Council archive · source document
Attachment A Landscaping Plan · MCU13/0051
Attached to the e-mail MCU13/0051 Cooran Information Request Response.
Plans and drawings: the text below has words only, no drawings.
RP 891100
CREEK CROSSING
=— GATED ACCESS
(UNLOCKED)
8
BE
gv ®
9088 ® %e PLANT SCHEDULE
LOT 3 8 CODE |BOTANICAL NAME NO|SIZE — | HEIGHT |STAKING / | HEIGHT ar
RP 193767 ATTIME OF |GUYING MATURITY
8 8 PLANTING (INDICATIVE)
EXISTING ENERGEX ® 8
POWER POLE ACA lei |ACACIA leiocalyx 6 | 75mm |} 250mm - to 6m
CAL CC |CALLISTEMN 'Captain Cook' 9 | 140mm |} 300mm - to 2m
LOCATION aepee PLAN BELOW, CAL DR_ |CALLISTEMON 'Dawson River' 5 | 140mm | 300mm - to 6m
\ es ‘ ee EUC ter |EUCALYPTUS tereticornis 9 | 75mm | 250mm - to 20m
LOT 19 é 5 SERVIC MAINS LEP poL |LEPTOSPERMUM polygalifolium| 12 | 75mm | 250mm - to 3m
RP 187355 ae : RP 176169 LOP con |LOPHOSTEMON confertus 4 25L | 3000mm S to 20m
LOCATION PLAN MEL qui |MELALEUCA quinquenervia 8 25L | 2000mm Ss to 25m
N.T.S
=
— 8
N wo
~ S See
aoe
Bwea
~~ ‘ ve IXI9
NS \ EXISTING VEGETATION ————$¥" -
NX \ To remain. SY
<\——. 8m WIDE 3
\ \ ACCESS TRACK. oS
\ \ ae
aA
\ SA
EXISTING SHIPPING \ \ CAPE
CONTAINER. . \ ae
an
[~ — 15268 \ os
—~ \ 152.59 Cara
— \ es
2 LEP pol | an~Qa*
44596 1 | y
OPOSED NEW LOCATION : | a v
DR SHIPPING CONTAINER. | ae
—~—_ —__ ars
2 CAL DR FY. — /
EXISTING SHIPPING sea |
CONTAINER TO BE 63 4. | FAs
RELOCATED. SLOP con i
3 EUC ter 3CALDR
1 MEL qui oH
3 ACA lei
2 MEL qui
CHAINWIRE FENCE &
GATE TO COMPOUND
BY OTHERS.
5 LEP pol
15 3 EUC ter
3MEL qui. ——o>5-——> An
2 MEL qui
3 EUC ter {~ —+
+
3CALCC
+
156.27 3 ACA lei —
- —A — —A E
3 CALCC AE — A
Oo
1 LOP con—4 Oo
3 LEP pol NEW ENERGEX
3CALCC 153.17 TRANSFORMER POLE.
NEW ENERGEX
NOTE: All plants to be spaced at
approx. 1.5m centres.
2 LEP pol
SERVICES MAINS.
3m WIDE BUFFER PLANTING AS SPEC.
Provide a 1m dia. Mulch ring to each plant
AS SPEC.
PLAN
1:100 @AM1
LANDSCAPE SPECIFICATION NOTES:
EARTH WORKS
CLEARING: Clear areas indicated on the drawings of trees, stumps,
shrubs, slab foundations, paving and other surface debris.
EXCAVATION: Excavate or fill areas to dimensions as shown on the
drawings. All debris and material not suitable for backfill shall be removed
from the site. Ensure caution when excavating near services. Consolidate
areas of fill
TREE PROTECTION:
MARKING: Mark all trees to be retained with a zincanneal tag, painted
yellow. Secure the tag to the tree with a loose galvanised steel wire band.
At the end of the Contract, the Superintendent will check and remove the
tags
TREE PROTECTION ZONES: Trees to be retained are to be protected
within tree protection zones (TPZs) as follows -
- The perimeter of TPZs must be outside the existing canopy of the
vegetation or as specified by the Arboricultural Consultant.
- All TPZs are to be fenced with Temporary Fencing Panels (TFP) or
Arboricultural Consultant approved alternative.
- No person, vehicles or machinery are to enter the TPZs except with the
written consent of Council
- Any underground service installations must be bored and utility authorities
must utilise a common trench where possible.
-No fuel, oil dumps or chemicals are allowed to be used or stored within
TPZs and the servicing and re-fueling of equipment and vehicles must be
carried out away from the root zones.
- No storage of material, equipment or temporary building is to take place
within the TPZs.
- Nothing whatsoever is to be attached to any tree including temporary
services wires, nails, screws or any other fixing device.
