Council archive · source document
07/1017 - Op Works - landscaping, Acess &/or Carparking [As Published] · 142007.1017
oa
This checklist shoutd be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.
1.
Nexen w we Checklist - Applications Involving Land
Development & Land Use Sections
IDAS APPLICATION
APPLICATION FORMS
1.4
1.2
Form 1 PartA
fandoge
1.1.4 Ensure that the form is fully completed.
rm is fully pleted comerdtd.
1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required. ey ogy.
1.1.2.1. If there are multiple owners, the consent of each owner is required.
1.1.2.2 If the owner of the land is a company, either ACN No. or Company Seal required.
Form1 Part B-O Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. Cv]
1.1.2.1. Ensure that each of Forms B-O which are attached are fully completed. [Y]
REFERRAL INFORMATION
2.4
Ensure that items 1-23 have been checked and/or completed with regard to referrals. [7]
ENVIRONMENTALLY RELEVANT ACTIVITIES
3.1
3.2
“FORM 2 - REQUEST. TO CHANGE APPROVAL
4.1 Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent.
PLANS . . .
5.4 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational! 4
Works) accompanies the application. In addition ensure that each set is complete.
5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is “
SUPPORTING INFORMATION
6.1 Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction.
6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.
FEE oa me oe aoe a oN a
7.1. Ensure that the application fee, : as determined from the Council's adopted scale of fees, Y
accompanies the application or has been paid.
7.2. Ensure that the fee which has been paid is recorded on the application form. /
Ensure that Part G is completed if EPA referral is required.
Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.
unbound.
Receiving Officer ..... Jaentr Hine de teeeeeeeeeeeneeeeeueees Date ..
Having completed this form and accepted the application, please deliver both to the following IDAS Application Receiving
trays:-
{f the application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section.
if the application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.
If the application is for Operational Works (for parking, access, sewerage or drainage) exclusively —- AOD2 in the
Land Development Section.
In all other circumstances — AOP1's desk in the Land Use Section.
Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.
‘7907,
SEP! g:\ant\forms\application checklist.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 38 pages
Page 2
Part A, Version 2.4, 29 May 2006
a to | \
Common details &/
r
é ‘
The completion of all appticable questions on Part A is mandatory for all applications. Part A must be accompanied by the completed IDAS Assessment Checklist if
Tequired, and by one (1) or more other completed parts of the Form as required. For more information on the parts of the Form refer to www.ipa.atd.qov.au.
Any information requested in the form may be provided in an attachment to the application. For further information about completing the following details, refer to Guide 1.
Description of land 1. Street address: fneludinghouse number, street name, suburb/locality name & postcode) (if applicable)
‘ Kcation, must be -
imidorcrmimatest | (\S DouGlas street, Sunshine Beach 4567]
redvired In relation to a motite or temporary 2. Name of water body or watercourse, within which the development is proposed: (if appticabie)
Environmentalty Relevant Activity (ERA).
Advice for completing Q2 - Q2 applies if [ Not A Piicable |
development is proposed within a water body or
watecourse. 3. Lot on plan description (eg. Lot 123 on RP 4567) / GPS coordinates:
Advice for pleting Q3 - Most land be
iotifed by alo on flan descpton. These deta L\- 3 @ Comma Property en GTP ols |
ae fle doounens or trough te 4. The above description is for: (tick applicable box)
However, if the tand on which the development is (41) the land on which the development is proposed; or
seerhaael-seabteepsiiniiored ora C1 (ii) the land adjoining the water body or watercourse, within which the development is
watercourse) provide - proposed; or
a sigan 9 we C1 (ili) the water body or watercourse.
® poterecunonabeiearaiaetioane Bay). 5. Shop / tenancy number: 6. Storey / level: 7. Total area of tand: (m? or ha):
Advice for completing Q7 - Q7 d if the ~ . 2.
Hee ee ain eter boty of eoreye L N/A J | [ 728-4 M* |
Advice for completing 08 - 08 applies i 8. Local government area in which the land is situated: (eg. Esk, Hervey Bay, Woocoo etc.) (if applicable)
development is within a local goverment area.
toe: Ares tion nghvowrmatsenatwitineg | | NOS SHIRE COUNCIL
Local Government Act 1993, 9, Port authority for the strategic port !and or strategic port land tidal area on which the
raceme reo potiodorat sree an is proposed: (ag. Port of Brisbane, Port of Townsville) (if applicable) >
port land tidal area. For more details refer to Guide 11 N/A
Proposal details 10, Existing use of the land: (eg. vacant, single house, shop etc.)
Yow residerinon nae wismyte | [| VACANT LAND (EXISTING BUILDING To BE DeMousHt)
11. Proposed use of the land: (eg. 6 unit apartment building, 30 lot residential subdivision, ERA for aquaculture in
ponds with a total area of 7 ha for which wastes are released into waters etc).
[DuPLex |
Other applicable parts of Form 1 12. Other parts of Form 1 completed as part of this application: {eg. Part D, Part /, etc)
Part A must always be ied by other
conte pats of For For vomaton stout Leoem 1- PAat 6
when a part of Form 1 may apply refer to Guide 1.
Applicant details 13. ir 's name: 15. Contact person:
Clearly identify who is making the application. The o by
applicant need not be the owner of the land. ALA N ROBE! RI Son
When signing and todging this application 44. Conca, sunbet = 16. Facsimile number/e-mail address:
The ti ible for ensuring the
rican poe! come The assent lod suy 2ub4y | [on suy2yte7 |
manager, any referral agency & the Chief Executive
{where applicable) will rely on this information when | 17. Postal address:
assessing and deciding the application.
{the applicant is a company - a contact person P.¢ Bo = et
must be shown, 18. Signature; 19. Date:
as 05.09
AC DA See.
Page 3
INTEGRATED PLANNING ACT 1997
Land owner's consent (if applicable}
Section 3.2.1{3} of the IPA prescribes thal an
application must contain, or be supported by, the
writien consent of the Land owner/s, if the application
involves:
@ a material change of use;
(reconfiguration of a lat,
(@)) work on land below high-water mark & not within 2
canal as defined under the Coastal Protection and
Management Act 1995;or
(¥)_ work on rail corridor land defined under the
Transport infrastracture Act 1994.
Section 3.8.1(2}{a) of the IPA provides that
landowner’s consent is not required for a mobile or
temporary ERA .
Fox more information refer to Guide 4,
Part A, Version 2.4, 23 May 2006
20. Land owner's consent to the making of this application:
Name
ti)
Resource entitlement (if appicable)
Section 3.2.1(5) of the IPA requires evidence of
resource entitlement be given for applications that
involve a prescribed State resource.
Section 3.2. 1(10}(a)(i) of the IPA prescribes that an
apptication canpot be taken to be property made
without evidence of the resource entitlement.
Advice for completing Q21 & 22
Refer to schedule 10 of the integrated Planning
Reguation 1998 that prescribes the nature of evidence
required by the State in support of the lodging of this
. Does this application involve a State resource prescribed under a regulation (other than involving
quarry material on State coastal and under the Coastal Protection and Management Act 1995)?
{ANO - goto a24 (1 YES - goto. 922
. This application is accompanied by evidence: (tick applicable box)
C1 (i) of the allocation of, or entitlement to, the resource — attach evidence and go to Q23(v)
LD fii) the chief executive of the department administering the resource is satisfied the
development is consistent with an allocation of, or entitlement to, the resource - go
to Q23
e@ development application.
C1 dil) the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or
entitlement to, the resource — go fo Q23
Autvice for completing Q23 _____ | 23. Evidence of the resource entitlement:
utes une oo aetna nes () Resource entitlement / auhont details
(vii) Official stamp of the department
fequired under Q22 (fi) oF {Iff) above. ae .
administering the resource (if
The official stamp of the Department of Natural
Resources, Mines and Water is mandatory where the _ applicable)
application involves any water or riverine quarry (ii) Name of delegated officer
‘Section 3.2.1(5A) allows the resource manager to limit
the time the evidence may be used. 023 (vi) must be iii iti
completed ifthe ev Neistime trited. (ii) Position of = officer
(iv) Signature of delegated officer
(v) Date
(vi) _ date of evidence foetal
Assessment triggers 24. Is the IDAS Assessment Checklist completed and attached to this application?
This checktist does if th lication requires ‘
the completion of act anny B of gonial ‘onty it Oo NO - the assessment manager may refuse to accept this application on the
grounds that the application has not been property made
[ves
must be completed for all other applications.
Plans / drawings / reports 25. Plans/drawings/teports accompanying this application:
support the proposat & enable the assessment
manager, referral agencies and any person viewing (i _
Poa nd Secret pemopess | dese REFER To ATTACHED DREAMING REci STB.
and any potential impact. (i)
An application shoukd be accompanies by details to Plan { Drawing / Report Number Title Date
the application during public scrutiny or public
PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1.
OFFICE USE ONLY (applicable to assessment manager's) _
[re 2525. 00 | necnen |24.5-07 | ws Vaenta Hesse | Simens | 7007/1017 _ |
Notification of Engagement of Private Certifier (Optiona! format)
To. Council. | have been engaged as the private certifier for the building work referred to in this application.
Accreditation Number, Name:
Date ofengagement { f{ Signature:
Page 4
Me ad
INTEGRATED PLANNING ACT 1997
Part E, Version 2.0, 4 October 2004
Operational &/or building work
assessable against a local government’s planning scheme
Completion of all question on Part E is mandatory for all applications involving the assessment of operational work and/or building work (including detailed
engineering plans and other plans, detailed engineering plans for subdivisional works and conceptua! design plans for engineering & building work when the application does
not involve assessment of a material change of use of premises at the same time) assessable against a local government’s planning scheme.
Nature of the application 1. This application is for (tick one (1) or both if applicable)
A development permit authorises Prelimii - provic its of
development to occur, while a preliminary Oo inary approval - provide details of the type of work eg. roadwork, stormwater, water and sewerage
infrastructure,
approval is a step in the approval process. a ture, ete
and does not authorise development to occur.
e@ The types of work that are assessable against
a planning scheme are determined by the
scheme for a particular local government and
will vary across the State.
To determine the types of work that are
assessable under a particular planning
scheme, contact the relevant local
government.
m wo
Development permit - provide details of the type of work eg. roadwork, stormwater, water and sewerage
infrastructure, etc
| Cae T> AWeewte ro Pelee.
2. Are the works subsequent to a previous development approval?
CINo [YES ~ provide details of all previous approvals (eg. file refarences)
Fue we Zoe4 / 514%,
3, _ Is the subdivision for a canal estate?
(No
(] Yes
Portable Long Service Leave levy (if |4. Is payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?
apokcabie) [aves
- 5
Prior to issuing a development permit for the complete Q
works, the assessment manager is required [] NO - a5, 6&7 do not apply
Page 5
Oe 3 INTEGRATED PLANNING ACT 1997 Part E, Version 2.0, 4 October 2004 by law to “sight” an approved form, issued ty |5. Has the PLSL levy been paid? re tesenay ames that he PLSL levy (YES - compteteas (C1 NO - the appicable levy must be paid before a development permit can be given for the works 6. How much was paid? [7.3.4. |] 7. What is the receipt number of the payment? [>. B.A, | PLEASE NOTE This application cannot be accepted unless accompanied by Part A of Form 1. The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information requested by Part A and any other relevant part of Form 4. OFFICE USE ONLY (appticabie to assessment manager) [ DATE RECEIVED | | REFERENCE NUMBERIS| (i) Is a PLSL levy applicable in this instance? Ono LD YES - complete avi e@ (ii) Has the approved form (issued by QLeave and which signifies that the PLSL levy has been paid) been sighted by the assessment manager / private certifier at the time of lodgement of this application? Ono [1 YES - provide receipt details below r
Page 6
.
”
9
INTEGRATED PLANNING
ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
IDAS Assessment
Checklist
(Formerly the “Referrals Checklist’)
Development Appli
IMPORTANT NOTE FOR ALL APPLICANTS:
1. This checklist was formerty referred to as the “Referrals Checklist”. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
“Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.
2. Under the IPA and IDAS framework, an application may require assessment by the focal Council and/or certain Queensland State entities (e.g. Environmental Protection
Agency, Dept. of Natural Resources and Water, Queensland Heritage Council etc.).
3. This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant to
determine the assessment manager" for the application,
Therefore, the completion of all questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B only).
(tis the responsibility of the applicant to accurately complete this checkist
Section 2 is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005.
Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.
The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to identify
any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers referral coordination?.
9. — Toassist you in answering the following questions a series of guides are available free from the IPA website www.ipa.qid.gov.au. Guide 25 explains the role of the IDAS
Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application.
10. Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
www. ipa.qid.gov.au.
11. Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006,
PnP
SECTION 1 - STATE ASSESSMENT (completion mandatory)
Note: The following state assessment triggers apply to development other than for building work assessable against the Building Regulation 2006.
Environmentally relevant activity 1. The application involves: (tick applicable box/es)
For mora information refer to Guide 4. C1 (i) an environmentally relevant activity (ERA) for which a code for environmental compliance
the cppteation mnie ase of me ai, has not been made - complete Part G of Form 1
administering authority’. (1 (ii) a mobile or temporary ERA for which a code of environmental compliance has not been
fan entity, other than the administering made - complete Part G of Form 1
authority, is the assessment manager for the Pi none of the above
application, the administering authority is a
concurrence agency for the application in relation
to this matter.
Note: An application involving ERA 19 and/or 20
will also require completion of Part Kr of Form 1
for approval where an allocation under the Water]
Act 2000 is required.
