DEVELOPMENT ASSESSMENT DELEGATED REPORT
Author Senior Development Planner, Tara Norley
Development Assessment
APPLICATION DETAILS
Application No. MCU24/0001 & OPW24/0003
Applicant 2 Jan Street P/L
Proposal • Material Change of Use - Dual occupancy
• Operational Works (Earthworks, Stormwater, Landscaping &
Crossover)
Properly Made Date 19 December 2023
Information Request Date 24 January 2024
Information Response Date 29 February 2024
Decision Due Date 9 April 2024
PROPERTY DETAILS
Property Address 2 Jan St Noosa Heads
RP Description Lot 15 RP 90014
Land Area 640m²
Existing Use of Land Dwelling House
STATUTORY DETAILS
SEQRP Designation Urban Footprint
Zone Medium Density Residential
Precinct Not Applicable
Local Plan Area Noosa Heads Local Plan Area
Overlays Bushfire Hazard
• Potential Impact Buffer
Assessment Type Code
1. PROPOSAL
This application seeks approval to develop a dual occupancy at 2 Jan Street, Noosa Heads,
including the associated operational works. The proposed dual occupancy is 2 storeys and
includes living areas and a double garage for each unit on the lower floor with 3 bedrooms and
Document Set ID: 22769918
Version: 5, Version Date: 10/04/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 21 pages
Page 2
bathrooms for each unit on the upper floor. Access is proposed to Unit A from Banksia Avenue
with access to Unit B from Jan Street.
The locality and proposal plans are included below.
Page 2 of 22
Document Set ID: 22769918
Version: 5, Version Date: 10/04/2024
Page 3
Figure 1 – Locality
Figure 2 – Site Plan
Figure 3 – Floor Plans
Page 3 of 22
Document Set ID: 22769918
Version: 5, Version Date: 10/04/2024
Page 4
hight
Figure 4 – Elevations
Page 4 of 22
Document Set ID: 22769918
Version: 5, Version Date: 10/04/2024
Page 5
lw Page 5 of 22 Document Set ID: 22769918 Version: 5, Version Date: 10/04/2024
Page 6
Page 6 of 22 Document Set ID: 22769918 Version: 5, Version Date: 10/04/2024
Page 7
2. SITE DETAILS
2.1. Site Description
The site is a corner lot, having frontage to Jan Street and Banksia Avenue. It is rectangular in
shape with a truncated corner, is generally flat and has approximately a 36m frontage to Jan Street
and 12m frontage to Banksia Avenue. There is a single storey dwelling built on the site, which is
to be removed to accommodate the proposed dual occupancy. There are some large mature trees
located to the Jan Street frontage and to the corner of Jan Street and Banksia Avenue, with the
Jan Street trees proposed to be removed to accommodate the pools.
There is kerb and channel to both frontages but no footpath.
Figure 5 – Site Survey
2.2. Surrounding Land Uses
The site is surrounded by a mix of medium and low density residential land uses including both
large detached houses and dual occupancies and multi-unit residential developments. The site
Page 7 of 22
Document Set ID: 22769918
Version: 5, Version Date: 10/04/2024
Page 8
adjoins a vacant lot to the south and a 2 storey multiple dwelling of 4 units to the east. The site is
located within proximity to Noosa Junction.
3. ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following
statutory planning instruments to the extent they are relevant to the development:
• State Planning Policy;
• South East Queensland Regional Plan 2017;
• Planning Regulation 2017; and
• Noosa Plan 2020.
3.2. Noosa Plan 2020
The subject site is located in Noosa Heads and is zoned Medium Density Residential. The
proposed use is identified as a consistent use within the zone and is required to follow a code
assessable application process.
