Council’s Reference: MCU20/0149
Our Reference:       02654 L02 NG
Our Contact:         Nadine Gorton




11th March 2021



Chief Executive Officer
Noosa Council
PO Box 141
TEWANTIN QLD 4565


Attention: Planning Assessment


Dear Sir/Madam,

RESPONSE TO INFORMATION REQUST
DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF USE FOR SHORT TERM
ACCOMMODATION OVER PREMISES LOCATED AT 29 FERGUSON STREET, SUNSHINE BEACH
AND DESCRIBED AS LOT 283 ON RP48111

I refer to the above application and the information request issued by your Council and dated 6th January
2021. This request listed 8 items that Council considers is necessary in order to complete its assessment of
the above application.

The applicant provides the following response:

Item 1: Provide details on the proposed rental arrangement, noting the proposed carparking
arrangement is not appropriately designed for rooms being let out individually.

Applicant’s Response to Item 1: The proposed dwelling will provide short term accommodation as one
whole building. The applicant has never had any intention of renting out rooms on an individual basis and does
not propose such an arrangement.


Item 2: Provide a Site Cover Calculation Plan, in accordance with the definition for site cover under
Noosa Plan 2020.

Applicant’s Response to Item 2: Amended plans are included in Attachment A detailing site cover
calculations. Please note that a pavilion style of building is proposed which provides a secluded setting
for guests amongst tropical landscaping.


Item 3: Provide evidence the design and siting of the outdoor living areas will not adversely impact on
the adjoining property to the west, including distances from habitable rooms and proposed noise
mitigation measures.

Applicant’s Response to Item 3: Please refer to Attachment A which provides amended plans detailing:

        Removal of day bed along western boundary
        Removal of media room and conversion of deck area to living room
        Solid wall and louvres along western wall of living room
        Relocation of pool equipment and air- conditioning plant to basement
        Solid screen wall to western end of pool
        Outdoor bath removed
Log in to download the original file

Response to IR.pdf · 460 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 2 pages

Page 2

 Page 2

The adjoining property to the west includes an existing two storey duplex which has kitchen and living areas
located at ground level and two bedrooms on the upper floor as detailed in Figure 1 below. The areas of the
proposed dwelling that may have impact on the adjoining duplex unit relate to the living room and pool located
along the western boundary as detailed in Figure 2. Whilst the kitchen has no windows or openings to the side
boundary, the living room and upper level bedrooms have windows along this façade.

In response to Councils information request, the applicant has modified the design and converted the rear
deck into a living room that is enclosed with a solid wall and louvres to minimise noise impacts. The design of
the building and site incorporates landscaping, fencing and eaves to mitigate noise to adjoining premises.

It is noted that the dwelling is single storied, proposes only three bedrooms and has been purpose designed
to provide a luxury private holiday experience. All service areas and carparking are located underneath the
dwelling to minimise noise impacts and the overall scale of the dwelling is considerably smaller than existing
development in the locality.




Figure 1 – Plan of adjoining unit located along   Figure 2 - Plan of proposed dwelling and adjoining buildings
western boundary. (Source: Real Estate.com)



Item 4:            Provide updated plans with appropriately located mechanical plant.

Applicant’s Response to Item 4: The amended plans detail all mechanical plant as being located in the
basement.


Item 5: Provide additional detail on the proposed access driveway. The detail must be prepared by a
suitably qualified person (RPEQ) and make reference to AS/NZS2890.1:2004 and include but not be
limited to:
       5.1. A longitudinal section extending from the centre of the road formation in Ferguson Street to
       the basement level.
       5.2. Sufficient detail to demonstrate that vehicles will not scrap or bottom out on the driveway or
       the road formation when entering and exiting the site
       5.3. The proposed headroom distance between the driveway and the overhanging structures
       5.4. The existing buried services in the road reserve.

Page 3

 Page 3

       Please note that Council does not support retaining walls in the road reserve and is unlikely to
       support excessive excavation in the road reserve

Applicant’s Response to Item 5: Please refer to Attachment B which provides engineering details
prepared by SCG Consulting Engineers.


Item 6: Provide a plan of the vehicle swept paths required for vehicles to enter the basement carspaces,
manoeuvre and exit the site. The paths must be for a B99 vehicle as described in AS/NZS2890.1:2004
and assume the other spaces are occupied.

Applicant’s Response to Item 6: Please refer to Attachment B which provides engineering details
prepared by SCG Consulting Engineers.


Item 7: Provide a preliminary stormwater management plan for the proposed development. The plan
must not include pump systems and cater for existing overland flowpaths.

Applicant’s Response to Item 7: Please refer to Attachment B which provides a preliminary stormwater
management plan for the development.


Item 8: Provide a site specific geotechnical investigation and report of the subject site. The report must
assess current soil types and include recommendations for the construction of the proposed
development and any measures necessary to protect the adjoining properties.

Applicant’s Response to Item 8: Please refer to Attachment C which provides a soil and footings report
prepared by SCG Consulting Engineers.


The applicant considers that they have now responded to Council’s information request. Could you please
provide us with a list of adjoining owners so we can commence public notification of the application.

Please contact our Sunshine Coast office if you require any further information and/or clarification.


Yours faithfully,




Nadine Gorton
Senior Planner
martoo consulting pty. ltd

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.