Continued overleaf
PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
compteted IDAS Assessment Checkiist (if applicable).
OFFICE USE ONLY (appticable to assessment managen)
DATE RECEIVED [ REFERENCE NUMBER/S |
1 The assessment manager is responsible for assessing and deciding an IDAS application. The assessment manager for an appfication is prescribed in schedule 8A of the IPA.
2. For additional information refer to Guide 6 ‘Does my application trigger the referral coordination process?"
3° The ‘administering authority’ may be either the Environmentat Protection Agency, the relevant focal government (for a devolved ERA) or tha Queensland Department of Primary Industries and
Fisheries (for a delegated ERA).
Page 1
Page 7
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 April 2007
State-controiled road matters 2. The application involves: (tick applicable boxes)
Far mora information refer to Guide 3 (1 () development on land contiguous’ to a State controlled road and for -
Uniess you answered “none of the above” to Q2, . . .
the application triggers referral to the Department C1 (a) material change of use assessable against the planning scheme;
of Main Roads (DMR) as a referal agency (CO (b) reconfiguring a lot unless -
bassdiliciaiiies saeeeilitalen ai + the total number of lots is not increased; and
be a concurrence agency. « the total number of lots abutting the State-controfled road is not increased;
Schedule 2 of the IP Requtation will assist you to . . . . .
determina where DMRis an advice or 'c) operational work (not associated witha material change of use assessable against the
concurrence agency for the application. planning scheme or reconfiguring a jot mentioned in (b) above)—
« associated with access to a State-controlled road; or
« for filling or excavation; or
« involving the redirection or intensification of site stormwater from the tand, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
( (ii) development on land not contiguous to a State-controlled road and -
C1 (a) material change of use -
assessable against the tocal government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
L (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
(1 (©) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a fot mentioned in (b) above)—
¢ assessable against the local government's planning scheme; and
¢ mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
mMiiy none of the above
Clearing vegetation 3. The application involves: (tick applicable boxes)
For more information refer to Guide 12. C1()_ material change of use -
“none of , . .
een ar ete oeecomeattyne. 3%. (a) assessable against the planning scheme;
nae ral and W (b) on a lot containing -
if an agency other than NRW is the assessment * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
manager for the application, NRW is a ; « if there is no property map of assessable vegetation for the lot - remnant vegetation;
porcurrence agency forthe appicaton in elation (c)_ where the existing use of the land is a rural or environmental use; and
If you ticked 034i) or (i), your application requires; (d)_ where the size of the land is 2 hectares or larger - compiete Part J of Form 1
feferral to NRW for assessment regardless of D(ii) reconfiguring a fot -
whether vegetation clearing is proposed of not. _.
(a) ona lot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
(b) where the size of the lot before the reconfiguration is 2 hectares or larger;
{c) where 2 or more lots are created; and
{d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
Di {iii) operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form 1
iv) none of the above.
Strategic port land 4. The application involves:
For more information refer to Guide 11.
if you ticked (i) - the relevant Port Authority is the
assessment manager for the application.
if you ticked (ii) Queensland Transport is a
concurrence agency for the application.
(1 (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
Act) - complete Part | of Form 1
O (ii) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part ! of Form 1
[M(il) none of the above
4 Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m af the State-controlied road; or that is part of a future State-
contolled road.
Page 2
Page 8
INTEGRATED PLANNING ACT 1997
Acid sulfate soils
For more information refer to Guide 10.
Untess you answered "none of the above" to 05,
the appfication requires assessment by
Department of Natural Resources and Water
(NRW).
(fan agency other than NRW is the assessment
manager for the application, NRW is an advice
agency for the application in relation to this
matter.
Major hazard facilities or possible
major hazard facilities
For more information refer to Guide 17.
If you answerad “YES” to Q6, the application
requires assessment by the Deparment of
Ememency Servioas (DES).
{f an agency other than DES is the assessment
Manager for the application, DES Is a
concurrence agency for the application in
elation to this matter.
IDAS Assessment Checklist, Version 20, 2 April 2007
The application involves development on land situated in an identified5 local goverment area
and where the surface of the land is: (tick appicable box)
(1 (i) below 20m AHDS and the development will involve the excavation of 1000m?or more of
soil or sediment at or below 5m AHD, or
( @ii) at or below 5m AHD and the development will involve filling the site with 1000m3 or more
of material
iii none of the above
Does the application involve a material change of use for a major hazard facility or possible
major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?
INO
(C1 YES - complete Part L of Form 1
Water retated development under the
Water Act 2000
For more information about items (a) - (1), refer
to Guide 15, For more information about item
(Q), refer to Guide 14 Does my application
involve assessment of a referable dam?
Unless you answered ‘none of the above" to Q7,
the application requires assessment by the
Department of Natural Resources and Water
(NRW).
if an agency other than NRW is the assessment
concurrence agency for the application in
relation to this matter,
The application involves:
[1 ()) operational work, for taking or interfering with water under the Water Act 2000, that is:
(tick applicable boxes)
CJ (a) ina watercourse, lake or spring, (eg. a pump, gravity diversion, stream re-direction, weir or
dam) - complete Part Kz, Ks, Ks, Ke, or Ko of Form 1 whichever is applicable;
(21 (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
K; of Form 1;
(O(c) for a subartesian bore, in declared subartesian area’, or in a certain area
covered by a water resource plan, for use for purposes other than stock and/or
domrestictse=comptate-Part Kr-of Formt;
Ld) for a subartesian bore, in certain declared subartesian areas, for use for stock
and/or domestic purposes - complete Part Ky of Form 1;
(1 e) for taking overland flow water in certain areas covered by a water resource plan
~ complete Part Ks of Form 1;
(J (f) for interfering with overland flow water in a drainage and embankment area -
complete Part K1o of Form 1
(1 (g) for constructing a referable dam® or works that will increase the storage capacity
of a referable dam by more than 10% - complete Part Ks of Form 1; OF
f&1(ii)_ none of the above,
Removat of quarry material from a 8.
watercourse
For more information refer to Guide 16,
If you answered “YES” to 08, the application
fequiras assessment by the Department of
Natural Resources and Water (NRW).
If an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
relation to this matter,
Note: Part G of Form 1 is required to be
completed as the activity of removing query
material from a watercourse is also an
Environmentally Relevant Activity (ERA).
Does the application involve development for the removal of quarry material from a watercourse?
requiring an allocation notice under the Water Act 2000?
[No
CI YES - complete Parts Kr and G of Form 1
5. The identified focal government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cooloola, Dounglas, Fitzroy, Gladstone, Gokd Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirum Vaie, Momington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.
Australian Height Datum (AHD).
Referable dam is defined under the Water Act 2000.
Watercourse is defined in sch 10 of the IPA.
wong
The declared ground water areas are listed In Guide 13 Develonment io a dedared catchment area,
Page 3
Page 9
INTEGRATED PLANNING ACT 1997
Operational work that is tidal work or
work In coastal management district
For more information refer to Guide 18. For
Tore information about prescribed tidal work in
local government tidal areas refer to Guide 24.
Unless you answered “none of the above” to 09,
the application requires assessment by the
Enviroamental Protection Agency (EPA).
If an agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the appfication in
relation to this matter.
Local goverment is the assessment manager
for all prescribed tidal work.
Ow
Oia)
Di)
Biv)
IDAS Assessment Checklist, Version 20, 2 April 2007
9. The application involves operational work that is: ( tick the applicable box/es)
tidal work" as defined under the Coastal! Protection and Management Act 1995 {the
Coastal Act) that is not prescribed tidal work — complete Part M of Form 1; or
tidal work that is prescribed tidal work"! other than in a canal‘? -complete Part P of Form 1;
or
carried out within a coastal management district under the Coastal Act and for - complete
Part M of Form 1 if any box/es (a) fo ()) below are ticked.
C1 (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
other than those works in tidal water) where the development has been determined not
to be assessable against the Water Act 2000 ;
constructing a canal intended to be connected to tidal waters;
constructing an artificial waterway;
reclaiming land under tidal water,
disposing of dredge spoil or other solid waste material in tidal water;
interfering with quarry material on State coastal land above high-water mark;
draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
Temoving or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
constructing a bank or bund wail to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or
none of the above.
Ob)
OD
Od)
De)
Of
O@)
C1 (h)
Ci
Operational work below high water
ark.
For more information refer to Guide 18. For
more information about prescribed tidal work in
local government tidal areas refer to Guide 24.
Unless you answered “none of the above’ to
Q10, the application triggers referral to
stan iT itime
Qid) as a concurrence agency.
Local govemment is the assessment manager
for all prescribed tidal work.
4
Cy
10. The application involves operational work that is: ( tick the applicable box/es)
tidatwork'3-aa-defined-under-the. Coastal Protection. and. Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; OF
D (ii) tidal work that is prescribed tidal work"4 - complete Part P of Form 1; Or
O (ili) carried out within a coastal management district'S under the Coastal Act and for -
Mii)
(1 (a) disposing of dredge spoil or other solid waste material in tidal water ~ complete Part
Mof Form 1;
(1 (6) teclaiming land under tidal water - compiete Part M of Form 1; oF
((c) constructing a canal, if the canal is associated with reconfiguring a lot - complete
Part M of Form 1,
none of the above.
Coastat management
For more information refer to Guide 18.
Unless you answered ‘none of the above" to
Q11, the application requires assessment by the
Environmental Protection Agency (EPA).
If an agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the application in
elation to this matter.
10 Tidal work is defined in sch 10 of the IPA.
11.
The application involves: (tick the applicable box/es)
DW
Ot
Dwi)
ow
Hw)
a material change of use assessable under a planning scheme involving operational
work carried out completely or partly in a coastal management district
a material change of use assessable under a planning scheme involving building
work, carried out completely or partly in a coastal management district that is -
« the construction of a new premises with a GFA" of at least 1000m?
« the enlargement of the GFA of existing premises by more than 1000m2
reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
reconfiguring a fot'’ assessable under schedule 8 of the IPA and in connection with
the construction of a canal ~ complete Part M of Form 1
none of the above
11 Prescribed tidal work is defined in the Coastat Protection and Management Regulation 2003 and inctudes certain tidal works completely or partly within a local goverment tidal area.
12 Canal means canal as defined under the Coastal Protection and Management Act 1995
13 Tidal work is defined in sch 10 of the IPA.
14 Prescribed tidal work is defined in the Coastal Protection and Management Reguiation 2003 and Includes certain tidal works completely or parily within a local goverment tidal area.
15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act.
16 GFAis defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is belng assessed.
17 Under s117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artifical waterway, must be
accompanied by the application for the operational works to construct the artificial waterway.
Page 4
Page 10
INTEGRATED PLANNING ACT 1997
Development within the limits of a
port
For more information refer to Guide 18. For
information about prescribed tidal work refer to
Guide 24.
If you answered “YES” to 42, the application
tnggers referral in the Port Authority.
The Port Authority is a concurrence agency if the
development is —
© within 200m of a shipping channel or an entry
and exit shipping corridor for the port
¢ within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoil
grounds;
« within 1000m of a planned port facility
identified in a land use plan approved under
the Transport Infrastructure Act 1994.
{n all other situation the Post Authority is an
advice agency.
IDAS Assessment Checkiist, Version 20, 2 Apri 2007
Does the application involve development below high water mark'® and within the limits of a port
under the Transport Infrastructure Act 1994?
[Hho
{YES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work
Marinas
For more information refer to Guide 18. For
information about whether a marina is prescribed
tidal work refer to Guide 24. The local
government is the assessment manager for all
prescribed tidal work.
if you answered “YES” to Q13, the application
triggers referral to Queensland Fire and Rescue
Service as an advice agency.
13.
Does the application involve operational work that is tidal work for a marina‘? with more than 6
vessel berths?
NO
(11 YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work
Tidal works in strategic port land tidal
areas
For more information refer to Guide 18.
Unless you answered ‘NO" to Q14, the relevant
Port Authority is the assessment manager for the
application and the Environmental Protection
Agency (EPA) and Queensland Transport (QT)
are concurrence agencies for he application.
Heritage
For further information refer to Guide 19.
lf you answered "YES" to Q15, the apptication
triggers referral to the Queensland Heritage
Council as concurrence agency for the
application.
Unless you answered ‘none of the above" to
Q15(b), the application involves referral to the
Environmental Protection Agency as an advice
agency for the application
=
15.
4,
Does the application involve tidal works within a strategic port land tidal area20?
[Yio
(YES - complete Part M of Form 1
Does the application involve development in a heritage registered place as defined under the
Queensland Heritage Act 1992?
[NO
(1 YES - complete Part C of Form 1
15(b)The application involves: (tick applicable boxes)
{i) | amaterial change of use assessable against the planning scheme and the lot shares a
common boundary with a protected area or registered place under the Queensland
Heritage Act 1992;
C1 (i) reconfiguring a lot if the lot shares a common boundary with a protected area or
registered place under the Queensland Heritage Act 1992;
C(ii) none of the above.
Declared catchment areas
For more information, including a list of the
declared catchment areas within Queensland,
refer to Guide 13,
Unless you answered “none of the above” to
Q16, the application requires assessment by the
Department of Natural Resources and Water
(NRW).
If an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
relation to this matter.
16.
The application is in an area declared to be a catchment area under the Water Act 2000 and
involves: (tick the applicable box/es)
(Qi) _ reconfiguring a fot if any jot resulting from the reconfiguration is less than 16 hectares;
Ci) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994;
none of the above
Mii)
18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
19 Marina is defined in the Transport Operations (Maritime Pollution) Regulation 1995.
20 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacenl to strategic port fand.