The following codes from the Noosa Plan 2020 are applicable to this development:
• Medium Density Residential Zone Code;
• Noosa Heads Local Plan Code;
• Dual Occupancy & Multiple Dwelling Code;
• Works Codes;
• Bushfire Hazard Overlay Code
The application has been assessed against the above codes and the pertinent matters arising out
of the assessment are outlined and discussed below:
Criteria Planning Scheme Proposal Complies
Building height
• storeys 2 storeys max 2 storeys
• metres 8 metres 8 metres
Site cover 40% max 39.62 %
Plot ratio 0.4:1 max. 0.4:1
Boundary setbacks
• Frontage (Jan) 6 metres min 4m (pergola) X
6m (building)
• Frontage (Banksia) 6 metres min 6m
• Side (south) 1.5/2.0/2.5 metres min 1.03m – 1.5m X
• Side (east) 1.5/2.0/2.5 metres min 1.5m – 4.5m
Length of wall 15 metres max 19.8m X
Roof Form
• Rooftop Terrace No rooftop terrace No rooftop terrace
• Parapet Parapet Wall less than 50% No parapet
Page 8 of 22
Document Set ID: 22769918
Version: 5, Version Date: 10/04/2024
Page 9
Landscaped open space 40% of site 59.4%
Soft landscaping 60% soft landscaping 60%
Landscaping Setbacks 6m (pools within 2m) 0.7m to pool X
Private Open Space 25m² min 25m² plus
Carparking 2 covered min plus 4 covered
1 additional space
Front & Side Setbacks
Acceptable Outcome AO12.1 of the Medium Density Residential Zone Code states:
AO12.1 Buildings and structures meet the following minimum boundary setbacks:
a. for frontages — 6 metres
b. for side boundaries—
i. 1.5 metres setback up to 4.5 metres height;
ii. 2 metres setback between 4.5 metres and 7.5 metres height; and
iii. 2.5 metres where above 7.5 metres height
c. for the rear boundary - 6 metres
AO12.2 The front 6 metres of the property is landscaped open space, provided that uncovered
visitor parking, or swimming pools protruding no more than 1 metre above the ground
level, can be as close as 2 metres from the front boundary.
The applicant is proposing:
• a 4m setback (in lieu of 6m) to the pergolas on the Jan St frontage, with the building otherwise
setback 5.7m to the eave and 6.15m to the building;
• built to boundary gatehouses on both the Jan St and Banksia St frontages;
• a 0.7m setback (in lieu of 2m) to the pools along the Jan St frontage;
• a 1.03m setback (in lieu of 1.5m) to the roof overhang to the garage to the southern side
boundary, but otherwise setback 1.5m to the wall
• a 1.5m setback (in lieu of 2m) to the upper floor is also setback 1.5m to the southern side
boundary, but otherwise setback 2m to the wall.
and as such does not comply with AO12.1 of the Medium Density Residential Zone Code. The
proposal is therefore required to comply with corresponding Performance Outcome PO12 of the
Medium Density Residential Zone Code, which states:
PO12 Buildings and structures are designed and sited to:
a. provide a high level of amenity to users of the subject site and adjoining premises,
including provision of visual and acoustic privacy;
b. not unreasonably obstruct views or cause overlooking of private open space or
habitable areas of adjoining premises;
c. provide adequate distance from adjoining land uses;
d. preserve existing vegetation that will help buffer development;
e. allow for space and landscaping to be provided between buildings including
adequate area at ground level for landscaping with trees, shrubs, outdoor living and
utilities;
f. be consistent with the predominant character of the surrounding area; and
Page 9 of 22
Document Set ID: 22769918
Version: 5, Version Date: 10/04/2024
Page 10
g. protect the natural character and avoid adverse impacts on ecologically important
areas such as national parks, waterways and wetlands.
The proposed reduced setbacks are somewhat necessitated by the site’s corner location and
narrower width of 16m, with the proposed pergola and minor intrusion into the Jan Street frontage
raising no concerns in terms of the streetscape, with the multiple dwelling to the east also located
in the 6m front setback. Further, while gatehouses are not common in the area, the proposed
gatehouses are minor structures and have been designed to comply with the QDC requirement of
a maximum area of 4m2, not more than 2m wide to the street and not more than 3m high.
The proposed pools, while setback 0.7m instead of 2m, still allow for space for landscaping to the
Jan Street frontage, providing the fence is stepped back for the remainder of the frontage. Again,
the proposed reduced setbacks are somewhat necessitated by the site’s corner location and
narrower width of 16m, with the private open space of the dwellings required to be located within
the frontage of the site. A plan amendment is included in the recommendation requiring the
remainder of the fence along the Jan St frontage (including the truncated section) to be stepped
back in accordance with the fencing conditions, with landscaping provided in front of the fencing
where required.
In terms of the southern side setback the proposed reduced setbacks are limited to the eaves of
the ground and upper floors only with the façade otherwise setback in accordance with acceptable
outcome AO12.1.
Streetscape – Length of Wall
Acceptable Outcome AO14.3 of the Medium Density Residential Zone Code states:
AO14.3
Buildings and structures are designed to:
a) have a maximum wall length of 15 metres and external walls incorporate at least one
design element to add visual interest and amenity;
b) allow for landscape treatments to soften the development;
c) avoid more than six dwellings attached in any one plane; and
d) have no more than four dwellings are attached along a street frontage.
