Council archive · source document
PR18082_BIK_Settlers Cove Stage 4_RevA_07082018 · OPW18/0155
Attached to the e-mail Additional Information Request Item - OPW18/0155 - Bushfire Information Kit - Condition 29 of MCU16/0143.
Green Tape Solutions
Quality, Integrity, Experience
Responsibility/who to Timing/frequency Action required Performance objectives Reference Notes
contact
• weed species are treated; and be disposed of at an off-site
• combined surface and near surface facility.
forest fuel load of < 10 t/ha.
Body Corporate and Annually prior to the Remove rubbish from No rubbish in the covenant fuel control Section 4.3 Rubbish Rubbish is to be disposed of at
vegetation management start of the covenant area area and covenant area. removal an off-site facility.
contractor September/during fuel
control works
Body Corporate and Annually prior to the Manage weeds in the No proliferation of weed species. Section 4.4 Weed Weed treatment is to be
vegetation management start of covenant area treatment/removal performed in accordance with
contractor September/during fuel the recommended control
control works measures given in Appendix 1.
Body Corporate and Timing/frequency is to Maintain internal and Compliance with AS 1851-2012. Section 4.5 Request the fire services
fire services specialist be in accordance with external fire services Maintenance of fire specialist to provide a
AS 1851-2012 services schedule of maintenance
activities.
Body Corporate and At all times Maintain pedestrian Pedestrian access path is clear of Section 3.6 Wayfinding The evacuation management
on-site manager access path to the fire obstacles. plan must include procedures
hydrant on the edge of for the on-site manager to
the covenant area and Signposting of the path is prominent meet the QFES and direct
signposting to QFES. them to the origin of the
emergency.
Body Corporate Timing/frequency is to Review and maintain Compliance with AS 3745-2010. Section 4.7 The fire services specialist
be in accordance with the evacuation Management systems will provide guidance with
AS 3745-2010 management plan regards the interpretation of
AS 3745-2010.
Body Corporate, on- Annually prior to the Prepare the building Check and/or complete the property Section 4.8 Property The Body Corporate, on-site
site manager and start of September for the fire danger maintenance tasks in Section 3.8. maintenance manager and residents can
residents season access weather updates from
Barbecue gas bottles are not directly the Bureau of Meteorology,
exposed to bushfire hazard in the current information on
covenant area. disaster events from the
Queensland Disaster
Management Services and
PR18082_BIK_Settlers Cove Stage 4 Page 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
PR18082_BIK_Settlers Cove Stage 4_RevA_07082018.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.