Page 5
Page 11
INTEGRATED PLANNING ACT 1997
{DAS Assessment Checklist, Version 20, 2 April 2007
Contaminated land 17. The application involves: (tick the appfcable box/es)
Applications involving materlal change of use (i): reconfiguring a fot for which all of part of the premises are -
ing alo igges th : . .
rer ming aint may tigger ins (a) premises mentioned in the IPA, schedule 8, part 1, table 2—
For more information refer to Guide 5. item 5, including the exemption otherwise provided for by paragraph (d);
Unless you answered “none of the above” to « item 6, including the exemption otherwise provided for by paragraph (e); or
Q17, the application requires assessment by the ei ii it i i i ini ivi
Evin onal Proven (EPA) fan item F, inccing the exemption otherwise provided for a mining activity or petroleum
agency other than EPA is the assessment activity; . . .
manager for the application, EPA will be a (0) in an area for which an area management advice has been given for unexploded
‘concurrence agency for the application in ordnance - complete Part N of Form 1
relation to this matter. . .
C1 (i) a material change of use -
{a} made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
{b) assessable against the planning scheme and if all or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1
[A(iii) none of the above
Electricity infrastructure 18. The application involves: (tick the applicable box/es)
For more information refer to schedule 2of the IP (1(i) reconfiguring a lot where any part of the lot is -
Unless answe ed ‘none of the above’ to subject to an easement in favour of a distribution entity or transmission entity under the
QI8, ihe application triggers referral to tha Electricity Act 1994 and the easement is for a transmission grid or supply network under
agency to which the easement is granted in that Act; or
favour of as advice agency. « situated within 100m of a substation site;
C1 (ii)_ a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if -
* any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a tansmission
grid or supply network under that Act; and
any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;
(CO (ii) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site;
Li (iv) operational work that is filling or excavation assessable against the planning scheme,
Not associated with reconfiguring a lot, if -
any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;
the work is located wholly or partly within 10m of a substation site;
[(v)_none of the above.
Land designated for community 19. Does the application involve development assessable against the planning scheme and on land
infrastructure
Applications invotving development on land
designated for community infrastructure may
trigger this referral.
For more information refer to schedule 2 of the
IP Requiation.
If you answered YES” to Q19, the application
requires assessment by the chief executive of
the department administering the Act authorising
the development for the designated purpose.
lf an agency other than the designator is the
assessment manager for the application, the
designating agency will be a concurrence
agency for the application in relation to this
matter.
designated for community infrastructure?
(i) intended to be supplied by a public sector entity; and
(ii) on land not owned by or on behalf of the State; and
(iii) other than development —
(a) for the designated purpose; or
'b) carried out by, or on behalf of, the designator.
NO
Clyes
Page 6
Page 12
INTEGRATED PLANNING ACT 1997,
SEQ Regional Plan
For more information refer to schedule 2 of the
IP Reauiation.
Refer to Chapter 2, parl 5A and schedule 10 of
the Integrated Planning Act 1997, and schedule
2 of the Regulatory Provisions for relevant
definitions.
Unless you answered ‘none of the above’ to
Q20, the application requires assessment by the
Office of Urban Management (OUM}.
IDAS Assessment Checkist, Version 20, 2 April 2007
20. The application involves (tick appicable box/es) -
(i) a material change of use of premises —
(a) in a Major Development Area in the Urban Footprint for -
OO @ anurban activity -
(1 inan area included in a structure plan where the IPA, section 3.1.6
applies;
(1 sinan area not included in a structure plan where -
« the IPA, section 3.1.6 applies to the application for the material change
of use; or
« the premises exceeds 10,000m2; or
« the gross floor area (GFA) on the premises will exceed 10,000m2; or
« impact assessment is required under the relevant planning scheme
DD (ii) intensive animal husbandry, or
CO (iii) residential development involving a rural residential purpose
(b) in the Regional Landscape and Rural Production Area for -
0 (i) anurban activity and not specified in section 2.4(2); or
3 (ii) residential development involving a rural residential purpose and not
specified in section 2.6(2)
(c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);
(d) in the investigation Area for —
D (i) anurban activity and not specified in section 2.10(2);
1 (ii) residential development involving a rural residential purpose and not
specified in section 2.12(2); or
OO (ii) intensive animal husbandry
(ii) reconfiguring a fot-
On land in a Major Development Area in the Urban Footprint that is:
(a) not included in a structure plan; and
(b) not specified in section 3.1(2).
Te {iii) none of the above
Fisheries matters
For more information refer to schedule 2of the IP
Unless you answered “none of the above” to
21, the application requires assessment by the
Department of Primary Industries and Fisheries
(DPI&F).
If an agency other than DPIGF is the assessment
manager for the application, OPI&F is a
concurrence agency for the application in
relation to items (i) - (iv) and an advice agency
in relation to item {v).
21. The application involves: (tick the applicable box/es)
((i)_ an assessable material change of use for aquaculture - complete Part 0; of Form 1;
Dil) assessable operational work that is the construction or raising of a waterway barrier -
complete Part O3 of Form 1;
Diiii) assessable operational work completely or partly within a declared fish habitat area-
complete Part O2 of Form 1;
C1 (iv) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;
(1) development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area;
Mi) none of the above.
Page 7
Page 13
INTEGRATED PLANNING ACT 1997
integration of land use and public
transport
For more information refer to Guide 23, schedule
8A of the 1PA, & schedule 2 of the IP Requtafion.
Unless you answered “none of the above’, the
application triggers referral to QT as a
IDAS Assessment Checklist, Version 20, 2 April 2007
22. The application involves: (tick the applicable box/es)—
C1 (ia material change of use assessable against the planning scheme for a purpose
mentioned in schedute 13C of the IP Regulation and exceeding the thresholds set by that
schedule.
‘concurrence agency. LD (ii) reconfiguring a tot—
{1 (a) _ on land that is completely or partly within a public transport corridor, and the
total number of lots increases;
LJ (>) ontand that is completely or partly within a future public transport corridor or
an airport's public safety area;
(©) __ onland that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;
(4 @) _ for a residential purpose within the 25 ANEF contour for an airport;
((e) _ for a residential purpose resulting in 100 or more allotments.
D (ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that-—
Ca) _ is completely or partly within a public transport corridor or a future public
transport corridor;
C1 (b) _ will resuit in work that encroaches into an airport's operational airspace.
my none of the above.
Railway safety and efficiency 23. The application involves: (tick the applicable box/es}—
For more information refer to Guide 23, schedule
8A of the IPA & schedule 2 of the IP Requiation.
Unless you answered “none of the above’, the
application triggers referral to QT as a
C (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedule.
concurrence agency, C1 (ii) reconfiguring a fot—
C1 (a) on land that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;
(1 (b) on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater;
C1 {c) on land that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;
(1 (4) _ on land that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;
C1 (e) ontand that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
((f) for a residential purpose resulting in 100 or more allotments.
CA (ili) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m3, on land that—
{J (a) _ is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
(J (b) is completely or partly within future railway land, or a railway tunnel easement;
LC (c) abuts rail corridor land, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary.
iv) none of the above.
Moonie to Brisbane pipeline 24. The application involves the easement for the construction or operation of the Moonie to
For more information refer to schedule 2of the IP
Regulation.
Unless you answered "none of the above’, the
application triggers referrat to the holder of
pipetine licance No 1 issued under the Petroleum
Act 1923, currently Santos QNT Pty Ltd, for
advice,
Brisbane strategic pipeline, and involves: (tick the applicable box/as)—
(1 (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement.
LD (i) reconfiguring a lot
C1 (iii) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.
am none of the above,
Page &
Page 14
INTEGRATED PLANNING ACT 1997 Koala habitat area For more information, refer to Guide 26 and schedule 2 of the JP Requlation. Unless you answered “none of the above”, the application requires referral to the Environmental Protection Agency as a concurrence agency. Wild river area For more information, refer to Guide 27 if you answered YES to Q26, you must also complete section 2 of this checklist. This wil enable you to determine if your application can proceed in a wild river area and which referral agency will assess your application against the Wild Rivers Code, or if the proposed development Is “prohibited” in a witd river area. Note: Development can be ‘prohibited’ in a wikd fiver area because the application cannot be accepled by the assessment manager. Preliminary Approval Ifyou answered YES to Q27, the application triggers referral to the Department of Local Government, Planning, Sport and Recreation as an advice agency. IDAS Assessment Checklist, Version 20, 2 April 2007 25. The application involves: (tick the applicable box/es}— LD (i) a material change of use of premises in a koala conservation area or koala sustainability area made assessable under a planning scheme, that is not for a domestic activity and will result in - (12) clearing of native vegetation over an area greater than 2500m?; (0 (b) anew building and any reasonably associated structure with a total footprint greater than 1000m2; (1 (©) anextension to an existing building and any reasonably associated structure if the extension has a total footprint greater than 1000m2, (1 (6) extracting gravel, rock or sand from an area greater than 5000m?; (1 e) excavating or filling an area greater than 5000m2; (C1 (f) additional traffic in a koala conservation area or koala sustainability area, between 6p.m. on a day and 6a.m. on the following day. (1 (ii) reconfiguring a tot in a koala conservation area or koala sustainability area that will fesult in - (a) anincreased number of lots; (1 (b) clearing of native vegetation over an area greater than 2500m2. C1 (ii) operational work in a koala conservation area or koala sustainability area made assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with reconfiguring a lot mentioned in (ii) above) that will result in the clearing of native vegetation over an area greater than 2500m2. LC (iv) operational work in a koala conservation area or koala sustainability area made assessable under a planning scheme (not associated with a material change of use mentioned in (i) or reconfiguring a lot mentioned in (ii) above) that is not for a domestic activity and will resutt in — (J (a) clearing of native vegetation over an area greater than 2500m?; (1 (b) extracting gravel, rock or sand from an area greater than 5000m?; (1 (c) excavating or filling an area greater than 5000m2, mw none of the above. 26. Does the application involve development in a wild river area declared under the Wild Rivers Act 2005? Lytio OYes 27. Does the application involve a development for which preliminary approval is sought under Section 3.1.6 of the integrated Planning Act 1997? [no (yes Wetlands Domestic activity means the construction of use of a single residence on a lot and any reasonably associated building or structure. Examples of a building or structure that could be reasonably associated with a single resitence include: caretaker's residence, granny flat, building or structure used for a home business. Note: Wetland is defined in the Integrated Planning Regulation 1998. Unless you answered “none of the above" to Q28, the application involves referral to the Environmental Protection Agency as an advice agency for the application. 28. The application involves: (tick the applicable boxes) - Ci (i) amaterial change of use, other than for a domestic activity, assessable against the planning scheme that is in or within 100m of a wetland; Di qi) reconfiguring a lot - In or within 100m of a wetland that will result in CL @) more than 10 lots being created; or LC (b) lots less than 5 hectares; iii) none of the above Page 9
Page 15
INTEGRATED PLANNING ACT 1997
Conservation Estate
Urban purposes is defined in the Integrated
Ptanning Act 1997 as “purposes for which land is
used in cities or towns, including residential,
industrial, sporting, recreation and commercial
Purposes, but not including environmental,
conservation, rural, natural or wikdemess area
purposes".
Unless you answered ‘none of the above" to
Q29, the application involves referral to the
Environmental Protection Agency as an advice
agency for the application.
IDAS Assessment Checklist, Version 20, 2 Apri 2007
29. The application involves: (éck the appicable box/es)—
(1 (i) amaterial change of use for urban purposes that is in or within 100m of any of the
following -
(1) (a) aprotected area, forest reserve, critical habitat or area of major interest under
the Nature Conservation Act 1992;;
LJ (b) a State forest or timber reserve under the Forestry Act 1959;
[1 (c) amarine park under the Marine Parks Act 2004;
(1 (a) arecreation area under the Recreation Area Management Act 1988;
LJ (e) a world heritage area listed under the World Heritage Convention;
Lf) Brisbane forest park under the Brisbane Forest Park Act 1977.
D1 ii) reconfiguring a lot if -
(a) any part of the lot is situated in, or within 100m of, any of the following -
COQ) aprotected area, forest reserve, critical habitat or area of major
interest under the Nature Conservation Act 1992;
Li(ii) a State forest or timber reserve under the Forestry Act 1959;
Odi) a marine park under the Marine Parks Act 2004;
Li (iv) a recreation area under the Recreation Area Management Act 1988;
[O(¥) __ aworld heritage area listed under the World Heritage Convention;
Brisbane forest park under the Brisbane Forest Park Act 1977; and
(11 (b) the reconfiguration involves more than 10 lots being created, or any lot
resulting from the reconfiguring is less than 5ha;
[71{iii) none of the above.
