TO STOCKPILED TOPSOILS
& AMELIORATE PER RECOMMENDATIONS PRIOR TO RE-SPREADING. FURNISH LA WITH
RESULTS. LANDSCAPE CONTRACTOR TO ALLOW FOR FOR pH BALANCING & NUTRIENT
AMELIORATIONS. ALL SOIL TESTING TO BE CONDUCTED BY A LAB ACCREDITED BY THE
NATIONAL ASSOCIATION OF TESTING AUTHORITIES OR A LAB WITH RELEVANT

2.0 LANDSCAPE CONSTRUCTION

LEVELS:

- SEE PLAN FOR ENGINEER'S PLAN LEVELS & PROPOSED LEVELS.

+ VERIFY ALL LEVELS, CONDITIONS, & UTILITY LOCATIONS IN-THE-FIELD INCLUDING ALL
INVERTS. IF A DISCREPANCY OCCURS NOTIFY SUPER &/OR LA.

- LEVELS TO BE CONFIRMED BY A QUALIFIED/LICENSED SURVEYOR. SEE PLANS FOR LEVEL
SOURCES.

- GRADE EVENLY BETWEEN PRESCRIBED LEVELS & FINISHED SURFACE LEVELS ENSURING
POSITIVE DRAINAGE & NO PONDING AREAS.

+ CO-ORDINATE ESTABLISHMENT OF LEVELS WITH SUPER.

- ENSURE 2% MINIMUM SLOPE AWAY FROM ALL STRUCTURES TO PITS OR SWALES.

DRAINAGE

- ALL FIELD INLETS & SUBSURFACE DRAINS TO BE CONNECTED TO ENGINEER'S SITE
STORMWATER DRAINAGE SYSTEMS.

+ PROVIDE SUBSURFACE DRAINAGE TO ALL GARDEN BED AREAS PER DETAIL. DRAINAGE TO
BE SOCKED 100mm MIN. AG-FLOW PIPE CENTRED IN 300x300mm
GRAVEL TRENCH SURROUNDED BY LA APPROVED PERMEABLE BIDUM.

- LANDSCAPE FIELD INLETS TO BE 450x450mm PLASTIC SUMPS WITH L.D. GALVANISED
SURFACE GRATE, DETERMINE REQUIREMENTS ON-SITE IN ADDITION TO THOSE ON PLANS.

- ENSURE ALL DAMAGED STORMWATER PIPES ARE REPLACED & RELOCATED AS NECESSARY.

+ STORMWATER DRAINAGE TO BE 100mm MIN. UPVC DRAINAGE PIPE.

+ ENSURE SITE DRAINAGE CAN OCCUR TO WHOLE OF SITE & WHERE PATHS, EDGES, &
GARDENS ETC. MAY IMPEDE DRAINAGE; REFER TO LA BEFORE CONTINUING WORKS,

+ ENSURE DRAINAGE WORKS CORRELATE WITH, & DO NOT DISTURB, ADJACENT LAND.

+ SEE LEGEND FOR PLAN SYMBOLS AND/OR PLANS FOR LOCATIONS.

+ FURNISH & INSTALL 1m? OF 100-200mm@ WASHED, SOUND, ROUNDED MARY RIVER GRAVEL
‘SPALLS OVER PINNED PERMEABLE GEO-FABRIC AT ALL NEW LANDSCAPE DRAINAGE
DAYLIGHT POINTS.

CONCRETE WORKS

+ PATH ALIGNMENTS TO BE PEGGED BY CONTRACTOR & APPROVED BY LA PRIOR TO POURING.

+ INSTALL FEATURE, LIGHT EXPOSED, F72 REINFORCED CONCRETE SLABS GRADE 25 MPA,
WITH FINISHED CONCRETE THICKNESS TO BE 100mm ON COMPACTED SUB-GRADE AS.
SHOWN ON PLANS.

+ PROVIDE CONNOLLY KEY EXPANSION JOINT (EXJ100) OR APPROVED SIMILAR TO.
MANUFACTURER'S RECOMMENDATIONS & CONSTRUCTION JOINTS (TOOL JOINTS) AT THE
FOLLOWING INTERVALS;

PATH WIDTH. EXPANSION JOINT __ CONTROL JOINT
3m 12m 3am

2m 8m 2m

1.5m 6m 1.5m

1.2m 4.8m 1.2m

+ ALL OTHER CONCRETE WORKS INCLUDING PATHWAYS & RAMPS TO BE CONSTRUCTED TO
CURRENT SCRC ROAD/STREET STANDARDS R0065 & R0084 & IN ACCORDANCE WITH ALL
AUSTROADS CONSTRUCTION DETAILS OR GREATER EXTENT AS DESCRIBED HEREIN & ON
PLANS & DETAILS,

EDGING

» MAINTAIN SPADE CUT EDGES PER PLAN & DETAIL.

