Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

Dewatering Management Plan

of 44

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                         ADG Consulting Pty Ltd



     No additional relevant information can be summarised from this report in relation to the dewatering
     operations for the project.
3.3 Groundwater quality
     No site‐specific groundwater quality data was provided to ADG to assist with the preparation of this DMP,
     however numerous groundwater investigations and dewatering monitoring projects that have been
     undertaken by ADG throughout the Noosa Coast Region in recent years. Our understanding of the
     groundwater quality in the region is provided below:
          Groundwater is generally mildly acidic to neutral, with pH levels ranging from approximately 5.5 to
           6.5 and electrical conductivity ranging from brackish to saline between 2,000 µS/cm to
           48,000 µS/cm. Groundwater pH has the potential to reduce (become more acidic) following
           oxidisation of PASS as dewatering progresses, particularly if re‐wetting of the soils occurs.
          Dissolved oxygen levels in static groundwater typically range from approximately 35 – 40 %
           saturation.
          The groundwater associated with indurated sand strata is moderately to highly turbid as a result of
           staining and organic content.
          Concentrations of dissolved metals are typically below the available marine water trigger values
           (MWTV’s) provided in ANZECC/ARMCANZ (2000) for the receiving waters, however elevated levels
           of aluminium and particularly iron are expected in the untreated groundwater and have the
           potential to increase following oxidisation of PASS as dewatering progresses or as a result of existing
           acidic groundwater conditions.
          Given the location and previous use of the site, groundwater impacts resulting from site
           contamination are not anticipated.
     A groundwater investigation will be undertaken at the commencement of dewatering as described in
     Section 6.5.2 of this report. This assessment will be representative of the groundwater being extracted
     and treated from the entire site, as opposed to localised monitoring well data which is often misleading.
     Based on previous experience with dewatering in the area, ADG expects the groundwater to require
     treatment to increase pH and dissolved oxygen levels, as well as reduce turbidity, suspended sediments
     and dissolved metal concentrations prior to being discharged to the Noosa River Canal System.




ADG1786.25 Dewatering Management Plan_Rev0_20.02.25                                                         Page 5
Log in to download the original file

Dewatering Management Plan.pdf · 3.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.