Page 10
Page 16
INTEGRATED PLANNING ACT 1997, IDAS Assessment Checklist, Version 20, 2 Apri 2007 SECTION 2 - ASSESSMENT IN A WILD RIVER AREA (completion mandatory if the proposed development is located in a wild river area) Wild River Area Itthe responsibility of the applicant to determine if the development Is proposed in a wild river area, information about wild river areas including the geographicat location and position of management areas in relation to properties, can be accessed by contacting the Department of Natural Resources and Water (NRW), accessing the department's website ww,nrw.aid.gov.au or contacting the department by email on; wild. [email protected] Note on Referrals Referrals for development in a wild river area (other than for agricultural activities and animal husbandry activities) are not changed from the existing referral arrangements. Notes on development assessable against the Wild Rivers Code For information regarding development in a wild iver area, see the relevant wild river declaration and Guide 27. The relevant wild river declaration will provide information regarding which types of development must be assessed against the Wild Rivers Coda, and in some cases which types of development are exempt from wild river requirements. The notes on development assessable against the Wild Rivers Code in this section of the checklist pravide some guidance however this may vary between wiki river areas. The relevant declaration will provide the information applying to each wild river area, Applications for some new developments wilt not be accepted if the proposed development is in a high preservation araa (HPA). Most applications for development activities which may be made including those in a preservation area (PA), must be assessed against and must comply with the Wild Rivers Code where indicated in a relevant wild river declaration, 1. Which wild river area is the development proposed in? gt /ae - The proposed development is to be located in: (tick the appfcable bowes) O i) a high preservation area (HPA); (J ii) a preservation area (PA) ; (iii) a wild river floodplain management area (FMA); (iv) a wild river nominated waterway; Oo v) a designated urban area (DUA). Environmentally relevant activities (ERAs) in a designated urban area Ifyou answered YES, your application for an ERA is exempt from any wild river requirements. and provided there are no other aspects of this development that require assessment against wild rivers, you do not need to complete the remaining questions in Section 2. If you answered NO to Q2, please complete the femaining questions in Section 2. Does the proposed development only involve any of the following environmentally relevant activities (ERAs) in a designated urban area (as mapped in the relevant wild river declaration)? i) An ERA 28 or ERA 14; or ii) A level 2 ERA except ERA 1, 2, 3, 4, 20, 22 or 59. [ANo (1) Yes (ensure you have completed Part G of Form 1) Clearing native vegetation (F YES, there are a fimited number of purposes for which an application to clear native vegetation may be accepted in a HPA. See Guide 27 for a IIst of relevant purposes for which an application may be made in a HPA. If YES and you ticked Q4 box i) the application may be made and is assessable against the Wild Rivers Coda. If YES and you ticked Q4 box ii) the application will not be accepted. Note: if clearing native vegetation is in a PA, thera are no wild river requirements and provided there are no other aspects of this development where wild river requirements. apply, do not complete the remaining questions in Section 2. Is the application operational work for clearing native vegetation in a HPA? [MNo (21 YES (ensure you have completed Part J of Form 1 ) If YES, is the clearing? [C1 i) clearing regrowth (as defined in the Vegetation Management Act 1999) in a registered area of agriculture in a HPA (see Guide 27); or ii) in a HPA outside a registered area of agriculture? Page 11
Page 17
INTEGRATED PLANNING ACT 1997 Works in tidal areas, coastal management districts and fish habitat areas If you answered YES to Q5, and ticked any boxes in Q6), your application is required to be assessed against and must compty with the Wild Rivers Code. If you answered YES to Q5 and ticked box i) in Q6, your application is requirad to be referred to the EPA. Note: if specified works are proposed in a local government area, it is prescribed tidal work — the relevant local government will be the assessment manager with the EPA as a concurrence agency ifyou answered YES to Q5, and ticked box ii) or ili) in Q6, your application requires referral to OPIF. It you answered NO to Q5 and ticked box i) in Q6, tha application will not be accepted. ifyou answered NO to O85, ticked box ii) in O6 and the development is necessary to install authorised works or infrastructure where a development pemit is not required, or if a required permit Is held, tha application must be assessed against and must comply with the Wild Rivers Code. Applications for purposes other than specified works or as described above will not be accepted. tf you answered NO at Q5 and ticked box iii) in Q6, the application may be made if the works ara ina PA, These applications must be assessed against and must comply with the Wild Rivers. Code. The application will not be accepted if the development is proposed to be located in a HPA. For more information about specified works refer to Guide 27 Residential, commercial or industrial development (f you answered YES to Q7, your application is nat subject to wild river requirements. Provided there are no other aspects of this development that require assessment against the relevant wild river declaration or Wild Rivers Code, you do not need to complete the remaining questions in Section 2. If you answered NO to Q7 and ticked either box i) or fi) In Q8, the assessing agency is the relevant local government. The application must be assessed against and must comply with the Wild Rivers Code. IDAS Assessment Checklist, Version 20, 2 Apri 2007 Is the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27- Development in a wild river area) No Clyes The application is for one or more of the following: 0 i) Operational works that is tidal works or works in a coastal management district (ensure you have compieted Part M and/or Part P of Form 1); OF QO ii) Operational works for the removal, destruction or damage of marine plants (ensure you have completed Part Oz of Form 1); OF oO iii) Building or operational works in a fish habitat area (ensure you have completed Part O2 of Form 1). ts the application for residential, commercial or industrial development in a designated urban area? L1no ves If NO, does the application for residential, commercial or industrial development involve: (_] i) a material change of use made assessable in a local goverment planning scheme (ensure you have completed Part D of Form 1); or (1 ii) operational works associated with reconfiguring a lot (ensure you have completed Part F of Form 1). Animai husbandry activities Ifyou answered YES to Q9 your apptication requires assessment against and must comply with the Wild Rivers Code. The assessing agency is NRW. Note: Applications for animal husbandry activities will not be accepted if proposed in a HPA. For more details and a definition of animat husbandry activities see the Wild Rivers Act 2005 and refer to Guide 27. Does the application involve a material change of use for animal husbandry activities (as defined under the Wild Rivers Act 2005) in a PA? [no L] YES (ensure you have completed Part R of Form 1} 1) Agricultural activities If you answered YES to Q10, your application requires assessment against and must comply with the Wild Rivers Code. The assessing agency is NRW. Nota: Applications for agricultural activities will not be accepted if proposed in a HPA. For more details and a definition of agricultural activities see the Wild Rivers Act 2005 and refer to Guide 27. The production of fodder in a PA, and pasture improvement using tow impact soil disturbance techniques Is not an agricultural activity as defined under the Wild Rivers Act 2005. For more information see Guide 27. 10. Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in aPA? [No If YES is the application for: Ol i} a material change of use; or (ii) operational works. CJ YES (ensure you have completed Part Q of Form 1) Page 12
Page 18
INTEGRATED PLANNING ACT 1997 Works that take overland flow water The relevant wild river declaration will state works that lake overland flow water are either setf assessable or assessable, or are exempt from wild fiver requirements. If you ticked Q13), your application must be assessed by NRW against the Wild Rivers Code and must comply with the code. If you ticked Q13 ii) an application is not required to be made however the works must comply with the relevant self-assessabte section of the Wiki Rivers Code, otherwise the works become assessable development for which an application: is required and must be assessed by NRW against the relevant part of the Wild Rivers Code and must comply with the code. If you ticked Q13 iii) your application is not subject to wild river requirements. Applications for development that is other than thal stated to be assessable, self-assessable or exempt will not be accepted, Works that interfere with overland flow water Tha relevant wild river declaration will state works that interfere with overland flow water that are either self assessable, assessable or exempt from wild river requirements, Ifyou ticked Q15 i), your application must be assessed by NRW against the Wild Rivers Code. and must comply with the code. If you ticked Q45 ii) an application is not required to be made however the works must comply with the retavant selFassessable section of the Wild Rivers Code, otherwise the works becoma assessable development for which an application is required and must be assessed by NRW against the retevant part of the Wild Rivers Code and must comply with the coda. If you ticked Q15 iii) your application is nat subject to wild river requirements. Apptications for development that is other than thal stated to be assessable, self-assessable or exempt will not be accepted. Waterway barrier works Applications for building or raising waterway barrier works in a HPA will nat be accepted. If you answered YES to Q16, your application must be assessed by OPIF against the Wild Rivers Code and must comply with the code. Aquaculture (non ERA) Applications for aquaculture in a HPA will not be accepted. \f you answered YES to Q17, your application must be assessed by OPIF against the Wild Rivers Code and must comply with the code. Works that interfere with water in a watercourse Note: if the development is proposed in a HPA, apptications for all works that interfere with water in a watercourse (including dams or weirs, stream realignment or stream diversion) will not be accepted. in a PA, applications for instream dams and weirs may be accepted in nominated waterways. If you ticked box ii) in Q19, your application wil not be accepted. Note: Operational works outside a HPA or nominated waterway are not subject to wild river requirements. More information and locations of nominated waterways is available by contact NRW, accessing the department's website www inw.gid.gov.au or cantacting the department by email on: wild rivers @nrw,qid.gov.au. 12. 13. 16, IDAS Assessment Checklist, Version 20, 2 Apri 2007 Does the application involve works that take overland flow water in a HPA or an FMA? [YNo [1 YES (ensure you have completed Part Ke of Form 1} If YES, is the application for works stated in the relevant wild river declaration to be? (J i) assessable works Li) sett-assessabie works (1 iii) exempt works Does the application involve works that interfere with overland flow water in a FMA? [Yno If YES, is the application for works stated in the relevant wild rivers declaration to be? (Ji) assessable works (2 ii) self-assessable works Til) exempt works 0 YES (ensure you have completed Part Kio of Form 1) Does the application involve building or raising waterway barrier works in a PA? LYNo [J YES (ensure you have completed Part Os of Form 1) Does the application involve aquaculture in a PA? ae) oO YES (ensure you have completed Part O1 of Form 1) Does the application involve operational works that interfere with water in a watercourse that is in a nominated waterway in a PA? [YNo It YES, oO i) The application is for an instream dam or weir; or (ii) The application is for operational works that interfere with water in a watercourse, and is for development other than a dam or weir. O YES (ensure you have completed the relevant Part K of Form 1) Page 13
Page 19
INTEGRATED PLANNING ACT 1997
Environmentatly retevant activities
Most applications for an ERA in a HPA will not
be accepted. Applications which may be made
fequire referral to the EPA. The assessment of
some ERAs is assessed by NRW, others have
been devolved to DPIF, NRW or delegated
local gavemment (sea EPA website for more
information on devolved ERAs}
If you answered NO to Q20 you do not need to
complete Qs 21-24.
If you answered YES to Q20 and the
development is in a PA, your application must be
assessed by the administering authority?"
against the Wild Rivers Code and must comply
with the code, unless the proposal is for
development where an application will not be
accepted, or is exempt from wild river
requirements (see Q2). You will be able to
determine if an application will not be accepted
for the develapment by answering Q21 - 024.
If you answered NO to Q21, you do not need to
complete 22. If you answered YES to Q21 you
are required to complete Q22.
If you answered NO to Q22, the application will
‘nol be accepted. If you answered YES to 022,
the application must be assessed by NRW
against the Wild Rivers Code and must comply
with the code,
If you answerad NO to Q23 and the development
is proposed in the HPA the application will not be
accepted. If you answered YES to Q23, the
application must be assessed by the EPA or
NRW (as prescribed in schedule 8A of the IPA)
against the Wild Rivers Code and must comply
with the code,
Hf you answerad YES to Q24 the application will
Not be accepted. If you answered NO to Q24,
your appfication must be assessed by NRW
against the Wild Rivers Code and must comply
with the code.
Exempt ERAs in a designated urban
area
If tha davatopment is proposed in a designated
urban area there may be no wild river
Fequirements, See Section 2 Q2.
Note: All applications that can be accepted must
be assessed against and must comply with the
Wild Rivers Code (other than exempt ERAs in a
designated urban area),
21.
23.
24.
IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve an ERA?
Titio {1 YES (ensure you have completed Part G of Form1)
Is the application for an ERA 20 instream?
[io Clves
Is a quarry allocation notice held for the proposed ERA 20 instream?
[No Doves
Does the application involve any of the following in a HPA?
i) a level 2 ERA 11, (and is for specified works or a residential complex)
ii) an ERA 19 (dredging)
iii) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in
the Wild Rivers Act 2005, and Environmental Protection Act 1994)
iv) an ERA 22 (out of stream)
[yfio C1 yes
Is the proposed development for ERA 20 (out of stream) and;
— inaFMA; and
— not low impact; and
— not for a residential complex in the area, or for specified works.
[MNO Clyes
Documentation
if you answesed NO to Q25, your application
tay be subject to an information request and
processing of the application may be detayad.
25.
Has documentation been included with the application describing how the applicant proposes to
comply with the mandatory requirements, required outcomes, and/ or performance requirements
as set out in the relevant part/s of the Wild Rivers Code?
[Jno Clyes
™ The administering authority may be either the EPA, or if devolved or delegated, the local government, DPIF or NRW.
Page 14
Page 20
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checkfist, Version 20, 2 Apri 2007
SECTION 3 -
BUILDING REFERRALS (completion not mandatory)
Below is a list of the referrals that can apply to an application for building work assessable against the Building Regulation 2006. This section of the IDAS
Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checklist is not required to be completed and lodged with an
application for building work assessable against the Building Regulation 2006 only.
Special fire services - generally 1.
For more information go to schadule 2 table 4 and
schedule 2A of the IP Requtaon.
Assessment period 15 days. No response is a
deemed refusal,
An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
tequires special fire services mentioned in schedule 2A part 1 of the integrated Planning Regulation 1998
(IP Regutation) or includes an altemative solution assessed against the performance requirements of the
Building Code of Australia.
Fire safety for budget accommodation | 2.
For mora information go to schedule 2 of the IP
Requtation
An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
the subject of the application requires the installation of a fire safety system for a budget accommodation
building.
Spray painting 3.
For more Information go to schedule 2 of the IP
Requistion
An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
if the application involves a workplace incorporating spray painting.
Retail meat premises 4.
For more information go to schedule 2 of the IP.
Regulation
An application may trigger referral to Safe Food Qld as a concurrence agency if the application involves a
retail meat premises.