The applicant is proposing a 19.8 long unarticulated wall 8m facing the southern side boundary for
the ground and upper floors and as such does not comply with AO14.3 of the Medium Density
Page 10 of 22
Document Set ID: 22769918
Version: 5, Version Date: 10/04/2024
Page 11
Residential Zone Code. The proposal is therefore required to comply with corresponding
Performance Outcome PO14 of the Medium Density Residential Zone Code, which states:
PO14
Development:
a) contributes positively to the locality;
b) addresses and enhances the streetscape by incorporating articulation and individual
design elements that add visual interest to the development;
c) has a form and architectural scale that does not dominate the streetscape or the
surrounding properties;
d) does not detract from the visual amenity of adjoining properties through the impact on
views, access to sunlight or overlooking;
e) takes the form of small separate buildings, rather than large single bulky development;
and
f) sits within a landscaped setting.
The proposal includes a long unarticulated wall of 19.8m facing the southern side boundary for the
ground and upper floors. This wall includes some design elements, including windows and doors
which assist to break the wall up somewhat, with the building otherwise well articulated through a
changing roof form, variation in materials, inclusion of recessed alfresco areas and stepping of the
garage/laundry area.
Overall, the proposal is consistent with the applicable codes of the Noosa Plan 2020 and will
contribute to a range of dwelling sizes and styles for permanent residents. The proposed building
is of a scale and height compatible with development on adjoining and surrounding land, with the
roof form reasonably articulated and a mix of lightweight and textured external building materials
and colours proposed. Some individual design elements are proposed by the applicant to highlight
the 2 dwellings including a change of colours for upper level balcony balustrades and alteration of
the upper level void area window treatments.
4. CONSULTATION
4.1. Referral Agencies
Not Applicable
4.2. Internal Council Referrals
The application was forwarded to the following internal Council officers for review and/or comment:
• Development Engineer, Development Assessment
• Senior Environment Officer, Development Assessment
5. CONCLUSION & REASONS FOR DECISION
The proposed development generally complies with the requirements of the planning scheme and
does not raise any significant issues that cannot be addressed by reasonable and relevant
conditions. The application is therefore recommended for approval.
The report is provided in accordance with Section 63(5) of the Planning Act 2016.
RECOMMENDATION
With regard to Application No MCU24/0001 & OPW24/0003 for a Material Change of Use – Dual
occupancy and Operational Works – Earthworks, Stormwater, Landscaping, Crossover situated at
2 Jan St, Noosa Heads and associated operational works described as Lot 15 RP 90014, it is
recommended the application be approved in accordance with the following details for the Decision
Notice:
Page 11 of 22
Document Set ID: 22769918
Version: 5, Version Date: 10/04/2024
Page 12
1. APPLICATION DETAILS
Application No: MCU24/0001 & OPW24/0003
Street address: 2 Jan St Noosa Heads
Real property description: Lot 15 RP 90014
Planning Scheme: Noosa Plan 2020 (25 September 2020)
2. DECISION DETAILS
Council decided to issue the following type of approval:
• Development Permit for Material Change of Use - Dual occupancy
• Operational Works – Earthworks, Stormwater, Landscaping, Crossover
3. CURRENCY PERIOD OF APPROVAL
The currency period for this development approval is stated in the conditions below.
4. ASSESSMENT MANAGER CONDITIONS
MCU24/0001- DEVELOPMENT PERMIT FOR A MATERIAL CHANGE OF USE –
DUAL OCCUPANCY
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
the use commencing, and then compliance maintained at all times while the use continues.
Currency Period
2. This development approval lapses if the use has not happened by 9 April 2030, unless an
application to extend the currency period is approved by Council.
Approved Plans
3. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the tables below. The plans must be amended to incorporate
the amendments listed within the table below and resubmitted to Council prior to the issue
of any Development Permit for Building Works*
Plan No. Rev. Plan/Document Name Date
23-007 No.02 8 Site Plan prepared by QLD Built 21/02/224
23-007 No. 03 8 Ground Floor Plan prepared by QLD Built 21/02/2024
Annotated by Council
23-007 No. 05 8 First Floor Plan prepared by QLD Built 21/02/2024
23-007 No. 07 8 North & West Elevations prepared by QLD Built 21/02/2024
23-007 No. 08 8 South & East Elevations prepared by QLD Built 21/02/2024
23-007 No. 09 8 Sections 1 and 2 prepared by QLD Built 21/02/2024
23-007 No. 10 8 Sections 3 & 4 prepared by QLD Built 21/02/2024
Page 12 of 22
Document Set ID: 22769918
Version: 5, Version Date: 10/04/2024
Page 13
23-007 No. 26 8 Landscape Plan prepared by QLD Built 21/02/2024
Annotated by Council
Nature and Extent of Approved Use
4. The void areas shown on the Approved Plans must remain as void areas.
5. The area adjacent to each laundry must remain open to the garage as shown on the
Approved Plans and be available for the storage of bikes, motorcycles and the like.
