Council archive · source document
PR18082_BIK_Settlers Cove Stage 4_RevA_07082018 · OPW18/0155
Attached to the e-mail Additional Information Request Item - OPW18/0155 - Bushfire Information Kit - Condition 29 of MCU16/0143.
Green Tape Solutions
Quality, Integrity, Experience
6. Conclusion
This bushfire information kit provides the Body Corporate with a site-specific plan for managing
the risk associated with the bushfire hazard on the site.
A site assessment determined the likely direction of bushfire attack on the building is from the
north to the west and through the covenant area. However, there was no evidence of recent fire
observed which suggests activities associated with recent development of the area has not
increased bushfire risk.
The bushfire information kit provides site-specific mitigation measures and an implementation
plan which will assist the Body Corporate implement the existing ERP, FMP and BRA and
comply with the Settler’s Cove approval.
PR18082_BIK_Settlers Cove Stage 4 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
PR18082_BIK_Settlers Cove Stage 4_RevA_07082018.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.