Private health facilities 6.
For more information go to schedule 2 of the IP
Regutation
An application may trigger referral to the Department of Health as a concurrence agency if the application
involves a private health facility.
Workplace area tess than 2.3m" 6.
For more information go to schedule 2 of the /P
Regutation
An application may trigger referral to the Department of Industrial Relations (DIR) as an advice agency if the
application involves a work place area less that 2.3m?2.
Land contiguous to a State-controlled | 7.
road
For more information go to schedule 2 of the IP
Reavtation
An application may trigger referral to the Department of Main Roads as a concurrence agency or advice
agency if the application involves land contiguous to a State-controlled road.
Pastoral workers accommodation 8.
For more information go to schedule 2 of the IP
Regulation
An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
if the application involves pastoral workers accommodation.
Child care centre 9. An application may trigger referral to the Department of Communities as a concurrence agency if the
For more information go to schedule 2 of the {P application involves a childcare centre.
Reautation
Coastal development 10. An application may trigger referral to the Environmental Protection Agency (EPA) as a concurrence agency
For mate information go to schedule 2 of the IP if the application involves land completely or partly seaward of a coastal building line22.
11. An application may trigger referral to the Heritage Council as a concurrence agency if the application
For more information go to schedule 2 of the IP
Regulation
involves a heritage registered place.
Fisheries matters 12.
For more information go to schedule 2 ofthe 1P
Regulation
An application may trigger referral to the Department of Primary Industries and Fisheries (DPI&F) as a
concurrence agency if the application involves assessable building work in a declared fish habitat area; or
as an advice agency if the application involves assessable building work on land that adjoins a declared fish
habitat area.
Integration of land use and public 13.
transport
For more information go to schedule 2 of the IP
Recitation
An application may trigger referral to Queensland Transport as a concurrence agency if the application
involves existing or future public transport corridors, or airport operational airspace.
Raltway safety and efficiency 14.
For more information go to schedule 2 of the JP
Regulation
An application may trigger referral to Queensland Transport as a concurrence agency if the application
involves future railway tand.
NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS
The local government, as the concurrence agency, is required to assess and provide a response for the following building applications within a prescribed
time. For applications relating to design and siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is 5 days. For all
other applications the assessment period is 15 days. If no response is received from the local government for an application, it is taken to be a deemed
refusal. However for amenity and aesthetics impact of particular building work for a single detached class 1a or class 10 building or structure (15), no
tesponse is taken to be a deemed approval.
Amenity and aesthetic impact of 1. An application wilt trigger a referral to the local government if it is :
particular building work for single ¢ forasingle detached class 1 building or class 10 structure; and
detached class 1 building or class 10 the local government has declared by resolution the following:
building or structure ~ the appearance of the building or structure will have an extremely adverse impact on the amenity of
For more information go to schedule 2 table 1 of the the locality; and
IP Reaviaton. | — the appearance of the building or structure would be in extreme conflict with the character of the
Assessment period 15 days. No response is a locality.
deemed approval, .
2 Coastat building tines are prescribed under the Coastal Protection and Management Act 1995.
% Operational airspace is as defined in State Planning Policy 102 “Development in the Vicinity of Certain Airports and Aviatian Facilities".
Page 15
Page 21
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 April 2007
Whether particular buildings may be | 16. An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a
occupied for residential purposes teferral to the local goverment as the concurrence agency.
For more information go to schedule 2 table 1 of the
IP equation,
Assessment period 15 days. No response Is a
deemed refusal,
Design and siting 17. An application may trigger referral to the local government as the concurrence agency if the building work
For more information go to schedule 2 table 1 of the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.
IP Requtaton. 18. An application may trigger referral to the local government as the concurrence agency if the building work
Assessment period 5 days. No response is a does not comply with the qualitative statement for building clearance and site cover.
deemed refusal. 19. An application may trigger referral to the local government as the concurrence agency if the building work
does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
Development Code, part 11 or 12.
Fire safety in particular budget 20. An application may trigger referral to the local government as the concurrence agency to determine the
accommodation buildings building will comply with the fire safety standard under the Building Act 1975 when the building work has
For more information go to schedule 2 table 1 of the been completed.
{P Regutation.
Assessment period 15 days. No response is a
deemed refusal.
Higher risk personal appearance 21. An application may trigger referral to the local government as the concurrence agency to determine if the
services building work
For mare information go to schedule 2 table 1 of the « complies with the performance criteria of the Queensland Development code part 15; and
IP Requtation and the QOC part 15. « the work does not comply with an acceptable solution stated in the part.
Assessment period 15 days. No response is @
deemed refusall,
Building work for residential service | 22. An application for building work for premises in which residential care service under the Residential
For more information go to schedule 2 table 1 of the Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger
{P Requtation and the QDC part 20. referral to the loca! government as the concurrence agency.
Assessment period 15 days. No response is a
deemed refusal
Building work for removal or 23. An application for the removal and/or rebuilding at another site of a building or other structure, will trigger
rebuilding referral to the local government as the concurrence agency.
For more information go to schedule 2 table 1 of the
IP Regulation.
Assessment period 5 days. No response Is a
deemed refusal.
Building work for rainwater tank in 24. An application may trigger referral to the local government as the concurrence agency to determine if the
designated rainwater tank area building work or structure complies with the relevant performance criteria if -
For more information go to schedule 2 table 4 of the © Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
IP Requiation and the QOC part 25. building work, in a designated rainwater tank area; and
Assessment period 15 days. No response is a
deemed refusal,
© Under the Queensland Development Code, part 25, the rainwater tank does not include an acceptable
solution for a relevant performance criteria.
Page 16
Page 22
Noosa Shire Council Fees Payable on Operational Works Application Application Element Fees Payable Operational Works Land Use $980.00 General Excavation Works $655.00 Frontage Works $330.00 Sediment Control $110.00 Inspections $450.00 Total Fees Payable $2,525.00 18 Douglas Street Sunshine Beach 1045-4
Page 23
Shane Adamson Manager - Land Use Noosa Council PO Box 141 Tewantin QLD 4565 22nd May 2007 Dear Shane, | refer to the Decision Notice handed down by Noosa Council on the 29th of November 2006 with regard to File No: 2004/5743; being Lots 01,2 & 3 GTP 615, County of March, Parish of Weyba. Please find in bald font below, representations written in response to, and with the intention of, satisfying the conditions contained within the Decision Notice. Land, 1 si Development undertaken in accordance with this approval must generally comply with the approved plans of development The approved plans are titled and numbered Site/Roof Plan Owg No. 61.04.01B, MCU Plans Dwg No. 61.04.028, MCU Plans (2) Dwg No. 61.04.03A, MCU Sections Dwg No. 61.04.05A, MCU Elevations Dwg No. 61.04.06A prepared by Will Franklin Design and dated August 2006 and as may be amended by these conditions. No requirement for response from any discipline Prior to receiving Operational Works approval, amended plans shall be submitted to Council illustrating access arrangements to the north eastern dwelling unit. In this regard, the front (Douglas Street) stairs of the north eastern dwelling unit which provide access to Level 2 of the building shall be deleted. Access shail be provided to Level | of the building. At this stage, it appears that the Town Planner assessing the building has misunderstood the location of the stair to be within the front 6 metre setback (no build zone). However we will present the stair design for comment as well as a note explaining that each building on either side has stairs to muitipie levels at the front fagade. Martoo Town Planning Consulting comments that there is no planning requirement under the Superseding Scheme that suggests that stairs cannot exit from an upper level to ground plane. The development must be undertaken and operated in a manner that causes no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other emissions. A response simply will note that..."The development and associated procurement and operation of use will have no detrimental effect upon the amenity of the neighbourhood". A Community / Body Corp. Management Plan should refiect this intent. The open space and setback areas are to be landscaped in accordance with Council's Policy on Landscaping Guidelines and a properly prepared landscape plan prepared by a suitably qualified Landscape Architect or Horticulturalist. Such landscaping is to be completed prior to the premises being occupied and maintained at all times thereafter. The submitted landscaping plan shall detail the following:- the retainment of mature meialeucas, eucalyptus, bloodwood, bluegum and two casuarinas in the road reserve and in close proximity to the site’s front (Douglas Street) and side boundaries; the provision of dense screening vegetation along the side (eastern and western} property boundaries of the site in order to screen the basement wails, and entry areas as illustrated on Level ! floor plans and provide privacy screening to adjoining properties. architecture « interiors * sustainablebuildingdesign « planningdevelopmentstrategies willfranklindesign « 5 tmarystreetnoosavilleqid4566 » p.o.box1354noosaheadsqid4s67 teto754743237 » faxo75474 1020 ¢ [email protected]
Page 24
w
the provision of dense screening vegetation along the Douglas Lane property boundary
and setback area to screen the swimming pool, basement walls and any fencing.
the provision of dense screening vegetation along the Douglas Street property boundary
and setback area. particularly between the swimming pool and front property boundary to
screen the swimming poo! from the sweet Landscaping shail enhance the amenity of the
streetscape.
Please refer to the landscaping consultant's documentation & revised & developed
architectural documentation submitted as the Operational Works application for further
assessment. In general, the specific intents of this condition can be met.
Existing ees on the site and within road reserves are to be retained, except where required to be
removed due to building operations or the conduct of the approved use.
Apart from necessary infrastructural upgrades carried out within the footpath / road
reserve, only the driveway installation will affect the ability to retain this region of
vegetation.
All fencing shall be setback at least 1 rnetre from the front property boundary (Douglas Street), with at
least half of the fencing setback 2 metres. The area of land between the fence and the front property
boundary shall be densely landscaped to screen any fencing from the street
Please refer to the landscaping Architect's documentation & revised & developed
Architectural documentation submitted as the Operational Works application for further
assessment. In general, the specific intents of this condition can be met.
The swimming poo! located in the north western corner of the site shail not project greater than |
metre above natural ground level.
Acknowledgement of condition that the pool cannot be any greater than Im above
natural ground, however, clearer interpretation is required. To explain further, please
consider the following description:
The site slopes gently away from the front boundary. 6 metres back and up 1 metre will
dictate the pool height. This new pool level translates now to be 700m lower than the
approved level 1 RL. This new pool level is 1.9 metres lower than the design provided in
the original documentation related to this Decision Notice.
This pool! level, when considered back towards the front boundary, wil! become
increasingly tess than 1 metre above the natural ground. The pool finishes against a front
wall that is set back 1.0 metres from the front boundary, with landscaping between the
wail and boundary to comply with Condition 4 (and its parts), and Condition 6. The pool
will extend towards the building behind the 6 metre setback line for a distance of 3.5
metres and as a result, the pool {and its balcony end adjoining the main building}
transtates to being greater than 1 metre above ground level. To the best of our
understanding, this construction height is permissible, however, this portion behind the 6
m setback will now constitute site cover area of which we have sufficient unused to still fall
within the permissible total
Operational Works documentation reflects this scenario.
Any deck or balcony areas are not be enclosed with shutters. glass panelling or the like, thus remaining
as open structures.
Acknowledgement of this condition is noted. All balconies or deck areas that are not
enclosed will remain as open structures. Developed documentation submitted for
Operational Works approval will reflect this condition in detail.
Ail hot water systems installed shalt be either solar systems; electric heat pump systems; or gas systems
(LPG or natural}.
Seeking advise from hydraulic engineer and owners for clarification of hot water system
intentions.
architecture « interiors ¢ sustainablebuildingdesign « planningdeveiopmentstrategies
willfranklindesign « s 1marystreetnoosavilleqid4566 « p.o.box1354noosaheadsqid4567
telo754743237 * fax0754741020 * [email protected]
Page 25
The development shall not exceed a maximum height of 3 storeys and i2 metres above natural and finished ground tevel. Acknowledgement is made of this condition. The development shall not exceed a maximum of 3 storeys and 12 metres above naturai & finished ground level. However, a Changes Application will be lodged to pursue the raising of the basement level. Reasons for and explanation of the desired outcome will be more clearly identified in the application but in principle the other existing floor levels, tota! building height & mass of building above ground fevel will not be changed The natural ground level is to be reinstated around the building. No filling and/or mounding is permitted, particularly in front (Douglas Steet} of the north eastern dwelling unit. More clear definition and expianation will be required from N.S.C. Generally there will be no filling around the building however considering the judgement for the pool landscape feature being permitted to be up to 1 metre above ground, it is expected that this should apply to landscape terracing. More clear intention will be outlined in the Operational Works documentation (Architectural & Landscaping disciplines primarily}. The proposed development shail have all kitchen. laundry and bathroom fittings that comply with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water Efficient Products - Rating and Labelling 2003} and AS/NZS 3500 (National Plumbing and Drainage Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating System. Ali tap ware and shower roses shall not exceed a maxirnum flow of 9 litres per min. Dishwashers and washing machines are exciuded from this requirernent Acknowledgement is noted of this condition. Further documentation from the Hydraulic Engineer at Private Certification Application will reflect these details. A verification survey of the building is to be carried out by a Licensed Surveyor and a certificate lodged with Council during construction and upon completion of work confirming compliance with the maximum allowable building height as required by either the conditions of approval or the Planning Scheme. Acknowiedgement is made of this condition. The building contractor will be informed of this and it will become their responsibility to provide this at the predetermined stages of construction. Security in the form of a cash bond or trading bank guarantee to the sum of $15,000 must be submitted, to secure performance of ali conditions of this approval, prior to the issue of a Development Permit for operational works. The cash bond or wading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Acknowledgement is noted of this condition. Building owner to advise. The requirements of this development approval are to be effected, prior to the use of the premises. Council reserves the right to call upon the bond or guaranteed sum referred to in this approval to effect compliance with conditions. Acknowledgement is noted of this condition. Building owner and building contractor to be advised The Development Permit for a material change of use of premises lapses if the use has not happened by 29 November 2010. unless an application to extend the currency is approved by Council. Acknowledgement is noted of this condition. The developer must obtain ali of the other Development Permits referred to in the Decision Notice, prior to obtaining a Development Permit for Building Works. Acknowledgement is noted of this condition. architecture «interiors * sustainablebuildingdesign planningdevelopmentstrategies willfranklindesign « 5 1marystreetnoosavilleqid4566 « p.o.box1354noosaheadsqid4567 telo754743237 * fax0754741020 ° [email protected]
Page 26
Land Development
Lot Amaigamation
18,
All separate, adjoining Jots that form part of this application shail be amalgamated into one undivided
fot in accordance with Section 3.7.3 of the integrated Planning Act and the Plan of Survey submitted for
registration at the Land Tities Office. Proof of title being issued for the amatgarnated {ot shall be
submitted to Council prior to the issue of the Development Permit for Operational Works.