Building Height
6. The maximum height of the development must not exceed 8 metres above the ground level.
7. Certification must be submitted to Council from a Registered Cadastral Surveyor (Qld) which
certifies that the building does not exceed the maximum height requirement of this Decision
Notice.
Performance Bond
8. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must
be submitted to Council, to secure performance of all conditions of this approval, prior to the
issue of a Development Permit for Building Works or prior to a pre-start meeting. The cash
bond or trading bank guarantee will be returned on performance of the conditions of approval
less any costs incurred by Council in respect of enforcing performance of this permit. Council
reserves the right to call upon the bond or guaranteed sum to effect compliance with
conditions.
Building Appearance
9. External design features, materials and finishes must be as shown on the Approved Plans,
with no inclusions or alterations made without approval in writing by Council.
10. External finishes of the building must be a mix of lightweight and textured external finishes,
with masonry areas incorporating a variety of textured finishes to break up the surface.
11. All deck and balcony areas must not be enclosed with shutters, louvres, glass panelling or
the like thus remaining as open structures.
12. All balustrades to decks and balcony areas must be open or transparent.
13. External colours and finishes must be of an understated colour scheme and low-reflective
roofing and cladding materials.
14. All air conditioning units or other mechanical equipment must be fully enclosed or screened
such that they are not visible from the street frontages nor adjoining properties.
15. Waste storage areas, clothes drying areas and external storage areas must be screened
from view of the street.
Fencing and Walls
16. Any street fencing must not exceed 1.8 metres in height, be set back an average of 1 metre
and articulated to provide visual interest by stepping the design. Any fencing on the front
boundary must either:
a. not exceed a maximum height of 1.2 metres
b. be of open construction.
17. The area of land between the fence and the front property boundary must be densely
landscaped to screen any fencing from the street.
Page 13 of 22
Document Set ID: 22769918
Version: 5, Version Date: 10/04/2024
Page 14
Landscaping Works
18. The development site must be landscaped in accordance with the PSP2 – Landscaping. The
works must be undertaken in accordance with Operational Works approval OPW24/0003
and Noosa Plan for that specific area and must include in particular:
a. the works generally shown on the Approved Plans except where varied by the
conditions of this approval.
19. All landscape works must be established and maintained in accordance with the approved
design for the life of the development, and in a manner that ensures healthy, sustained and
vigorous plant growth. All plant material must be allowed to grow to full form and be
refurbished when its life expectancy is reached.
Waste Management
20. A waste storage area must be provided in accordance with Planning Scheme Policy 9, Waste
Management and the Noosa Plan’s Waste Management Code, including an external
imperviously paved area correctly sized for all refuse and recycling containers and suitably
screened from public places and neighbouring properties.
Community Management Statement
21. Any proposed Community Management Statement required for the development pursuant to
the Body Corporate and Community Management Act 1997 must be submitted to Council for
endorsement at the same time as submission of the Building Format Plan (or similar) to
Council for compliance assessment.
22. All clauses and by-laws of the proposed Community Management Statement must accord
with the requirements of this Decision Notice and, in particular, must include the following
additional clauses:
a. The dwelling units are not permitted to be used for short term accommodation, unless
where identified as accepted development by the Noosa Plan or where there is a
Development Permit for Material Change of Use for Short Term Accommodation in
effect. Short term accommodation means the use of the premises for providing
accommodation of less than 3 consecutive months to tourists or travellers.
ENGINEERING
Site Access and Driveways
23. A sealed access driveway must be provided from Jan Street and Banksia Avenue to all
parking and manoeuvring areas of the development. The works must be undertaken
generally in accordance with the conditions of this approval and be generally in accordance
with ARCOS’ Development Site Plan (OPW-C-301, Rev. A) dated 18 December 2023.
Car Parking
24. A minimum of 3 car parking spaces must be provided on the site. The works must include a
minimum of 2 covered spaces.