» SUPPLY & INSTALL 100x100mm CONCRETE GARDEN EDGES AS SPECIFIED & SHOWN ON THE
PLANS & DETAILS, SPECIFICALLY WHERE NEW GARDENS ARE LOCATED ADJACENT TO NEW
TURF AREAS. TIE OFF ENDS PERPENDICULARLY TO PATHS AT KERBS AT CONTROL OR
EXPANSION JOINTS.

+ SUPPLY & INSTALL TIMBER EDGES AS SPECIFIED & SHOWN ON THE PLANS & DETAILS,
INCLUDING WHERE GRAVEL AREAS ARE ADJACENT TO NEW GARDEN AREAS.

» WHERE DRAINAGE IS REQUIRED THE FOLLOWING APPLIES:

- ALLOW FOR SEEPAGE INTERCEPTION SUB-SURFACE DRAINAGE WHERE PATHS &
LANDSCAPE WORKS IMPEDE DRAINAGE. (TO BE COORDINATED ON SITE)

= ALLOW FOR 300mm x 300mm GRAVEL TRENCH WITH SOCKED AG-LINE UNDER PATH,
DISCHARGE TO NATURAL DRAINAGE LINES.

= ALLOW FOR 300mm x 300mm LATERAL COLLECTION TRENCHES EXTENDING NOM. 1m
EITHER SIDE OF LOW POINT.

PLANTING

NEW GARDENS

+ EXCAVATE CIVIL FINISH LEVELS 300mm FOR GARDEN AREAS (UNLESS COMPLETED BY CIVIL
CONTRACTOR).

+ CULTIVATE SUBGRADE SOIL TO A DEPTH OF 150mm.

+ SPREAD A.S.4419 IMPORTED ORGANIC TOPSOIL MIX TO A DEPTH OF 300mm OVER PREPARED
GARDEN AREAS & TRIM.

+ CROWN BEDS AT CENTRE, 100mm.

+ MULCH GARDENS WITH SITE OR LA APPROVED COMPOSTED & FINELY TUB GROUND MULCH
TO A DEPTH OF 100mm UNLESS OTHERWISE NOTED ON PLANS.

+ ALL SUPPLIED TOPSOIL & MULCH TO COMPLY WITH CURRENT A.S. & FREE OF WEEDS, SEEDS
(SPECIFICALLY NUTSEDGE), PESTS INCLUDING FIRE ANTS & SOIL BORNE VIRUSES &
DISEASES. PROVIDE LA WITH CERTIFICATION.

TREE PLANTING

+ REFER TO STREET TREE & TREE PLANTING DETAILS (AS APPLICABLE) FOR INFORMATION.

+ ALL TREES TO BE CERTIFIED THAT THEY COMPLY WITH THIS SPECIFICATION & WITH
'NATSPEC GUIDE SPECIFYING TREES: A GUIDE TO ASSESSMENT OF TREE QUALITY (2003)'
FURNISH LA WITH CERTIFICATION PRIOR TO INSTALLATION.

+ LANDSCAPE CONTRACTOR TO PEG STREET TREE POSITIONS FOR APPROVAL BY SCRC
OFFICER & SUPER BEFORE EXCAVATION.

+ STREET TREES TO HAVE A FULL & EVEN CROWN.

+ INSTALL TREES AT LOCATIONS INDICATED ON THE PLANS, PER NOTES & DETAILS HEREIN.

essence of peregian beach

= MINIMUM 2m FROM STORMWATER CATCH PITS.

- MINIMUM 1500mm HORIZONTALLY & VERTICALLY FROM SEWER LINES.
- MINIMUM OF 6m FROM OVERHEAD STREET LIGHTING.

- MINIMUM OF 900mm FROM BACK OF KERB.

GENERAL PLANTING

- REFER TO DETAIL(S) HEREIN RESPECTIVELY.

+ SUPPLY & PLACE PLANTS ACCORDING TO PLANT SCHEDULE, PLANT SETOUT NOTES & PLAN
LOCATIONS.

- WHERE DISCREPANCIES OCCUR ADVISE SUPER PRIOR TO PLANTING.