Client is currently pursuing both Town Planning & legal advice to carry out the best
procedure for satisfying this outcome. A survey of the compiled pian is exempt from the
development approval.
Architect currently requests reply from Town Planning Consultant for clarification of
Procedure for owner. Initially suggest to be made aware of aiternatives to allow for
maximum head works Credits.
Vehicle Access
19, A vehicular access driveway to serve the development shall be constructed with a maximum width of
20.
2i.
ar
22.
23.
24
3.0m from the existing kerb and channel in Douglas Street to the front property boundary and then
widen within the site to the full width of the entrance to the car parking area.
The private certifier has been advised to present a case for modification to this condition
dependent on a Queensland Fire Services authority recommendation regarding access to
fire hydrant facilities. The Operational Works Application will reflect the preferred design
intent.
The driveway shall be designed and constructed to Council's design standards and to grades that
prevent vehicles from scraping and/or bottoming whilst aiso allowing pedestrians movernents along
the footpath without any level difference. Should any driveways be constructed to grades that do not
comply with AS/NZS 2890.i-2004, Council will require that the driveway be removed and
reconstructed to levels that do comply.
Please note, a step between the driveway and the footpath shail be avoided, as it is preferred to have
the footpath continue at a constant grade to minimise the potential for pedestrians to wip or fall
The Operational Works application wiil reflect compliance to all driveway / footpath /
cross-over requirements. Civil Engineer to advise.
All vehicles shall enter and leave the site in a forward direction.
Acknowledgement is noted of this condition.
rkin
Carparking shail be provided within the site generally as shown on drawing number 61.04.02B dated 8
August 2006 by Will Franklin Design, except as modified herein.
Does not require comment.
A minimum of 3 covered Car park spaces shall be provided on site, including | clearly defined visitor car
Park spaces.
A Changes Application will present a request for an additional visitor parking bay. If
unsuccessful, the current approved arrangement will be detailed by the Civil Engineer as
part of the Operational Works documentation.
The car parking area shail be designed to comply with the provisions of AS/NZS 2890.1-2004 for user
class 1A with allowance for vehicles to enter and ieave the site in a forward gear and with a minimum
head clearance (headroom) at any point of 2.2m. In this regard the proposed internal wall layout of the
basement shail be modified such that
i, the double carspaces shall have an overall width of 5.4m in accordance with 2.4, 1 {D}(ii) of AS/NZS
2890. 1-2004 and
architecture « interiors ¢ sustainablebuildingdesign + planningdevelopmentstrategies
willfranklindesign « 5 :marystreetnoosavilleqid4566 ¢ p.o.box1354noosaheadsqid4567
te!0754743237 » fax0754741020 ¢ [email protected]
Page 27
25. 26. Fri 29. 30. 31. 32. ii. the single carspaces shall have clearance to all walis and obstructions in accordance with figure 5.2 of AS/NZS 2890. |-2004 and li, The access aisle shall have a minimum width of 5.8m. Current documentation as part of this decision notice shows this detailed on drawing 61.04.07. Clearer Civil Engineering documentation in the Operational Works Application will show this detailing. The proposed turning area at the end of the aisle that serves the proposed double carspaces shall be line-marked with chevrons and have the words “No Parking” painted on the pavement A sign shall also be provided to indicate that the area is a Turning Area Only” and that “No Parking is Permitted”. Clearer Civil Engineering documentation in the Operational Works Application will show this detailing. At least one car space as shown on drawing number 61.04.02B dated 8 August 2006 by Will Franklin Design shall be dedicated as a visitor car space and shall be signposted “visitor parking” and shall have similar wording painted onto the pavement to prevent misuse of this space. Clearer Civil Engineering documentation in the Operational Works Application will show this detailing. To ensure that visitors to the site are aware of the on-site visitor parking facilities (within the basement), a small sign shail be erected on the front property boundary, adjacent to the driveway, to advise visitors to park on-site in the designated visitor car park space. This condition will be satisfied if the Changes Application for additional visitor car parking is unsuccessful. All carparking shall be kept, maintained and line-marked in a condition fit for use. Clearer Civil Engineering documentation in the Operational Works Application will show this detailing. yr Footpath improvements such as topsoiling, grassing, and tree pianting are required to the Douglas Street frontage of the site in accordance with Planning Scheme Policy PSPO3 Landscaping Plants & Guidelines. Grass shall be couch, free of weeds. Clearer Civil Engineering documentation in the Operational Works Application will show this detailing. A new 1.5m wide concrete path shall be constructed along the Douglas Street frontage of the site in accordance with Council's design standards and to an alignment that protects any significant vegetation or any underground services. This condition will be addressed in detail within. All paths shall be designed and constructed to ensure pedestrian safety using nor-slip materials, to produce an evenly graded surface finish, and to be in accordance with the Disability Discrimination Act 1992 and Australian Standard 1428.1 Design for Access & Mobility. The Civil Engineer and Landscape Architects documentation will show compliance with this condition. All redundant vehicular crossings to the site shail be removed and replaced by kerb & channel, footpath paving and landscaping such as trees and grasses in accordance with Council's Standard specifications prior to commencement of the use permitted by this permit Response as part of the Operational Works Application. architecture ¢ interiors * sustainablebuiidingdesign ¢ planningdevelopmentstrategies willfranklindesign « 5 1marystreetnoosavilleqid4566 * p.o.box1354noosaheadsqld4567 telo754743237 » fax0754741020 ° [email protected]
Page 28
tormwater Drain.
33.
34.
35.
All stormwater drainage shall be collected on site and discharged so there is no net increase in
stormwater runoff from the site. Stormwater drainage permitted to drain from the site shail be
discharged to Council's existing drainage structures in Douglas Lane. Plans of the drainage design shail
be prepared by a Registered Professional Civil Engineer and submitted to Council prior to obtaining a
Development Permit for Operational Works.
The maximum discharge of stormwater drainage allowabie to Council's kerb & channel street drainage
system at any one iocation is 25 litres/second.
* see note below
Roof runoff from any new dwelling shal! be directed to a rainwater storage system or tank (minimum
storage 3000 litres per dwelling/unit} that is installed to ensure water from the tank can be used for
external uses (such as watering gardens, irrigation, ornamental ponds, water features, topping-up
swimming pools, outdoor cleaning, etc} and for use in flushing of toilets internal to the dwelling/unit.
All rainwater tanks are to be designed and installed in accordance with the Queensland Development
Code {QDC), Part 25 - Rainwater Tanks, and shall be part of the plumbing application in conjunction
with the building approval. The focation and capacity of the tanks shail be clearly shown on the plans
submitted for Building Works approval and any overflow shall be directed to the stormwater drainage
system.
* see note below
To ensure that polluted rur-off does not enter Council’s stormwater drainage system, stormwater run-
off from the carparking areas and the driveways shail have the first flush {the first 12 mm of rainfall or
hose-down] collected in a grease/oil arrestor provided on site prior to being permitted to discharge into
Council's drainage system.
All other clean stormwater, such as roof water, can be collected on site and discharged through a
single underground drain line directly into the existing drainage system, bypassing the grease/oil
arrestor.
To this end, a detailed maintenance plan shal! be prepared for the proposed grease/oil arrestors, which
shall be submitted to the Council for approval prior to obtaining a Development Permit for Operational
Works,
The approved maintenance plan shail be incorporated in the Community Management Scheme for the
development and a copy of this shall be provided for Council's records prior to commencement of the
approved Use. A Development Permit for Building Works shall pot be granted until a Development
Permit for Operational Works has been issued in regard to the drainage scheme
*33/ 34/35;
Acknowledge these conditions & confirmation in the Hydraulic Documentation will reflect
the following, maximum discharge to kerb at any one point will be directed to storage
system with a minimum capacity of 3000L per dwelling. Refer to Operational Works
documentation for location. It is confirmed that this rainwater storage will be used for
watering gardens/irrigation, ornamental ponds, water features, topping up of pools and
for the fiushing of toilets throughout the dwellings. The overflow will discharge separately
to Council kerb and Channel Street drainage system. The Hydraulic Engineering design will
show the run off from the car parking and driveway wili be collected in a grease / oi!
arrestor provided in the basement prior to being permitted to discharge into the Council
drainage system. This system and ali associated stormwater drainage systems shall be by
means of a gravity system. We advise that baiconies will drain to the edge and over,
however the roof terraces of level 3 to unit 1 and 2, and the main Douglas Street side living
baiconies of level 2 to unit 1 and 2 will be collected through floor wastes and directed to
the iniet side of the previously described basement grease / oil arrestor. A detailed
Maintenance program shall be prepared as part of the application for obtaining
Developments Permit for Operational Works. Accordingly this approved Maintenance Plan
shall be attached and incorporated in the Community Management ? and made
available to Council for record prior to commitment of the approved use. .
architecture « interiors « sustainablebuildingdesign » planningdevelopmentstrategies
willfranklindesign « 5 1marystreetnoosavilleqid4s66 « p.o.box 1354noosaheadsqid4567
telo754743237 * fax0754741020 ° [email protected]
Page 29
36.
All site stormwater drainage shall be by means of a gravity system.
Acknowledgement to this condition is made.
Sewer Mains
37. The site shall be connected to Council's existing sewerage reticulation systems and be constructed in
accordance with Council's standards and requirements at no cost to Council.
Acknowledgement to this condition is made. No further comment is required at this stage.
Town Water Supply
38. The site shall be connected to Council's existing town water supply and be constructed in accordance
39.
40.
41.
@ =.
42.
43.
with Council's standards and requirements at no cost to Council.
Acknowledgement to this condition is made. No further comment is required at this stage.
Each individual water connection to the water reticulation system shall extend to the property
boundary and be metered. All fees for the supply of water meters shail be paid to the Council.
Acknowledgement to this condition is made. No further comment is required at this stage.
For Multiple Uses (inchuding Building Format Plans, Group Title Plans, etc) the development shail either
be served by:
a single Body Corporate water meter to measure the combined/shared Body Corporate
and individual Use flows {including fire hose reels, but excluding fire hydrants and fire
sprinkler systems}, or
multiple water meters to separately measure Body Corporate (if any) and individual Use
flows (including fire hose reels, but excluding fire hydrants and fire sprinkler systerns).
Advice will be sought from the owners. The Hydraulic Engineer documentation shall
reflect the desired intent.
All water meters must be located outside the property boundary and in an easily assessable location to
facilitate unhindered reading by Council and/or Council’s contracted water meter readers, and not
behind fences or locked gates. !n this regard approval of the water meter configuration and location
must be obtained from Council's Water & Sewerage Capital Works Manager prior to lodgement and
approval of hydraulic drawings.
Advise will be sort from the owners. The Hydraulic Engineer documentation shall refiect
the desired intent. The location of water meters will clearly be located on all relevant
documentation.
rks
Earthworks and construction works carried out on site shall not affect the structural integrity of any of
the existing fences or structures or fands that border the development site. Fences that are affected
shail be replaced prior to the Building Certifier issuing the Certificate of Classification. In this regard any
fences to be replaced shall be clearly shown on the plans submitted for Operational Works approval.
- To finish - maybe relevant to new drawing.
The use of vibrating installation techniques for sheet piling and any other vibration causing construction
techniques for excavating, earthnoving, demolition or compaction, including vibrating rollers, is not
permitted.
See note from Consultants meeting.
architecture ¢ interiors * sustainablebutidingdesign « planningdevelopmentstrategies
willfranklindesign ° 5 imarystreetnoosavilileqid4566 « p.o.box1354noosaheadsqid4s67
telo754743237 * fax0754741020 * [email protected]
Page 30
44.
A Geotechnical Engineer or similar qualified expert shail assess the soil condition on site, determine the
soil classification, establish whether any measures are required to protect the stability of adjoining
buildings and/or structures and/or tand, and make recommendations on the type of foundation
system(s} best suited for the proposed development. The recommendations of this report shail be
incorporated into the design and construction of the proposed development
AR - GeoTech required now - Suggest instruction to Sean.
Erosion an: iment Control
45.
Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site
control measures such as silt fencing, controlled grave! access to the site and controlled disposal of
waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to be
submitted to the Council for approval prior to obtaining a Development Permit for Operational Works.
General
46.
47.
48.
49.
50.
5}.
52.