-TPZ fencing is not to be relocated without specific approval from the
Consulting Arboriculturist and the Ecologist or Landscape Architect
EXCAVATION: Do not remove topsoil from within the drip line of trees to
be retained unless otherwise specified. If it is necessary to excavate within
the drip line, use hand methods such that root systems are preserved
intact and undamaged. Open up excavations under tree canopies for as
short a period as possible. Do not place spoil from excavations against
tree trunks, even for short periods. All care shall be taken to avoid damage
to the bark of trees
TREE ROOT TREATMENT: Do not cut tree roots exceeding 50 mm
diameter unless permitted by the Superintendent. Where it is necessary to
cut tree roots, use a chain saw or similar means such that the setting does
not unduly disturb or rock the remaining root system. Immediately after
cutting, apply an approved fungicidal sealant to the cut surface.
BACKFILL to excavation around tree roots with an imported topsoil mixture
as specified. Add fertilizer at the rate of 0.5kg/m3 as specified in
PLANTING. Place the backfill in layers, each of 150 mm maximum depth,
solidly compacted to eliminate voids. Do not backfill around tree trunk to a
height greater than 150 mm above the original ground surface
WATERING: Immediately after backfilling, thoroughly water the root zone
surrounding the tree.
DECOMPACTION: If the ground under the tree canopies has been unduly
compacted during the work under the Contract, for example by the
operations of heavy constructional plant, loosen the soil to a depth of
150 mm
STOCKPILES: Do not stockpile materials near trees to be retained
RETAINED TREES are to be assessed by a qualified arborist to identify
necessary pruning and tree surgery works. Where pruning of retained trees
is required it is to be undertaken in accordance with AS4373/96 and the
"three-cut" method is to be utilised
DAMAGE TO EXISTING TREES: Should any tree be damaged during the
work under the Contract, and if the Superintendent permits repair work to
be done, such repair work should be performed by an approved tree
surgeon at no extra cost.
REMOVAL: If repair work is considered impracticable, or is attempted and
fails, if so directed, remove the tree and root system, make good as
necessary, and either replace the tree or pay damages, as determined by
the Superintendent.
REPLACEMENT: Provide, plant and establish as part of the works, at no
extra cost to the Principal, a replacement tree of the same species and
similar size or as approved by the Superintendent.
DAMAGE ASSESSMENT: If replacement as part of the works is not
approved, pay for any tree removed pursuant to the above, damages
assessed by the Superintendent as the cost of replacement by others or to
a maximum cost of $3,000 unless otherwise specified.
CULTIVATION Cultivate all new planting beds to a minimum depth of
200mm.
TOPSOIL & MULCHING
TOPSOILING
TYPE : Imported topsoil from an approved supplier to AS 4419 1998.
Ensure soil is free of stones, weeds, sticks, roots and other deleterious
material toxic to plant growth
DEPTH
Planting Beds: 200mm
SPREADING:Spread topsoil to the depths indicated and lightly compact so
that the surface is smooth, free from hollows and has even grade falls
Spread the soil flush with any abutting surfaces generally, but allow for the
depth of mulch as necessary,
MULCHING
Place a 1m dia. mulch ring to each plant at time of planting.
TYPE: Hoop Pine mulch to a depth of 50mm to all plants indicated on the
drawings. The mulch must be free from soil, weed growth and other
deleterious material harmful to the plants
PLANTING
PLANT MATERIAL: Only use vigorous, well established plants of local
provenance with large healthy root systems that show no evidence of
having been restricted or damaged. Plants must be free from any pests
and disease, well hardened off and of a good form consistent with their
species or variety
PLANT SIZES: Where a minimum plant height is specified in the "PLANT
SCHEDULE" the height shall be the vertical distance between the top of the
pot and the natural top of the plant whilst standing vertically in the pot.
SUBSTITUTIONS: Make no substitutions unless provided in writing
Substitutions will not be approved if plants have not been made
available for inspection at the Nursery within 30 days of the Contract
being awarded
REPLACEMENTS: Replace, with plants of the same specified type, quality
and size, any plants which fail or are damaged during the work under the
Contract.
WARRANTY: Furnish a warranty from the supplier attesting that the plants
are true to the specified species and type, and free from diseases, pests,
weeds and the like
STORAGE: Wherever possible, plants shall be planted immediately after
delivery to the site. If this is not possible, Keep them in good condition by
appropriate storage methods, or as may be directed. Prevent theft, drying
out or damage from any cause including frost, wind, sun, vermin, animals
and the like. Provide an on_site nursery for holding plant stock on site for
more than 48 hours, of sufficient size, with provision for watering.
POTTING ON: If directed, pot plants into larger soil-filled containers to
prevent them becoming root bound if there is an unforeseen delay. The
Contractor shall bear the cost of potting on. Do not carry out potting on
unless authorised.
POT SIZES: Supply plants in weed-free containers of the sizes specified in
the "PLANT SCHEDULE" shown on the drawings.
PLANT TYPES: Refer Plant Schedule
PLANTING: Water the plant and the planting areas thoroughly before
planting begins. The planting holes should be large enough to allow the
placement of the plant without damaging its root system. Remove plants
carefully from container ensuring minimum soil loss and root disturbance.