- ENSURE PLANTS ARE PLACED & PLANTED AT EQUAL CENTRES, STAGGERED, NOT IN ROWS
UNLESS INDICATED ON PLANS.

+ MASS & GROUP PLANTINGS TO BE SPACED EVENLY IN A TRIANGULAR PATTERN TO ACHIEVE
OPTIMUM COVER RELATED TO MATURE PLANT SIZE AND FORM.

+ SHRUBS & SPREADING GROUNDCOVERS TO BE SET BACK A MINIMUM 500mm FROM ROADS,
KERBS, GARDEN EDGES & PATHS TO ALLOW FOR MATURE PLANT FORM. CONFIRM WITH LA
WHICH REQUIRE MORE DISTANCE.

~ ALL PLANTS MUST BE PLANTED USING ONE AGRIFORM 10g FERTILISER (N.P.K. 20-4.3-4.1)
TABLET AT A RATE OF 1/140mm, 2/200mm, 3/300, 4/45 litre & ABOVE POT SIZES, 5g TABLET FOR
TUBESTOCK. DO NOT USE TABLETS FOR BANKSIAS, GREVILLEAS & HAKEAS.

+ CULTIVATE SUBGRADE TO 150mm.

+ SOAK PLANTS THOROUGHLY BEFORE REMOVING FROM CONTAINER.

+ REMOVE CAREFULLY & INSPECT ROOTBALL, REMOVE OLD MATTED & COILED ROOTS TO
EXPOSE YOUNG ROOTS.

+ DO NOT MIX SOIL FROM HOLE WITH MULCH.

+ ROUGHLY SQUARE HOLE SIDES.

+ FILL HOLE WITH WATER, ALLOW TO DRAIN BEFORE PLANTING.

+ INSTALL FERTILISER TABLET(S).

+ BACKFILL PLANT PIT WITH AS4419 TOPSOIL.

WATER PLANT THOROUGHLY & MAINTAIN APPROPRIATE SOIL MOISTURE LEVELS THROUGH
ESTABLISHMENT. WATER ADDITIONALLY DURING DRY PERIODS DURING ON-MAINTENANCE

BIO-RETENTION AREAS - TUBESTOCK PLANTING

+ REMOVE ALL WEEDS FROM PLANTING AREAS. LEVEL & TRIM PER ENGINEER'S PLANS.

+ PLANTING AREAS TO BE DECOMPACTED & CULTIVATED 150mm DEEP.

+ INSTALL PLANTS PER PLANT SCHEDULE DENSITIES & NOTES & DETAILS.

» INSTALL FERTILISER TABLET(S).
BACKFILL PLANT PIT WITH AS4419 TOPSOIL.

+ WATER PLANT THOROUGHLY & MAINTAIN APPROPRIATE SOIL MOISTURE LEVELS THROUGH
ESTABLISHMENT. WATER ADDITIONALLY DURING DRY PERIODS DURING ON-MAINTENANCE.

+ DO NOT MULCH BIO-RETENTION AREAS SAND FILTER MEDIA.

NEW TURFED AREAS

+ EXCAVATE CIVIL FINISH LEVELS 150mm FOR TURF AREAS (UNLESS COMPLETED BY CIVIL
CONTRACTOR).

+ CULTIVATE SUBGRADE SOIL TO A DEPTH OF 150mm.

+ CIVIL CONTRACTOR TO HARVEST, STOCKPILE & RE-SPREAD SITE TOPSOIL.

+ LANDSCAPE CONTRACTOR TO TEST TOPSOIL TO AUSTRALIAN STANDARDS FOR SOIL
MODIFICATION RECOMMENDATIONS. FURNISH LA WITH RESULTS & CONFIRMATION

+ ALLOWANCES SHALL BE MADE BY LANDSCAPE CONTRACTOR TO ADJUST TOPSOIL FOR pH
BALANCING & NUTRIENT IMPROVEMENTS.

+ TRIM AMELIORATED TOPSOIL, FILL DEPRESSIONS & PROVIDE EVEN FALLS AS INDICATED
ON DRAWINGS.

» FINISHED TURF GRADES/CONTOURS SHALL BE SMOOTH AND UNDULATING, FREE FROM
DELETERIOUS MATERIALS, DEBRIS, LARGE CLODS OF SOIL, STONES, & ORGANIC MATTER,
POSITIVE FLOWING MIN. 2% SLOPES & NO PONDING AREAS, CO-ORDINATE ON-SITE WITH LA &
ENSURE LEVELS ARE APPROVED PRIOR TO LAYING TURF.