Stormwater Drainage
25. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken generally in accordance with the conditions of
this approval, be generally in accordance with ARCOS’ Development Site Plan (OPW-C-301,
Rev. A) dated 18 December 2023, and must include in particular:
a. 3,000L of on-site rainwater retention per tenancy for reuse purposes.
Services
26. Underground reticulated electricity and telecommunication services must be provided to
each lot in accordance with the standards and requirements of the relevant service provider.
Page 14 of 22
Document Set ID: 22769918
Version: 5, Version Date: 10/04/2024
Page 15
27. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
28. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
29. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
30. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
31. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
32. All earthworks and associated retaining structures/batters, both above and below ground,
both temporary and permanent, must be undertaken generally in accordance with the
conditions of this approval, be generally in accordance with ARCOS’ Earthworks Plan (OPW-
C-201, Rev. A) dated 18 December 2023, and be contained entirely within the subject site
unless written permission from the respective landowner(s) is provided to Council.
33. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
safety fence.
OPW24/0003 – DEVELOPMENT PERMIT FOR OPERATIONAL WORKS
(EARTHWORKS, STORMWATER, LANDSCAPING & CROSSOVER)
APPROVED PLANS
34. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
OPW-C-201 A Earthworks Plan prepared by ARCOS 18.12.2023
OPW-C-301 A Development Site Plan prepared by ARCOS 18.12.2023
LD1 A Drawing Schedule Specifications prepared by Bird 16.12.2023
Landscape Design
LD2 A Finishes and Planting Schedules Prepared by Bird 16.12.2023
Landscape Design
LD3 A Details prepared by Bird Landscape Design 16.12.2023
LP1 A Planting Plan – Ground Floor Prepared by Bird 16.12.2023
Landscape Design
Page 15 of 22
Document Set ID: 22769918
Version: 5, Version Date: 10/04/2024
Page 16
Annotated by Council
LP2 A Planting Plan – First Floor Prepared by Bird 16.12.2023
Landscape Design
CURRENCY PERIOD
35. The Currency Period for this development approval lapses if the development has not
substantially started by 9 April 2026, unless an application to extend the currency period is
approved by Council.
PRIOR TO COMMENCEMENT OF WORKS
Bonds
36. A site control and/or compliance bond of $10,000 is to be submitted to Council prior to the
pre-start meeting. The pre-start meeting will only be held once Council's Construction
Engineering Officer has confirmation that the bond monies have been received by Council.
The bond will be refunded less any costs incurred by Council in ensuring compliance with
these conditions or any additional inspections incurred for substandard work or work
undertaken not in accordance with this permit.
37. Bonds must:
a. have approval of the bond calculations and amount from Council prior to lodgement
b. be lodged with Council and accompanied by the Bond Administration Fee/s.
c. be requested for release by writing to Council, when relevant approval requirements
have been met.
Engineering
38. All necessary approvals from external service providers (e.g., Unitywater, Energex) and
external parties on which the development works are proposed have been obtained and a
copy supplied to Council.
39. A condition report including photographs of the frontage of the site must be completed and
submitted to council at the prestart meeting / prior to any works commencing.
40. Certificates demonstrating currency of public liability insurance and works insurance covering
the works must be submitted to Council prior to the prestart meeting.
41. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
pre-start meeting must include the relevant parties for the following aspects of the works:
a. Civil engineering works; and
b. Landscape works.
42. A Construction Management Plan must be submitted to Council prior to the pre-start meeting
and must specifically address the following:
a. Traffic management during all phases of construction;
b. Adequate parking arrangements for works and deliveries;
c. appropriate traffic signage in accordance with the Manual of Uniform Traffic Control
Devices (MUTCD); and
d. provision for safe vehicle and pedestrian access across the frontage of the site both
during daily construction and after daily construction has ceased.
43. Any changes to the details associated with the supervising RPEQ or Principal Contractor
during construction, must be notified to council in writing within five business days of the
change occurring.
Page 16 of 22
Document Set ID: 22769918
Version: 5, Version Date: 10/04/2024
Page 17
44. Any conflict between the development and an existing or proposed service must be referred
to the relevant service authority for determination prior to commencement of works.
DURING CONSTRUCTION
Engineering
45. The developer must meet any costs to repair damage to any Council asset during
construction, where damage is a result of the development works. Damage to assets must
be repaired immediately where it creates a hazard to the community. In circumstances where
the damage does not create a hazard to the community, it must be repaired immediately on
completion of the works associated with the development.
46. All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ)
who is independent of the Developer and Principal Contractor, and they must certify that all
works conform to the Operational Works permit. Where municipal works are involved, such
confirmation must be submitted for the respective hold points prior to any site inspection by
Council Officers.