A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
specifications for all engineering works that will become Council infrastructure, which shall be submitted
in Conjunction with an application for a Development Permit for Operational Works. in this regard a
DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in
conjunction with any application for Operational Works.
Digital detailed design drawings and calculations shall be submitted with any application for a
Development Permit for Operational Works in respect of roadworks and stormwater drainage works.
The design shall be in accordance with Council's Planning Scheme Policy PSPOS - Engineering Design
Standards - Roads, Drainage and Earthworks, To avoid conflict with underground pipes or services, all
existing and proposed services required by the development shall be shown an the plans.
To facilitate production of As Constructed drawings it is suggested that all design drawings are
submitted in the Asset Design and As Constructed {ADAC) digital format. (Guidelines on the use of
ADAC are available at www.adac.com.au}.
Any damage caused to any public utility during the course of construction shall be repaired to Council's
standards and at no cost to Council.
Any alteration of any public utility or other facilities necessitated by the development of the land or
associated construction works external to the site shall be at no cost to Council.
The transportation of ail materials to and frorn the site shall be undertaken in a manner such that no
particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall
be covered to prevent materials including dust being windblown from the vehicle.
As Constructed drawings and data shail be certified by a qualified experienced Civil Engineer for design
intent and a Licensed Surveyor shall certify the cadastre and the location, level and type of all services
and structures. All of which shail be submitted to Council for checking and for Council's records.
The data must fully detail levels for all engineering works including but not limited to drainage
structures, finished ground levels and pavement surface levels. The data shall be submitted in the Asset
Design and As Constructed (ADAC] digital format. (Guidelines on the use of ADAC are available at
www.adac.com.au)
Approval of works shail not be granted until ail As Constructed information has been supplied and
accepted by Council.
architecture « intertors ¢ sustamablebuildingdesign + planningdevelopmentstrategies
willfranklindesign ¢ 5 1marystreetnoosavilleqid4566 * p.o.box1354noosaheadsqid4s67
tel0754743237 ¢ fax0754741020 ¢ [email protected]
Page 31
Environmental Health
53.
54.
A Waste Management Plan shall be submitted prior to demolition, removal or relocation of the existing
building on- site.
A Waste Management Plan is also required for construction of any building that requires development
approval.
Waste Management Plans are required to be submitted in accordance with Planning Scheme Policy 1,
see table below.
Waste storage areas are to provide for adequate separation of ail reusable, recyclable and waste
materials. These shail be located so that they are convenient and safe to use. (Waste Management
Code)
The Plan shall contain the following information:
e The site area for the storage and separation of waste is to be shown on the plan drawings
accompanying the application.
. A waste management table as indicated below is to be cornpteted showing how waste material
is to be segregated - recycled - reused or disposed.
MATERIALS ON-SITE DESTINATION
Re-use and Recycling [ Disposal
Expected waste | Estirnate On-site Off-site *specify contractor
materials volume *specify re-use or | *specify contractor | and landfill site
(m3) recycling methods _|_and end user
Excavation material
Green waste
Bricks
Concrete
Timber-please
specify
Plasterboard
Metals -
specify
please
Asbestos
below}
(see
Other -
specify
please
Note: If a demolition contractor is undertaking works, then the Waste Management table is to be
completed by the demolition contractor.
The purpose of the Waste Management Pian is to facilitate the segregation of waste for the effective
reuse and recycling of such materials. Additionally Council rewards those who segregate waste by
significantly reducing disposal fees at the landfill, some items are free. Higher gate fees are charged for
loads of mixed waste.
Noise emission from swimming pool and spa equipment {including heating equipment) shall comply
with the following requirements.
The equipment shall be installed and located in a manner that prevents excessive noise in
accordance with Council's Local Law No, 12 - Control of Nuisances. Infringement Notices
{onthe-spot fines} may apply for offences.
A person must not use equipment on any day if it makes or causes Noise to be made -
From !0pm to 7am: Which is audible outside the most exposed part of an
affected building
From 7am to 7pm: More than the lower of either -
- 50 dBiA}
- 5 dB{A) above the background noise level
From 7pm to |Qpm: More than 3 dB(A) above the background noise fevel.
architecture » interiors * sustainablebuiidingdesign * planningdevelopmentstrategies
willfranklindesign ¢ 5 1marystreetnoosavilleqid4s66 * p.o.box1354noosaheadsqid4s67
telo754743237 * faxo754741020 « [email protected]
Page 32
55. Noise emission from mechanical equipment {air conditioners, refrigeration equipment or pool pumps
etc) shall comply with the following requirements:
The equipment shall be installed and located in a manner that prevents excessive noise in
accordance with Council's Local Law No. 12 - Control of Nuisances. Infringernent Notices
(on-the-spot fines} may apply for offences.
A person must not use equipment on any day if it makes or causes noise to be made -
From tOpm to 7am: More than the tower of either —
. 40 BIA)
. 3 BIA) above the background noise level
From 7am to 7pm: More than the lower of either -
e 50 dBA)
5 GBIA] above the background noise level
From 7pm to 10pm: More than 3 dB(A) above the background noise level.
Submission of written certification from a suitably qualified person confirming that the noise levels
comply when measured at either the residential boundary or outside the most exposed part of an
affected building, whichever is the closest to the equipment. This is required immediately after
installation of the equipment and prior to any occupation of the building, and in a format approved
by Council This assessment must take into account noise from any other fixed equiprnent on the
property €.g. swimming poo! pump, heating equipment that may increase the overall noise ieve!
emitted.
56. Noise from building works associated with residential development shail comply with the foliawing -
Limited to between 7:00am to 6:30pm Monday to Saturday.
Ail reasonable measures are taken to minimise noise emissions.
Not permitted on Sunday or public holidays.
Kind Regards,
Will Franklin
architecture » interiors * sustainablebuildingdesign ¢ pianningdevelopmentstrategies
wilifranklindesign « 5 1marystreetnoosavilleqid4566 * p.o.box1354noosaheadsqid4s67
telo7S4743237 ¢ fax0754741020 © [email protected]
Page 33
Site Control —
Site control measures are to be followed to prevent erosion and sediment
export from leaving the site. A plan detailing the methods of control may be
required by council.
Noise emission from mechanical equipments shall comply with the local
council's Local Law No. 12 \
In the instance of demolition, a waste management plan may be required by
council.
During the course of construction, property boundary fences are to be
maintained and replaced if necessary.
Energy Efficiency Requirements
50mm Anticon insulation to be installed below roofing.
R2.5 Polywoo! ceiling insulation batts to be installed in roof space.
Vapour permeable RFL to all exterior framed walls.
R15 wall batts fo all exterior framed walls.
All external doors & windows to be fitted with a seal to resrict air infiltration
and where glazed fo be fitted with Pilkington Evergreen’ glass.
All exhaust fans to conditioned spaces to be fitted with a self closing damper.
|
|
site drainage incl. basement (RL 33385)
is gravity fed to douglas lane (RL 32.37)
Hot water system shall be fitted with a heat trap within 1m of the outlet of the
heater and before the first branch.
douglas lane ]
eee Stormwater, Sewer and Water Supply
Roof & surface stormwater to be disposed of in accordance with council
requirements.
The site shall be connected to coucil's existing sewerage reticulating systems
and constructed in accordance with council standards & requirements.
The site shall be connected to council's existing town water supply and
constructed rainwater tanks are to be provided as per council requirements.
existing timber fencing
to be retained
lane to be retained
| | single access to douglas
\
|
|
boundary line 22.630m General Notes
The builder shall check and verify all dimensions and verify all errors and
omissions to the Architect
Do not scale these drawings,
Drawings shall not be used for construction purposes until issued by the
Architect for construction.
existing swiming pool
to be retained
Refer fo Engineering documentation for structural identification.
Refer to Hydraulic Engineer for plumbing design and layout.
Driveway cross-over and layback fo be constructed in accordance with local
cover 43.896
line 32.13)7™m
|
|
i
; areecering See Council regulations and design requirements.
| ne Refer fo Window and Door Schedule.
Smoke detectors to be installed in accordance with BCA regulations.
t Waterproofing through-out to be applied as per manufacturers specification.
Trusses to be installed as per manufacturers specification.
Termite protection to be carried out in accordance with Australian Standards,
j
i
and B.C.A. requirements. |
t
t
!
i
t
boundary line 32.18/7™m
Bao
I
lessee All Windows & Doors to comply with relevant BCA regulations & Australian }
Jed Standards,
Lee Balustrading installation and constructionto comply with BCA regulations and
relevant Australian Standards,
{ Pool fencing and gate construction and ressucitation signs to be installed to
jraed comply with BCA regulations and relevant Australian Standards,
rainwater tank locations
3000 litre capa
eee aise | Termite Protection
refer to hydraulics engineers i i
documents ied The building shall be protected from subterranean termites by approved | hee
physical and/or chemical barriers in accordance with AS3660.1. The precise
method of protection shall be determined by the owners and/or builder only
after consultation with a licensed pest control operator. This information then
shall be advised to the local government or licensed certifier prior to or at the
| time of lodgement of the building permit approval. |
ensure that any physical barriers are kept clear |
of garden beds or soil build up, that any chemical barriers remain undisturbed,
and that annual inspections (plus eradication as necessary) are carried out
i throughout the life of the building by a licenced pest control operator in
ay accordance with AS3660.1.
proposed locations of existing
poo! filtration system
all vehicles to leave site |
na forward motion i
refer to civil eng, documents
for turning circle compliance
scr |
Peouiiaac|
proposed location of air condition units.
refer to mechanical engineers documents
| |
Pt eel
bs Li NS ra
| eee
Bl dap pie na
carparking shall comply with all
australian standards, Refer to civil eng.
documents for detailing.
grated trench drains
refer to hydraulic engineers documents.
~ aluminium louvred screen- —
ia a
1
7
i
stair access to ground to rear of
stair access to ground to pool property
proposed location unit 1
swiming pool filtration system
retaining walls
to engineers specification
A 20-05-07 Commencment of issue |
landscaping to landscape
architects details
driveway to be constructed in accordance new stair to unit 2
to council design standards and all relevant
australian standards. Refer to civil eng.
documentation for detailing.
landscaping to landscape
architects details
2000m high wall
2000m high wall
boundary line 22.630m |
connection to town water
proposed location of water metres
refer to hydraulic engineers
documentation
footpath & landscaping detail to
landscape architects detail
retain existing
allredundant crossovers to be
removed and replaced with
new kerb and channel In
accordance with council standards
Will Franklin
[email protected]
Documentation
David Watson i
Eas [email protected]
Job No Drawing No.
JJ.61.04 61.04.30 A
Page 34
drawingregister
project sunview Duplex
location 18 Douglas Siree. Sunshine Beach date of issue
client Dynamic Cafes Pry Lid day 21 $23 425 425 {25 |25
job 4361 04 month |5 {5
page 3 of 3 year 7 47 17 «47 «Y7 47
distribution att: email address no. of copies
Private Certifiers Luke fones onestnoory sid. gow: 441
Engineering Consultant Sean Sharp
Electrical Consuttants Robert Graham
Landscaping Consultants Rob Burrelt !
[Alan Sinclair & Associates Alan Robertson
Mechancial Consultants Rick Hoyte LOR TONE SID AG
Hydraulics Consultant tan Bradtord [email protected] 1 ]t
Noosa Council © lop. wrs rF fF 44 "oP oF roy
Noosa Council Changes App. 6
Noosa Council [Dematitron App. 4
@ doc (type) reason sent (by} comment {refer to codes on left}
}O- orginal p> pretininary h- hand document (type} ad lad |p |p Ip |p
P- paper a- approval IC COURCE reason i 1 ja fa fa fa
r- reduced print tt -informator: im - man sent (by) e le |h " ho th dh
C-compact disc ft - tender le - email from (initials) JAWIWE | WF | WE IWF LW
f- pdf ¢- construction P- picked up
d-awg F-revision f= fax
t- pit ba building app notes
drawing title doc. no. size amendment no.
MCU Site / Roof Pian 61.04.01
MCU Plan 61.04.02
MCU Plan (2 61.04.03
GFA 61.04.04
MCU Sections 61.04.05
MCU Elevations / Sections 61,04.08
MCU Elevations 61.04.06
Car maneurering & parkin 61.04.07
Constructions area - Basement / Level 1 61.04.09
Constructions area - Level 2 / Level 3 61.04.10
Site / Roof Pian & Level 1 Plan (ui &u2 61.04.11
Level 2 Plan (ui & U2 61.04.12
Level 3 Plan (ui &u. 61.04.13
Level 4 Plan (ui &u: 61.04.14
Sections 61.04.15
Sections / Elevations 61.04.16
Elevations 61.04.17
Chai lication - PlanA (ui & 61.04.52
Chi es ication - Plan B (ul &u2 61.04.53
Sections 61.04.54
Elevations 61.04.55
9 tional Works - Schematic Plan 61.04.30 ALA
Demolition Plan 61.04.31
~
crchitecture ¢ interiors « sustainahleburdingdesign + planningdevelopmentstrategies
willfranklindesign ° 5: marystreetnoosavillegid4s66 * p.0.box i 354noosahcadsqid4s67
telo754743237 *tax0754741020 * [email protected]
Page 35
@
«Deliver To: 9 Pelican Street Tewantin Qld 4565 5447 1062
ALAN SINCLAIR & ASSOCIATES PTY LTD
PO BOX 217 NOOSA HEADS QLD 4567
PHONE 5442 4644 FACSIMILE 5442 4767
TRANSMITTAL OF DOCUMENTS
TRADE: Operational Works Application
TO Noosa Shire Council DATE 01.06.07
PROJECT 18 Douglas St Sunshine Beach | ATTENTION
DRAWING DESCRIPTION COPIES
Hydraulic Drawing by fan Bradford Plumbing Consulting
070386 -1A Application for Operational Works Site Plan 4 no.