+ SUPPLY & LAY ‘A’ GRADE TURF PER PLANS & THE PLANTING SCHEDULE.

+ WATER TURF IN WELL, APPLY WATER TO MAINTAIN SOIL MOISTURE UNTIL ESTABLISHED.

FAUNA FRIENDLY FENCING
+ REFER TO ECOLOGICAL RESTORATION PLANS BY RPS

3.0 MAINTENANCE

+ MAINTAIN WHOLE OF LANDSCAPE WORKS FOR ESTABLISHMENT PERIOD OF TWELVE (12)
WEEKS FROM DATE OF PRACTICAL COMPLETION OF LANDSCAPE WORKS.

+ MAINTAIN WHOLE OF LANDSCAPE WORKS FOR ON-MAINTENANCE PERIOD OF FORTY (40)
WEEKS FROM END OF ESTABLISHMENT PERIOD.

+ WATER - DURING EP PERIOD WATER EVERY SECOND OR THIRD DAY TO MAINTAIN SOIL
MOISTURE OR AS REQUIRED DURING DROUGHT OR EXTREME HEAT PERIODS. WATER ONCE
WEEKLY DURING MAINTENANCE PERIOD. WATER ALL PLANTS,

DURING DROUGHT PERIODS.

+ MOWING - ONCE WEEKLY TO A HEIGHT OF 30mm,

+ TRIMMING - TRIM TURF ADJACENT TO HARD EDGES AS PART OF MOWING PROGRAM.

+ TOP DRESSING - WHEN TURF AREAS HAVE BECOME ESTABLISHED & IMMEDIATELY AFTER
THE FIRST CUT, TOP DRESS LAWN WITH 10mm LAYER OF PIT SAND OR APPROVED SCREENED
TOPSOIL. SCREED TOP DRESSING LAYER INTO LAWN TO GIVE AN EVEN LAYER OVER THE
ENTIRE AREA. ENSURE FALLS & LEVELS ARE EVEN. ADJUST LEVELS WHERE NECESSARY TO
ACHIEVE PREVIOUSLY SPECIFIED FINISH LEVELS.

Operational Works - Landscaping
June 2010

SOURCES:
~ SURVEY - JF& P
TREE SURVEY - PMM
+ CIVIL ENGINEERING - TOD CONSULTING ENGINEERS
- HYDRAULIC ENGINEERING - SIMMONDS & BRISTOW PTY. LTD.
+ ARCHITECTURE - CARL BRUNSKILL
+ ECOLOGICAL RESTORATION-PLAN (INGLUDING-FAUNA FRIENDLY FENCIN(

SUNSHINE COAST REGIONAL COUNCIL
APPROVED |
|

 

    

ae?

Opw 110535

 

LEGEND

 

 

EXISTING TREE TO BE RETAINED
Refer to LP13, General Notes, Details, & data
by others.

Qo

o
m
a
@-)| 3
=

 

 

STAGE BOUNDARY
Refer to Plans

 

 

 

 

oF SHEET ADJOIN LINE
a Refer to Plans
8 LANDSCAPE FIELD INLET (PROPOSED)

Refer to General Notes, Plans & Schedule

 

 

CONCRETE EDGE
Refer to PlanS, General Notes, Detail

 

 

 

STREET TREE PLANTING
Refer to Plans, Detail & Schedule

 

 

TREE PLANTING
Refer to Plans, Detail & Schedule

 

 

PALM TREE
Refer to Plans, Detail & Schedule

 

 

 

SHRUBS
Refer to Plans, Detail & Schedule

 

 

GROUNDCOVERS
Refer to Plans & Schedule

 

 

TURF
Refer to General Notes, Plans & Schedule

 

 

 
  

 

BIO-RETENTION BATTER AREA PLANTINGS
Refer to Plans & Schedule

    
 
        

 

 

BIO-RETENTION MEDIA AREA PLANTINGS
Refer to Plans & Schedule

a

 

PDOOOOOOOD

 