47. All works must be constructed and work procedure undertaken in accordance with:
a. The approved plans/documents and conditions detailed in this Decision Notice;
b. All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
specifications and guidelines; and
c. The latest version of the Healthy Waterways document “Water Sensitive Urban Design
Technical Design Guidelines for South East Queensland” for all water quality devices
to be constructed on site.
Works within Road Reserve/Reinstatement
48. Safe vehicle and pedestrian access on all streets in the vicinity of the development must be
maintained at all times. Should footpath/road closures be necessary to carry out construction
works, Council’s Engineering Officer must be notified prior to the proposed closure and all
requirements complied with.
49. All frontage works must match neatly with existing road and verge/footpath features.
Additional works beyond the frontage may be required to provide an acceptable transition to
existing road and verge/footpath profiles.
50. Electrical conduits or other services proposed to be installed within existing and proposed
road reserves under existing sealed carriageways, concrete pathways, concrete/sealed
driveways or significant vegetation must be installed by boring. Trenching is not permitted,
unless specifically approved by Council.
Site Access and Driveways
51. Driveway crossovers must be constructed in accordance with Council’s Standard Drawings
RS-049, RS-050 & any associated addendum.
52. Any existing unnecessary or redundant property accesses must be removed, and the kerb,
footpath and verge area reinstated to match the existing footpath and/or verge treatments.
Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed
or turf, and must be maintained by the developer until established.
53. The following must be complied with during the construction of the required
crossover/driveway:
a. The driveway surfacing must consist of either an approved hot mixed asphaltic
concrete or patterned/plain concrete;
b. The driveway must be constructed so as not to concentrate stormwater runoff onto
neighbouring properties;
c. Underground service conduits for water supply, electricity and any other services must
be provided as part of the access driveway;
Page 17 of 22
Document Set ID: 22769918
Version: 5, Version Date: 10/04/2024
Page 18
d. Where there is an existing pedestrian path, a matching crossfall must be provided for
the driveway on the alignment of the path, for the full width of the path; and
e. The property access must be located a minimum of 1m clear of existing power poles,
streetlights or other signage. The developer is responsible for any necessary relocation
of existing services to provide this clearance and must contact the relevant service
authorities and comply with their requirements in relation to these works.
Earthworks and Retaining Walls
54. All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines
on Earthworks for Commercial and Residential Development, with geotechnical testing
undertaken in accordance with Section 8 of the Standard, and to a minimum of ‘Level 1’ as
defined in Appendix B. Test results as required by AS 3798, and a certificate of quality and
uniformity of fill shall be provided by a RPEQ and submitted to Council prior to the
commencement of use.
55. Fall protection must be provided to retaining walls that are over 1m high.
56. Slope and batters are a maximum grade of:
a. 1 in 6 where in proximity to waterbodies;
b. 1 in 4 for grassed areas;
c. 1 in 3 for planted areas; and
d. 1 in 2 for combined structural engineering and planting solutions.
Stormwater Drainage
57. Appropriate scour protection must be provided at the outlet of all stormwater pipes including
temporary outlets.
58. Works associated with this permit must not adversely impact on the existing drainage
conditions on other properties (e.g., by blocking or interfering with natural overland flows).
59. Construction of all internal stormwater drainage works must comply with the relevant
section/s of Australian Standard AS/NZS 3500.3.
Erosion and Sediment Control
60. Prescribed Water Contaminants (as defined in Schedule 10 of Environmental Protection
Regulation 2019) must not be released from the site or to waters within the site, or be likely
to be released should rainfall occur, unless all reasonable and practicable measures are
taken to prevent or minimise the release and concentration of contamination.
61. Sediment and erosion control measures must be in place prior to works commencing. If such
measures are not in place or are not satisfactory, “on the spot” fines may be issued. Such
fines can be issued if sediments from the site are found to enter or have the potential to enter
Council’s stormwater system, natural waterways, any downstream stormwater filtration
system or adversely impacting on other properties. The sediment and erosion control design
and measures have NOT been approved, it is the site's Supervising Engineer who is
responsible for ensuring that the sediment and erosion control measures have:
a. Been duly designed by an RPEQ or CPESC and constructed in accordance with "best
practise" methods;
b. Been revised by an RPEQ or CPESC to address the issues raised by changes in the
projected construction schedule and/or methods;
c. Been revised to address predicted rainfall events; and
d. Achieve the desired environmental outcomes.
Council may request further controls to be installed should the implemented measures be
found inefficient.
