Council archive · source document
0015205E.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
-INTEGRATED PLANNING ACT 1997 (DAS Assessment Checklist, Version 18.0, 10 November 2006
Electricity infrastructure 18. The application involves: (tick the appfcable bowes)
Phin lnformaton refer to echadhte of tre IP [3 reconfiguring a fot where any part of the lot is —
Unless you enswered “none of fhe shove" O18, * subject to an easement in favour of a distribution entity or transmission entity under the
the anpicatin tigger reteralioheanemoe to Electricity Act 1994 and the easement is for a transmission grid or supply network under
Stik the casement is oranted in favour of as & that Act; or .
rooney. situated within 100m of a substation site;
(Cf) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if -
any part of the premises is subject to an easement in favour of a distribution entity or
° transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and
* any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;
[) (ii) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site;
, (C1 (iv) operational work that is filing or excavation assessable against the planning scheme,
not associated with reconfiguring a lot, if —
¢ any part of the premises is subject to an easement in favour of a distribution entity or
. transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;
© « the work is located wholly or partly within 10m of a substation site;
§} (v)_ none of the above. ;
Land designated for community 19. Does the application involve development assessable against the planning scheme and on land
infrastructure designated for community infrastructure?
designated tr coment fecrctie may tigger {)_ intended to be supplied by a public sector entity; and
neni verter ette (i) on land not owned by or on behalf of the State; and
=< ee (ii) other than development -
wrrates sesccatent by he cists tne othe {a} for the designated purpose; or . - .
geontment adyvstering the Act authorising the (b) carvied cut by, 97 op Jaane ignator.
development for the designated purpose. 1 Bet Me
an agency other than the designator és the | PE RD kA 8
assessment manager for the apptiction, the ‘a ‘ 5 a YA Wh, Wed
designating agency wil be a concurrence epency for ey
the application in relztion to this matter. ;
Page 6See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015205E.001.pdfRelated documentPublic source context ↗
07/1026 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.