INTEGRATED PLANNING ACT 1997                                                                          IDAS Assessment Checklist, Version 20, 2 April 2007
             | State-controlled road matters          2.   The application involves: (tick applicable box/es)
              Far more information refer to Gude 3         [J (i)  development on land contiguous* to a State controlled road and for -
             ‘ Unless you answered ‘none of the above” to 02,                    .                                    .             .
             i the application triggers referral to the Department |. _] (a) material change of use assessable against the planning scheme;
             ' of Main Roads (DMR) as a referral agency.           (1) (b) reconfiguring a lot unless -
             Tin certain circumstances DMR will be an advice                                          .     .          .                        :
             | agency, while in other circumstances DMR will               e the total number of lots is not increased; and
              be a concurrence agency.                                     « the total number of lots abutting the State-controlled road is not increased;
           | rear     ane     Remutston wl assist you to            CF (o) operational work (not associated with a material change of use assessable against the
             | concurrence agency for the application.                     planning scheme or reconfiguring a lot mentioned in (b) above}—
             ft.                                                           + associated with access to a State-controlled road; or
            ‘                                                              « for filling or excavation; or
             i                                                             e involving the redirection or intensification of site stormwater from the land, through a
             :                                                               pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
                                             .                               State-controlled road.                              ‘                               -
             :                                             [_] (ii) development on land not contiguous to a State-controlled road and -
             ,                                                      (] (a) material change of use -
             :                                                           ‘e assessable against the local government's planning scheme; and
                                                                          e mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
             ,                        :                                     that schedule;
.           ,                                                       (2) (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
      @                                               ;                     and exceeding the thresholds set by that schedule;
                                                                    (J (c) operational work (not associated with a material change of use assessable against the
             ,                                                             planning scheme or reconfiguring a lot mentioned in (b) above)-
             ‘                                                            ¢ assessable against the local government's planning scheme; and
                :                                                         * mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
                                                                            that schedule.
                                                           CX! (ii), none of the above
              Clearing vegetation                     3.   The application involves: (tick applicable box/es)
             _ For more information refer to Guide 12,     xi (i)   material change of use -
              Unl            ed “none of the above” to Q3,                                ;             .
             the applcaton requires assessment by he                 (a) assessable against the planning scheme;
              Department of Natural Resources and Water              b)  ona lot containing  —                                                                     ;
             _ fan agency other than NRWis the assessment                * acategory 1, 2 or area shown on a property map of assessable vegetation; or
              manager for the application, NRWis a                     . » ifthere is no property map of assessable vegetation for the lot - remnant vegetation;
             comcumence agency fr the application i eketion          (c)  where the existing use of the land is a rural or environmental use; and
              tfyou ticked Q3() or (f) your application requires     (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
:             referrat to NRW for assessment regardless of LJ (ii)  reconfiguring a lot -                           .
             whether vegetation clearing is proposed or not.                             .                           .
             ’                                                      (a)  on alot containing a category 1, 2 or 3 area shown on a property map of
     @                       :                                           assessable vegetation or, if there is no property map of assessable vegetation for
                                                                         the lot, remnant vegetation;
             :                                                 _    (b)   where the size of the lot before the reconfiguration is 2 hectares or larger;
                                                                    (c}   where 2 or more lots are created; and
             :                                                      (d)   where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
                                                           CL  (ii) operational work -
                                                                    (a)   for the clearing of native vegetation where the vegetation clearing is made
             :                                       ;                    assessable under Schedule 8 of the IPA; and
                                                                    (b)   not associated with a material change of use assessable against the planning
                                                :                         scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of       ,
 .                     o                                     oo          “Form 1           ;
                              .      wo              _ PA) sme inet ee sean te                               hn eh ete                       ee                 a
            ;                                              B<]  (iv) none of the above.
             Strategic port land                     4.    The application involves:
             he   toed     er ie   t ae      ay sin         1) (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
               you      1) - he rerevant Port Auino! le
            ; assessment manager for the application.            Act) - complete Part | of Form 1
            * if you ticked (ii) Queensland Transportis a  (1 (ii) a material change of use that is inconsistent with the land use plan approved under the
             concurrence agency for the application.              Tt Act for the strategic port land - complete Part f of Form 1
            Is,                                            CX] (iii) none of the above —                      -

             4  Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-contratled road; or that is part of a future State-
                controlled road.                                                                                                              ‘
                                                                                         Page 2

Used in these records

About this file

File size
2.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015A4F2.001.pdf · 2.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.