Page 18 of 22
Document Set ID: 22769918
Version: 5, Version Date: 10/04/2024
Page 19
62. The erosion and sediment control measures must be designed, installed and maintained in
accordance with the supervising engineer instructions and the current best practice
standards * (Refer to Advisory Note).
63. The developer must ensure non-essential exposure of soil is prevented by restricting the
extent of disturbance and minimising the duration of soil exposure to adverse weather
conditions and effectively turf, cover or stabilise any disturbed area without delay and prior
to rainfall occurring.
64. The developer must ensure sediment does not leave the site or enter onto adjoining
properties or Council’s drainage system due to surface runoff or on tyres of vehicles and/or
machinery. It is essential to implement appropriate approved erosion and sediment control
measures throughout the site during all phases of construction including vehicle shakedown
pad/grid (or similar) at the access to the construction site. Where sediments or other
contaminants are deposited on a road, they must be removed so as not to enter Council’s
drainage system or waterways.
65. Prior to the completion of the development and commencement of use, all site surfaces must
be effectively stabilised using methods which have achieved effective short-term stabilisation
and which will continue to achieve effective stabilisation in the medium to long-term.
For the purpose of this condition, an effectively stabilised surface is defined as one that does
not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion
or lead to sedimentation, or lead to water contamination.
Damage to Services and Assets
66. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
FOLLOWING CONSTRUCTION
Certification
67. Upon completion of the work a certificate must be issued by an RPEQ certifying that the
works have been constructed in accordance with the Operational Works permit.
68. A final inspection and approval of the new driveway and completed reinstatement works by
Council’s Inspector is required. Please contact Council on 5329 6500 to arrange for the
inspection.
LANDSCAPING
DURING CONSTRUCTION
69. All works must be constructed and work procedure undertaken in accordance with:
a. The approved plans/documents and conditions detailed in this Decision Notice.
b. The relevant conditions of the higher order Material Change of Use approval viz.
MCU24/0001 to which this approval relates.
c. All relevant Council Planning Scheme Policies, standard drawings, standard
specifications and guidelines.
Fauna Management
70. Prior to felling or pruning, all trees are to be checked for wildlife (i.e. koalas, possums, birds
etc.) If wildlife is present, the tree vegetation must not be felled or pruned until the wildlife
has left vegetation or has been relocated by a qualified fauna spotter catcher.
Page 19 of 22
Document Set ID: 22769918
Version: 5, Version Date: 10/04/2024
Page 20
*(Refer to Advisory Note)
Removal of Existing Trees and Vegetation
71. Removal of existing trees and vegetation must be undertaken by a qualified person* and
must include:
a. Legal disposal of all removed vegetation and debris.
*(Refer to Advisory Note)
Landscaping Works
72. Landscape works must be supervised, undertaken and certified by qualified persons*. All
works must be completed in accordance with this Decision Notice.
(* Refer to Advisory Note)
73. Where damage occurs to any Council asset as a result of the development works, it must be
repaired immediately where it creates a hazard that presents risk to person or property. Other
damage must be repaired prior to completion of works.
74. Street trees must:
a. Meet AS2303 Tree stock for landscape use.
b. Be located in accordance with engineering requirements for safe vehicle and
pedestrian sight lines.
5. REFERENCE DOCUMENTS
Not applicable.
6. REFERRAL AGENCIES
Not applicable.
7. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
Infrastructure Charges
1. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
made pursuant to the planning legislation and regulations current at the time of issue. For
further information, please refer to https://www.noosa.qld.gov.au/planning-
development/development-tools-guidelines/infrastructure-charges
Development Compliance Inspection
2. Prior to the commencement of the use, please contact Council's Development Assessment
Branch to arrange a Development Compliance Inspection.
Sustainability
3. Council encourages sustainable and energy efficient building design for all development,
including the use of sustainable building materials, energy efficient fittings, solar hot water,
photovoltaic systems (including the use of inverter/charges), solar panels, water saving
devices and rainwater harvesting.
Fires in Urban Areas
4. In urban areas fires are prohibited except where in an appliance is used for domestic heating
or cooking purposes, which must comply with particular standards. Any area identified as a
fire pit area on approved plans is to be in accordance with Local Law & Subordinate Local
Law No. 3, Schedule 3. Refer to the following link for details:
https://www.noosa.qld.gov.au/community/local-laws/local-laws-overview
Page 20 of 22
Document Set ID: 22769918
Version: 5, Version Date: 10/04/2024
Page 21
Building and Construction Industry (Portable Long Service Leave) Levy
5. The QLeave levy must be paid prior to the issue of a development permit where it is required.
Council will not be able to issue a Decision Notice without receipt of details that the Levy has
been paid.
