Council archive · source document
response to information request 22 arakoon · MCU19/0008.02
10. Please provide calculations to corroborate as per the Low Density Residential
Zone Code is to be measured per storey.
A ‘birds eye view’ site cover calculation is provided with the revised plan set demonstrating
a site coverage of 37% across all levels. The large landscaped setback to the coastal
boundary ensures the built form has a low site impact.
11. Provide an amended geotechnical report that certifies that the use of on-site
infiltration is suitable given the high landslide risk. The amended report must be
endorsed by a suitably qualified person (RPEQ – Registered Professional
Engineer of Queensland).
12. Provide an Earthworks Plan demonstrating the extent of the proposed
earthworks required to carry out the proposed works. The additional plan must
be prepared by a suitably qualified person (RPEQ – Registered Professional
Engineer of Queensland) and include, but not be limited to:
a the extent and volume of cut and fill;
b construction methodology; and
c adhere to the recommendations made in Pacific Geotech’s Geotechnical
Stability Assessment (PG-2096).
Amended Geotechnical report recommendations are provided by Pacific Geotechnical
Engineers and an amended earthworks plan by SCG in accordance with this report.
Page 5 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
response to information request 22 arakoon.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.0 MB (small file)
- File type
No other editions are linked here.