Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

response to information request maple st

of 8
       8. Clarify extent of earthworks proposed.

An updated earthworks plan is provided as part of the more detailed engineering plans by Recor.

       9. Provide a Stormwater Management Plan (SWMP). The SWMP must be prepared
          by a suitably qualified person (RPEQ) and satisfy the requirements under The
          Noosa Plan 2020 – Water Quality and Drainage Code and PSP6 – Engineering
          Design Standards. The SWMP must specifically address:
             a. stormwater quality.
             b. stormwater quantity.
             c. how the proposed Lot 1 achieves a lawful point of discharge – noting that
                 Council will not sign the plan of survey without an established lawful
                 point of discharge for Lot 1

A detailed SWMP is provided by Recor demonstrating compliance with the stormwater
management requirements of Noosa Shire Council, QUDM and relevant State Planning Policy
provisions. An easement is also provided on the subdivision plans allowing for proposed Lot 1 to
have a legal point of discharge to Myall St.




                                                                                   Page 5 of 8

Log in to download the original (response to information request maple st.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.