: INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
‘Integration of land use and public = { 22. The application involves: (tick the applicable box/es)—
ZS refer to Guide 23, schedule (2) (i) a material change of use assessable against the planning scheme for a purpose
8A of the IPA, & schedule 2 of the IP Regulation, mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
Unless you answered “none of the above’, the schedule.
application triggers referral to QT as a
concurrence agency. C1 (ii) reconfiguring a lot—
| (J (a) on land that is comptetely or partly within a public transport corridor, and the
total number of lots increases;
(J (b) on land that is completely or partly within a future public transport corridor or
an airport's public safety area;
[J {c) on land that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;
* (1) fora residential purpose within the 25 ANEF contour for an airport;
LJ (e) for a residentiat purpose resulting in 100 or more allotments.
[1 (iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that
C1 (a) is completely or partly within a public transport corridor or a future public
i transport corridor;
(7) (b) will result in work that encroaches into an airport's operational airspace.
© Bi (v)none ofthe above,
| Railway safety and efficiency 23. The application involves: (tick the appficable box/es)—
For more information refer to Guide 23, schedule C1 (i) a material change of use assessable against the planning scheme for a purpose
| ne re ° mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
Intess you answered ‘none of the above’, the
1 application triggers referral to QT as a schedule.
‘ concurrence agency. C1) (ii) reconfiguring a lot—
(J (a) onland that is completely or partly within a future public transport corridor,
i future railway tand or a railway tunnel easement;
' [-]{b) on tand that is within 400m of a Citytrain passenger raitway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater,
' (J {c) on land that abuts rail corridor tand, commercial corridor land or future railway
land, and the total number of lots increases;
' (J (4) on land that abuts rail corridor fand, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created:
(J (e) on land that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
: (1 (f) for aresidential purpose resulting in 100 or more allotments.
1) (iii) operational work assessable against the planning scheme, but not associated with a
@ : material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m3, on land that—
J (a) is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
| (1 (b) is completely or partly within future railway land, or a railway tunnel easement;
[J (c) abuts rail corridor land, commercial corridor land or future railway land, and
: the work is within 25m of the railway boundary.
: (iv) none of the above.
Moonie to Brisbane pipeline 24. The application involves the easement for the construction or operation of the Moonie to
For more information refer to schedule 2of the IP Brisbane strategic pipeline, and involves: (tick the eppiicable box/es)—
ones answered “none of the above" the (J (i) a material change of use assessable against the planning scheme and not associated
applcaton triggers referral to the holder of with reconfiguring a lot, and any structure or work will be located wholly or partly in the
pipeline ficence No 1 issued under the Petroleum easement.
Act 193, currently Santos QNT Pty.Ltd, for oO (ii) reconfiguring a fot
! C (iti) operational work assessable against the planning scheme, that is filling, excavation,
f compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.
Ril (iv) none ofthe above,
Page 8See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015205E.001.pdfRelated documentPublic source context ↗
07/1026 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.