Council archive · source document
Delegated Report OPW16/0186
1. APPLICATION DETAILS Application No: OPW16/0186 Street Address: 46 Nairana Rest NOOSA HEADS QLD 4567 Real Property Description: Lot 36 RP 88934 Planning Scheme: The Noosa Plan (16 September 2013) 2. DECISION DETAILS The following type of approval has been issued: Development Permit for Operational Work – Non Standard Vehicle Crossover 3. RELEVANT PERIOD OF APPROVAL The relevant period for this development approval is 2 years starting the day that this development approval takes effect. assessment manager conditions APPROVED PLANS Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan Description Date WD D Project No 13/030 01 Driveway Plan and Driveway Cross Over, prepared by VOID Building Design 29/08/2016 PRIOR TO COMMENCEMENT OF WORKS The principal contractor must have all the appropriate insurance and public liability documentation to carry out the works. The principal contractor is also responsible to ensure that any subcontractors also have the appropriate insurance and public liability documentation. Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council if requested. Traffic management measures must be implemented and discussed with Council’s inspector at the pre-start meeting and must specifically address the following: Appropriate traffic signage in accordance with the Manual of Uniform Traffic Control Devices (MUTCD) to provide warning to drivers and road users of any safety hazard or changes to traffic conditions due to the proposed works. Fencing to the work site during the construction phase as may be necessary to ensure the safety of the public and the road users. Provision for safe pedestrian access across the frontage of the site both during daily construction and after daily construction has ceased. Providing safe parking arrangements for all machinery, appliances and cars during construction phase without adversely impacting on the traffic flows, traffic safety and the availability of parking spaces along the local streets. DURING CONSTRUCTION General The developer must meet any costs to repair damage to any Council asset during carrying out the works including any damage to existing vegetation where damage is a result of the development works. Damage to assets must be repaired immediately where it creates a hazard to the community. In circumstances where the damage does not create a hazard to the community, it must be repaired immediately on completion of the works associated with the development. The works must not cause damage to, or removal of, any existing tree within the road verge unless a prior approval is obtained from Council in this regard. All works must be constructed and work procedure undertaken in accordance with: The approved plans and conditions of this permit approval. All relevant Noosa Council Planning Scheme Policies, standard specifications and guidelines. The latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site. Driveway Driveway crossovers must be constructed generally in accordance with the approved plans and the relevant requirements of AS 2890.1, and must : Have a slip resistant surface. Have adequate ground clearance (no bottoming down or scraping) for a standard vehicle B99 as defined in the AS 2890.1. For public safety and to minimise potential of trip hazard, the crossover surface shall smoothly match the level of the grassed verge and adjoining surfaces. Be constructed so as not to concentrate stormwater runoff, create ponding or adversely impact on existing drainage conditions on neighbouring properties and/or the road verge. Have a minimum clearance of 500mm from any Unitywater/Telstra asset, unless a written approval is obtained from Unitywater/ Telstra and submitted to Council. The property access must be located a minimum of 1m clear of any existing power poles, streetlights or other signage. Road Verge Reinstalment Road verge area must be reinstated in a manner to match the existing footpath, kerb and/or verge treatments. Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed or turf, and must be maintained by the developer until established. All works must match neatly with existing road and verge/footpath features. Additional works beyond the frontage may be required to provide an acceptable transition to existing road and verge/footpath profiles. Any road pavement correction must be carried out in accordance with the relevant standards and to Council’s satisfaction. Pavement Design and Construction Pavement design for privately owned works must be undertaken in accordance with the relevant standards. Structural integrity of the driveway and car park areas will remain the responsibility of the property owner/developer and should be generally certified by an RPEQ. Pavement must be designed and constructed to comply with the Disability Discrimination Act (DDA), Access to Premises Standard and relevant sections of AS1428 Design for access and mobility. Environment (Erosion and Sediment Control) Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994) must not be released from the site or to waters within the site, or be likely to be released should rainfall occur, unless all reasonable and practicable measures are taken to prevent or minimise the release and concentration of contamination. The contractor must ensure non-essential exposure of soil is prevented by restricting the extent of works and minimising the duration of soil exposure to adverse weather conditions. Exposed areas must be suitably covered/stabilised/reinstated as soon as practicable and prior to any predicted rainfall occurring. Erosion and sediment control measures must be installed and maintained to minimise erosion on the site and to minimise the export of sediment and associated pollutants from the site, particular attention must be given to prevent sediment from entering into Council’s street stormwater drainage system. The erosion and sediment control measures must be designed, installed and maintained in accordance with current best practice standards (refer to advisory notes). Damage to Services and Assets Any damage caused to existing services, streetscape and assets as a result of the development works must be repaired at no cost to the asset owner at the following times: Where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or Where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. FOLLOWING CONSTRUCTION Certification and Final Inspection A final inspection and approval of the new driveway and completed reinstatement works by Council’s Inspector is required. Please contact Council on 5329 6244 to advise of completion and/or arrange for the inspection. referral agencies Not Applicable. Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: General Advisory Notes As the driveways are private structures, the property owner/applicant bears full responsibly for the standard of its construction, maintenance and any liabilities associated with its construction. It is recommended that professional advice be sought for the construction of driveways to ensure that the driveway and associated works are constructed in accordance with the relevant standards. Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works. A detailed check of the accuracy of the drawings has not been undertaken. The applicant bears full responsibility for all aspects of the engineering design. Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Sustainable Planning Act 2009 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees. Environmental Advisory notes The Environmental Protection Act 1994 states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm includes environmental nuisance. In this regard persons and entities, involved in the civil, earthworks, construction and landscaping phases of this development are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm. Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003. The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage.” It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any obligations under the ACH Act. property notes Not Applicable preliminary approval overriding planning scheme Not Applicable further development permits required Not Applicable. self assessable codes Not Applicable submissions Not Applicable reasons/grounds for approval DESPITE CONFLICT WITH SCHEME Not Applicable RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Sustainable Planning Act 2009 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice” may be given. Taking this step will defer your appeal period, which will commence again from the start the day after you receive a “negotiated decision notice”. (Refer to Part 8 “Dealing with decision notices and approvals” - Division 1 “Changing decision notices and approvals during applicant’s appeal period” of the Sustainable Planning Act 2009.) OTHER DETAILS If you wish to obtain more information about Council’s decision, electronic copies are available on line at www.noosa.qld.gov.au, or at Council Offices. Yours faithfully Monkeith Kadhum Development Engineer Enc: Approved Plans/Documents Appeal Rights cc Unitywater
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report OPW16/0186Related documentApplication case desk ↗
About this file
- File size
- 49 KB (small file)
- File type
- DOCX
No other editions are linked here.