:          INTEGRATED PLANNING ACT 1997                                                                      IDAS Assessment Checklist, Version 20, 2 April 2007
           ‘Integration of land use and public = { 22. The application involves: (tick the applicable box/es)—
           ZS refer to Guide 23, schedule               (2) (i) a material change of use assessable against the planning scheme for a purpose
            8A of the IPA, & schedule 2 of the IP Regulation,  mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
            Unless you answered “none of the above’, the       schedule.
            application triggers referral to QT as a
            concurrence agency.                         C1 (ii) reconfiguring a lot—
           |                                                     (J (a)   on land that is comptetely or partly within a public transport corridor, and the
                                                                          total number of lots increases;
                                                                 (J (b)   on land that is completely or partly within a future public transport corridor or
                                                                          an airport's public safety area;
                                                                 [J {c)   on land that is within 400m of a public passenger transport facility or a future
                                                                          public passenger transport facility, and the total site area is 5000m? or greater;
                                                             *   (1)      fora residential purpose within the 25 ANEF contour for an airport;
                                                                 LJ (e)   for a residentiat purpose resulting in 100 or more allotments.
                                                         [1 (iii) operational work assessable against the planning scheme, but not associated with a
                                                               material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
                                                               above, on land that
                                                                 C1 (a)   is completely or partly within a public transport corridor or a future public
           i                                                              transport corridor;
                                                                 (7) (b)  will result in work that encroaches into an airport's operational airspace.
  ©                                                     Bi (v)none ofthe above,
           | Railway safety and efficiency         23.  The application involves: (tick the appficable box/es)—
            For more information refer to Guide 23, schedule C1 (i) a material change of use assessable  against the planning scheme for a purpose
           |   ne      re                                   ° mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
              Intess you answered ‘none of the above’, the
           1 application triggers referral to QT as a          schedule.
           ‘ concurrence agency.                        C1) (ii) reconfiguring a lot—
                                                                 (J (a)   onland that is completely or partly within a future public transport corridor,
           i                                                              future railway tand or a railway tunnel easement;
           '                                                     [-]{b)   on tand that is within 400m of a Citytrain passenger raitway station or a future
                                                                          Citytrain passenger railway station, and the total site area is 5000m? or
                                                                          greater,
            '                                                    (J {c)   on land that abuts rail corridor tand, commercial corridor land or future railway
                                                                          land, and the total number of lots increases;
            '                                                    (J (4)   on land that abuts rail corridor fand, commercial corridor land or future railway
                                                                          land and an easement abutting the corridor or future railway land is created:
                                                                 (J (e)   on land that is completely or partly within 100m of, and abutting an approach
                                                                          to, a railway level crossing, and the total number of lots increases;
           :                                                     (1 (f)   for aresidential purpose resulting in 100 or more allotments.
                                                         1) (iii) operational work assessable against the planning scheme, but not associated with a
@           :                                                   material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
                                                                above, involving extracting, excavating or filling greater than 50m3, on land that—
                                                                  J (a)    is completely or partly within rail corridor land or commercial corridor land, and
                                                                          the work is not for rail transport infrastructure or other rail infrastructure;
            |                                                    (1 (b)    is completely or partly within future railway land, or a railway tunnel easement;
                                                                 [J (c)    abuts rail corridor land, commercial corridor land or future railway land, and
            :                                                             the work is within 25m of the railway boundary.
            :                                               (iv) none of the above.
             Moonie to Brisbane pipeline           24.  The application involves the easement for the construction or operation of the Moonie to
             For more information refer to schedule 2of the IP Brisbane strategic pipeline, and involves: (tick the eppiicable box/es)—
              ones answered “none of the above" the     (J (i) a material change of use assessable against the planning scheme and not associated
             applcaton triggers referral to the holder of       with reconfiguring a lot, and any structure or work will be located wholly or partly in the
             pipeline ficence No 1 issued under the Petroleum   easement.
           Act 193, currently Santos QNT Pty.Ltd, for    oO (ii) reconfiguring a fot
            !                                           C (iti) operational work assessable against the planning scheme, that is filling, excavation,
            f                                                   compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
                                                                work is located wholly or partly in the easement.
                                                        Ril (iv) none ofthe above,

                                                                                     Page 8

Used in these records

About this file

File size
3.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015205E.001.pdf · 3.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.