Original source · versioned page text
response to information request maple st
8. Clarify extent of earthworks proposed.
An updated earthworks plan is provided as part of the more detailed engineering plans by Recor.
9. Provide a Stormwater Management Plan (SWMP). The SWMP must be prepared
by a suitably qualified person (RPEQ) and satisfy the requirements under The
Noosa Plan 2020 – Water Quality and Drainage Code and PSP6 – Engineering
Design Standards. The SWMP must specifically address:
a. stormwater quality.
b. stormwater quantity.
c. how the proposed Lot 1 achieves a lawful point of discharge – noting that
Council will not sign the plan of survey without an established lawful
point of discharge for Lot 1
A detailed SWMP is provided by Recor demonstrating compliance with the stormwater
management requirements of Noosa Shire Council, QUDM and relevant State Planning Policy
provisions. An easement is also provided on the subdivision plans allowing for proposed Lot 1 to
have a legal point of discharge to Myall St.
Page 5 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (response to information request maple st.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.