« FAUNA FRIENDLY FENCING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CERTIFICATION. + MULCH TREE GARDENS WITH MIN. 1200mm@ COLLAR WITH 25mm+ HOOP PINE MULCH 100mm. + FERTILISE - AS REQUIRED, INCLUDING STOCK >45L, WHERE PLANTS ARE NOT RESPONDING © a Refer to Ecological Restoration Plan by RPS
+ SHOULD AMENDED SITE TOPSOILS BE INSUFFICIENT IN QUANTITY, CONTRACTOR TO DEEP. DO NOT MULCH WITHIN 50mm OF TRUNK/ PLANT STEM. TO SLOW RELEASE FERTILISER APPLIED AT PLANTING. NOTIFY SUPER IN WRITING IF PLANTS
IMPORT A.S.4419 TOPSOIL & SPREAD TO PROPOSED PLAN FINISH LEVELS. PRIOR TO EDGE STREET TREES PER DETAIL. ARE NOT IN GOOD HEALTH.
SPREADING, IMPORTED TOPSOILS SHALL HAVE SOILS ANALYSES TEST AS PER ABOVE. + INSTALL STREET TREE DRAINAGE PER DETAIL IF REQUIRED BY CIVIL ENGINEER OR TREE * WEEDING - AS REQUIRED TO PREVENT WEED COMPETITION & SEEDING.
IMPORTED SOILS SHALL THEN BE AMENDED PER TEST RESULTS PRIOR TO SPREADING. PITS DO NOT DRAIN. LANDSCAPE CONTRACTOR TO FURNISH RATE PER TREE. * RE-MULCHING - AS REQUIRED TO MAINTAIN CONSISTENT DEPTH.
+ CIVIL WORKS SHALL STRIP TOP 300mm SITE WORKS SOIL FROM GARDEN AREAS & 150mm + INSTALL STREET TREE ROOT BARRIER PER DETAIL IF REQUIRED. LANDSCAPE CONTRACTOR * PRUNING (FORMATIVE) - SHRUBS & VINES <200mm POT INCLUDING STOCK >45L : COMMENCE
FOR TURFED AREAS. TO FURNISH RATE PER TREE. 3 WEEKS AFTER PLANTING, TIP PRUNE TO ENCOURAGE BUSHY HABIT. >200mm POT:
+ CLEAR & REMOVE ALL NON-ORGANIC, DELETERIOUS & LARGE ORGANIC MATTER SUCH AS + TREE STAKING - PER DETAIL. COMMENCE 6 WEEKS AFTER PLANTING. REMOVE ALL DEAD WOOD.
ROCKS GREATER THAN 40mm DIAMETER, TREE ROOTS, TRUNKS, LIMBS, & STUMPS FROM + ALL TREES TO BE LOCATED; + REMOVE ALL STAKING & TIES PRIOR TO ON-MAINTENANCE INSPECTION. PLANTS UNABLE TO
ALL AREAS TO BE LANDSCAPED. - AT LEAST 2m FROM DRIVEWAY CROSSOVERS, BE SULF-SUPPORTING CONSISTENT WITH APPROPRIATE FORM & VIGOUR TO BE PRUNED OR
+ CIVIL CONTRACTOR TO RE-SPREAD STOCKPILED TOPSOIL TO PLAN PRESCRIBED PROPOSED - AT LEAST 600mm FROM CONCRETE PATHS. REMOVED & REPLACED IN LIKE. PLANTS DISPLAYING WEAKNESS OR FAILURE IN ROOT
CONTOURS & TRACK-IN. - MINIMUM OF 1000mm FROM UNDERGROUND SERVICES. LOCATION OF SERVICES TO SYSTEM SHALL BE REPLACED.
BE CONFIRMED ON SITE BY CONTRACTOR BEFORE EXCAVATION COMMENCES. - MONITORING - PROVIDE LIST OF ACTIVITIES COMPLETED AT MONTHLY INTERVALS NOT FOR TENDER OR CONSTRUCTION
INCLUDING STOCK >45L. -
Client Project TS a anembo consultants
Y 7 J Landscape Architects Pre M vent
SEANEON PROPERTY ‘GROUP essence of peregian beach © [esse] __aioanens | 00 | 1 WG, No,LOL environmental os: Management
" anembo consultants pty.td. ABN. 75.089 473 156
This document isthe copytight of anembo consultants & shall 2154-219 David Low way zssssi| _imnesronse | 8 | rH SHEET OF 18 Sunshine Coast: POBox 24 Moffat Beach QLD 4551
xcept ar he development andesite speled. Seale . [ces | oPwores | oa | rH Fh: 07 5437 0000 Fax: 07 5437 0088
chore gneiss Peregian Beach, QLD | cae | aera mse ane Taare laa de | taser GENERAL _NOTES crm tamearembocom ‘aembeom

 

 

Used in these records

About this file

File size
15.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Approved Plans.pdf · 15.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.