General Advisory Notes
6. As this driveway is a private structure, the owner bears full responsibly for the standard of its
construction, maintenance and any liabilities associated with its construction. It is
recommended that professional advice be sought for the construction of the driveway to
ensure that the driveway is constructed in accordance with standard drawings RS-049, RS-
050.
7. Council has undertaken an audit check of the Operational Works drawings in relations to the
proposed works. A detailed check of the calculations and drawings has not been undertaken,
as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of
the engineering design. Council reserves the right to require further amendments and/or
additions at a later date should design errors become apparent.
8. Council reserves the right to call up any performance bond held or levy charges against the
property, should emergency works be required to be undertaken by Council to make the site
safe due to inactivity on the development site for extended periods of time.
9. Should any changes or modifications to the approved plans be required as a result of
construction constraints, a “Request to change an existing approval” under the Planning Act
2016 must be made. Amended plans clearly indicating the changes must be lodged with this
application along with the appropriate fees.
Prestart, On and Off Maintenance, Rehabilitation Inspections Request
10. Contact Council on 5329 6500 to arrange a prestart or an inspection giving a minimum of 5
business days’ notice of preferred inspection time.
11. If Council officers are required to undertake additional inspections of the same works, a
reinspection fee will be applicable in accordance with Council’s Fees and Charges register
applicable at the time.
Environmental Advisory Notes
12. The Environmental Protection Act 1994 states that a person must not carry out any activity
that causes, or is likely to cause, environmental harm unless the person takes all reasonable
and practicable measures to prevent or minimise the harm. Environmental harm includes
environmental nuisance. In this regard persons and entities, involved in the civil, earthworks,
construction and landscaping phases of this development are to adhere to their ‘general
environmental duty’ to minimise the risk of causing environmental harm.
Erosion and Sediment Control
13. Accepted best practice standards include International Erosion Control Association
Australasia Best Practice Erosion and Sediment Control.
14. Qualified Person, for the purpose of erosion and sediment control is a Certified Professional
in Erosion and Sediment Control (CPESC) or suitably experienced Registered Professional
Engineer of Queensland (RPEQ).
15. As a general rule, a site is determined to have achieved effective short-term stabilisation if
at the time of the plan sealing inspection:
a. Methods of stabilisation are:
• appropriate for slopes and slope lengths; and
• are consistent with best practice environmental management practices such as in
the Manual for Erosion and Sediment Control or the IECA Manual; and
Page 21 of 22
Document Set ID: 22769918
Version: 5, Version Date: 10/04/2024
Page 22
b. Stormwater runoff from the site is not currently, and is not likely to result in visible
evidence of sedimentation or erosion, or lead to water contamination.
Removal of Existing Trees and Vegetation
16. Stockpiling mulch to the appropriate volume and separation is required for fire mitigation as
well as optimum weed seed sterilisation.
Qualified Person
17. Qualified Person, for the purpose of:
a. Supervising landscape works and preparing a landscape certification, is considered to
be a landscape architect, landscape designer or horticulturist with a minimum of three
years current experience in the field of landscape design.
b. Undertaking landscape construction and establishment works is considered to be a
person with five years current experience in commercial landscape construction
projects.
c. Managing Fauna protection is considered to be a certified Fauna Spotter Catcher.
d. Undertaking, supervising tree works and preparing arboriculture certification, is
considered to be a person with a minimum three years current experience in tree
protection, hazard identification/mitigation and AS2303 Tree stock for landscape use
assessment and either:
i. International Society of Arboriculture (ISA) certification; or
ii. A Diploma of Arboriculture.
8. PROPERTY NOTES
Not applicable.
9. VARIATION APPROVAL DETAILS
Not applicable.
10. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit Required Subject of the required Development Permit
Development Permit for Building Works All building work (including demolition).
11. SUBMISSIONS
Not applicable.
12. RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written
representations to Council about the conditions contained within the development approval. If
Council agrees or agrees in part with the representations, a negotiated decision notice will be
issued. Only one negotiated decision notice may be given.
13. OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on line at
www.noosa.qld.gov.au or at Council Offices.
Page 22 of 22
Document Set ID: 22769918
Version: 5, Version Date: 10/04/2024
Used in these records
Delegated Report - Code - Planning MCU24 0001.pdfRelated documentApplication case desk ↗
About this file
- File size
- 14.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.