Root prune any root bound plants. Place plants centrally in their holes and
so that the top of the soil level in the pot is 20mm below the finished
surrounding soil level. Fertilize with a slow release tablet form of fertilizer.
Backfill all holes using imported topsoil as specified. Water plants
thoroughly.
Tree Planting & Staking: Refer DETAIL LDO1.
ESTABLISHMENT & MAINTENANCE
General
Landscaped areas shall be maintained by the Contractor from the time of
installation until the end of the Landscape Establishment Period. The
Landscape Establishment Period shall be 12 months, with weekly visits for
the first twelve (12) weeks, then monthly for remaining of 9 month period
Maintenance shall include watering, fertilizing, mowing, weeding, pruning,
pest and disease management, plant replacement, site drainage and
general tidying of the treated areas
Watering
Watering shall be carried out at sufficient frequencey to ensure
establishment of the plants.
Pruning
Plants shall be pruned as necessary to promote vigorous new growth.
Pest and Disease Management
Plants shall be monitored for pest and disease incidence on a weekly
basis. Acceptable plant protection techniques shall be employed to
manage any infestations.
Site Drainage
All landscape areas shall be maintained with sound drainage principles
and the avoidance of runoff from the Site shall be enforced. Each irrigation
of the Site shall be over a period of time that allows water infiltration
(percolation) via the soil and does not produce run-off water.
Tidying
All landscaped areas shall be kept in a neat and tidy condition during the
Landscape Establishment Period
Tidying shall include but not be limited to: the collection and removal of
litter, plant prunings and dead plants; removal of mulch from roads and
pathways; checking and adjusting plant support stakes and ties; and
making good any disturbance to the surface of mulches
Plant Replacement
Replace at no extra cost, any plant which dies from the cause whatsoever
during the Establishment period. Plant replacements shall be of the same
size and species and equal to size and similar plants at the time of death
LEGEND
7c
B 05-12-2013
A 29-11-2013
EXISTING VEGETATION
TO BE RETAINED.
PLANTING
AS SPEC
APPROVAL
APPROVAL
AMENDMENT:
FIGURED DIMENSIONS TAKE PREFERENCE TO SCALE.
VERIFY AND CHECK ALL DIMENSIONS ON SITE
Copyright by Jeremy Ferrier Landscape Architects. This drawing
may not be reproduced for any purpose without the consent of
Jeremy Ferrier Landscape Architects.
NOTES
e STAKING TO BE CARRIED OUT PRIOR TO BACKFILLING
PLANTING HOLE
TABLE GUIDE
PLANT SIZE STAKE SIZE | , posiTION STAKES AWAY FROM ROOTBALL
450 - 600 900x25x25 STAKES TO BE ROUGH SAWN HWD TO SIZES AS
600 - 900 1200x25x25 SPECIFIED
7000 ve te0Oenoe + TIES SHALL BE NON-ABRASIVE, HEAVY DUTY POLYTHENE
715 25x25 STRIPS LOOSELY TIED AROSND STEM IN A FIGURE EIGHT
1500-1804 2100x38x38 CONFIGURATION
1800-2404 2400x38x38
* TIES SHALL BE ATTACHED TO STAKES WITH GALV. WIRE
STAPLES.
DO NOT PLACE
HARDWOODS STAKES
THROUGH ROOTBALL.
SECURE STAKE FIRMLY
INTO NATURAL
GROUND. SECURE
TREE WITH TIES BY
LOOPING TIES INA
FIGURE EIGHT PATTERN
MULCH AS SPECIFIED.
PULL AWAY FROM BASE
OF PLANT.
TOPSOIL AS SPECIFIED
FERTILISER TABLETS.
PLACE SLOW RELEASE
FERTILISER AT THE
DEPTH OF THE
ROOTBALL. DO NOT
ALLOW TABLETS TO
COME INTO CONTACT
\ WITH ROOTS. REFER
SPEC.
150 150
1 + Ley tivaeD
SUBGRADE
LDO1
TREE PLANTING & STAKING
Scale NTS
Email
JEREMY FERRIER
LANDSCAPE ARCHITECT
72 Vulture Street,
West End QLD 4101
Telephone: (07) 3844 0700
Facsimile (07) 3844 0722
[email protected]
CLIENT:
NBN Co. Ltd.
PROJECT:
NATIONAL BROADBAND NETWORK
321 COLES CREEK ROAD COORAN
SITE No: 4GYM-51-32-SCHR
DRAWING:
LANDSCAPE PLAN
SITE:
321 COLES CREEK ROAD
COORAN QLD 4569
DATE: NOVEMBER 2013
SCALE: A.S
DRAWN: CW APPROVED: JF
PROJECT NO: DWG NO: ISSUE:
2013.151 LP1.01 B
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment A Landscaping Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.