Engineer Drawing by SCG Consulting Engineers
17108 - OW 1 Operational Works Plan 4 no.
BOQSA SHIRE COURCY
BTC A
és
é .
SENT FOR: For Information x Your Approval
Remarks Further submission of information to support Application for Operational
Works Approval to the above mentioned project. ( Receipt No.00291019:0001 )
( 014.2007.00001017.001 )
Page 36
DRAWING SIZE — Al
AND BURIED 300 INTO
900(#) GEO-FABRIC SILT
FENCE, FIXED TO SPIKES —-———— :
STABLE GROUND.
1200(L} 50 Sq. HDWD
SPIKES, 1800 ctrs DRIVE
600 INTO GROUND
SILT RENTENTION FENCE DETAIL GARAGE
“ge
a
wo
wo a wo — a w =
2 8 B | = Ss a 3 8 3
SLT_RETENTION lor] rs ial wo ~~ m ~ rm ww
a
THE CONTRACTOR IS TO INSTALL APPROVED SILT RETENTION = 2 = Y ° rm etd rm =
FENCES PRIOR 70 COMMENCING ANY EARTHWORKS. THE a 8B 8 B 2 2 ° E
FENCE IS 10 BE CONSTRUCTED ALONG THE LOWEST Ss S a 2 2 2 S =
’ 3
<
BOUNDARY AND RETURNED UP SIDE BOUNDARIES TO ENSURE
FULL STORMWATER ENTRAPMENT. SURFACE RUNOFF FROM
On D
AND SHALL NOT ENTER NIEGHBOURING ALLOTMENTS THROUGH
THE USE OF SURFACE BUNDING OR SCOUR PROTECTED
DRAINS. THE FENCE MUST REMAIN IN PLACE UNTIL SUCH
TIME THAT FINISHED LANDSCAPING AND DRAINAGE MEASURES
ARE INSTALLED
| RP BOUNDARY
Kerb Line Nominal
FFL 33.585 RI 33.000
3.
PROVIDE ALLOWANCE FOR REBUILDING EXISTING
BOUNDARY TIMBER PALING FENCE AND SCAVATER Fane Ng OOTAIL
REINSTATEMENT OF ADJACENT GARDENS/GRASSED .
AREAS. SEEK ADJACENT PROPERTY BODY
CORPORATE APPROVAL PRIOR TO WORKS.
boundary line 32.187m
wv _—-
eo . So v7
SLT — ~ : oe
douglas street
\ | ' =
ri & ‘ \ ° '
\ .. PROPOSED FOOL Sone? |e | \ ae 1
14 ‘ ) = » ° 1
, \ = 1 ~ 1
e| SB < 2 | \
5! \ *O \ I \ }
wo
Ry . | \ ‘ EXISTING DRIVEWAY TO
®) \ y a a fe BE REMOVED.
s | REFER TO HYDRAULICS CONSULTANTS \ \ h_ } casing ivy tove revert _
® a, ( DOCUMENTATION FOR SITE DRAINAGE \ UMS
Cc 3 5 DETAILS \ ’ 2 \ |
8 + | ” \ \ — = | 1
OD Block retaining wall & 3 \ 20-40mm AGGREGATE
— | LS | HARD STAND OVERLAY
| ‘ a ( 5 FOR DELIVERY'S DURING
W l S \ AS CONSTRUCTION.
; 1 i ' f = ——
oO | UI ) SS \
lg 5 cs |
_ _ _ Driveway 2 2 \ |
oe orn & “% 7 Rr 7 Fe - le e h—-—4
a 5 / !
\ 6 ‘sy ' | I
» \ - g aa | #
3° Block retaining wall = S of \ | _ New Driveway ne f . ~
t \
O | \ a DRIVEWAY CROSS OVER DETAILS
| 1 3 ' TO BE IN ACCORDANCE WITH
{ NOOSA SHIRE COUNCIL'S STD
l _ ' DRAWINGS 9005 & 9019.
z eI 3 2 |
° EXISTING POOL £ || ‘g s Ss |
a \ & 2 E= — 3 =| e ; ! NEW KERB & CHANNELING TO BE
-— i f = 3 x! iN | 9 ' REINSTATED TO NOOSA SHIRE COUNCIL
— B a 2 , & | ' STANDARDS.
EXISTING STORM ; > ; |
WATER INLET. = 3
’ S$ { | ny
3 \ | gh !
1 i | }
J I
se t RS / \ i
Bs a PT’ ° ‘ast
boundary line 32.187m Z ‘ K Pe ‘s } LEGEND
PROVIDE ALLOWANCE FOR REBUILDING EXISTING 7 \i g- ~~ INDICATES EXISTING SURFACE
SPRAYED RC FACING TO BOUNDARY TIMBER PALING FENCE AND ¥ 180 CONTOUR AND LEVEL TO AHD.
BUILDER TO MAINTAIN STABILITY EXCAVATED FACE 10 DETAIL. REINSTATEMENT OF ADJACENT GARDENS/GRASSED ! “7 -
AREAS, SEEK ADJACENT PROPERTY BODY SILT
OF AL, MEGHBOURNS STRUCTURES, CORPORATE APPROVAL PRIOR TD WORKS. =--S—~ SILT RETENTION FENCE TO DETAIL
CONCRET TRCN IO cats ae 2.60 INDICATES PROPOSED FINISHED SPOT
BATTERS TO PROTECT AGAINST SCOUR, SURFACE LEVELS TO AHO.
REFER DETAIL, <
+ EXISTING SURFACE SPOT LEVELS.
SITE PLAN — OPERAT! KS ra, INDICATES DIRECTION OF FALL
Scale 1: 100 TO FINISHED SPOON DRAINS.
EXISTING STRUCTURE /DWELLING
INCLUDING NEIGHBOURING
ALLOTMENTS
THE BUILDER /CONTRACTOR
SHALL CONFIRM ALL
RELEVANT LEVELS PRIOR TO
COMMENCING WORKS.
2
= 2 SLB2 Mesh
58 1000 middle SPRAYED 25MPa
| Tis Footie witHouT
PIERS |S FOUNDED
ABOVE CRITICAL DEPTH
LINE AND IS UNSTABLE.
THIS FOOTING IS FOUNDED
BELOW CRITICAL DEPTH
LINE AND 'S STABLE.
—~ EXCAVATION OR OTHER
PIERS OR UNDERPINNING FOUNDED
TRENCH.
BELOW THE CRITICAL DEPTH LINE
WOULD BE NEEDED TO SUPPORT
ANY FOOTING THAT IS FOUNDED
ABOVE THE CRITICAL DEPTH LINE.
NOTE:
CRITICAL DEPTH LINE DIAGRAM © THis DETAIL ALSO APPLIES TO EXISTING FOUNDATIONS
ON NEIGHBOURING PROPERTIES. SHEET PILING MUST
BE INSTALLED WHERE EXISTING FOOTINGS WILL BE
FOUNDED ABOVE ANY EXCAVATION CRITICAL DEPTH
UNE
|
|
LINE OF PROPOSED
|
|
1 CONCRETE FACING
SL72 MESH MIDDLE
SATURATE GROUND ADJACENT
EXCAVATION FOR A MINIMUM OF
24 HOURS PRIOR TO WORKS
RECEIVEn
Sow cut ond Compected COMMENCING. 1
breckout BARRIER, SEMI-MOUNTABLE, MOUNTABLE sond bed ™ 1 JUN 2007
back of kerb KERB & CHANNEL OR INVERT CROSSING. HOOSA SHIRE jw
bey ln
FRONT Counteg’ A!
TYPICAL SECTION ~ SPRAYED CONCRETE FACED EMBANKMENT
(Scale 1:20)
GENERAL:
1. Do not scole from this drawing.
2. All dimensions in mitimetres
3, Setting out dimensions ore to be obtained from the orchitectural
drawings.
4, Any discrepancies between these drawing and the orchitectural drowings
are to be referred to the engineer immediately.
5. The builder is responsible for locoling all existing services within and
adjacent the allotment and shall ensure that all new sorks ore in
accordance with the attached critical depth line diagram.
FOOTPATHS AND DRIVEWAYS:
1. Existing footpaths to be saw cut prior to removal
2. Crossings are not designed for commercial vehicles
4. Concrete driveway to be 125mm thk. excluding any finished treatments,
¢g. stamping
4. Concrete surface tolerance +5.0mm over 3.0m
5. Concrete N24 in accordance with AS 1379 and AS 3600
6. Reinforcement fabric to AS 1304, pieced central slab depth.
7. Expansion joints to be 10mm wide wet tooled with every 2nd mesh wire
cut olong joint.
8. One access point permitted for each allotment,
9. For curved driveways, maximum grades apply to inside edge of curve
10, Ait services to be located and protected as required prior to work
commencing
FLUNG NOTES:
~The site is to be scroped clear of all organic moterial and debris.
— The subgrade is ta be proot rolled with a wbrating steel drum roller to
achieve a minimum relative field density of 95% The compection is to be
sufficient to achieve a biow count of 7 blows per 300mm with on approved
Perth Sand Penetrometer for o depth of 1.Gm below excovoted level. Copies
of compaction test results shail be presented to SCG Consulting Engineers
for approval.
— Upon the written approval of the subgrade preperations by SCG Consulting
Engineers
the dlotmeni is to be filled to the specified levets,
— The fill materiol clean granular materia! (i.e. sand to a clayey sand in
accordance with ASt726} be free of any organk: materiol and have o clay
content of less thon 12% (Plasticity Index fess than 25% Linear shrinkage of
15%), The proposed material is to be inspected by SCG Consulting Engineers
prior to its removol to ensure its compatability,
— The fit is to be ploced and compacted in accordance with AS3798-1996
to a level sufficient to achieve a Level 1 certification with o minimum
relative field density of 95% Copies of compaction test results shall be
presented to SCG Consulting Engineers for approval
— Filing and compacting adjacent exisiting structures is to be in strict
accordance with the ossocioted details ond specifcations.
— Areos where existing structures or trees ore removed shall be backfiled
with the opproved fil material compacted in accordance with AS2B70~1996
to achieve o minimum relative field density of 95%
— Any foose or soft moterial uncovered in the site preparation shall be
removed and replaced with the approved fill materiof compacted in
occordance with AS2870-1996 to achieve a minimum relative field density
of 95%
— Site drainage ond silt protection meosures must be istalled prior to
construction commencing.
PAVEMENT NOTES:
1. Prior to plocement of pavement materiol the subgrade is to be stripped
to level. Any organic matter or debris is 1o be removed and reploced with
approved compacted moteria. The subgrode shall be proof rolled to o
minimum of 98% dry density as determined by compoction testing in
accordance with AS1289
2. Pavement materials shal! comply with the folowing main roods
department specification WRS11.05:
- Base course 10 consist of aggregate type 2.3, Grading B or C
3. Pavement material shall be extended o minimum of 150mm beyond the
edge of drive and shall be a minimum of 100mm thick U.N.O.
4. Base ond sub~base courses are to be compocted in loyers not
exceeding 150mm in thickness to achieve 95% dry density or greater with
one test per 200mm thickness of each layer.
5. AN compaction testing results to be presented to the engineer for
approval prior to proceeding to the next stage of construction.
DO NOT SCALE FROM THIS DRAWING
Tha design ond associated detoils coniained on this and associnied drowings ore
copyright ond ore not to be used or reproduced without the written permission of
‘SCG Consulting Engineers.
DEBUILO TiA
Gag CONSULTING ENGINEERS
structural - civil - geotechnical
ABN 40 098 481 899
18 DUKE STREET SUNSHINE BEACH QLD.4567
OPERATIONAL WORKS PLAN
Project
18 Douglas Street
SUNSHINE BEACH QLD 4567
Dawe. 17108-OW ia
Page 37
17.000m(approx)
a n
New 150 connects to existing gully pit.
The connection is to be performedin
compliance with council approval.
o—
3,000 litre inground rainwater
storage tank and water reuse supply
to be equal to "Action Tanks" split
water SM —
First flush divertor and leaf (
po
Split system control box with.
a tomdfic mains water diversion,
contro} valve & dev.
throu 2 is to
the trap.
Fess polston chee te
charge
rougn a riser Section on
‘|
. “
cr
|
A |
|
; |
“t
Lo . yy
<=
© SE187
obrydary
Mini 225 wid
Win 292 wide lena
boundary ling 22.63Um
21.500m(approx)
exist spring ~
hydrant
SITE/LEVEL ONE PLAN-ALLSERVICES
Scale 1:100
+
ce (-)-% —.—
$B06/29/02
LL33.230
ee Connect to existing 100 kerb outlet.
3,000 litre inground rainwater
storage tank and water reuse supply
to be equal to “Action Tanks" split
water system.
First fl iyertor and |
First flush di Fo FEA ks".
f
Split system control box with
autometic m ips water diversion,
control valve |& dev.
Existing water meter.
NOTES-PLUMBING & DRAINAGE
1.AHl work is to comply with the Queensland Plumbing & Drainage Act 2002 and local authority requirements.
2. These drawings are diagrammatic only. Use dimensioned building construction plans for any set out
requirements.
3.Obtain all necessary approvals and pay all fees due.
4 The contractor is to visit the site to be fully aware of existing services and site conditions prior to
commencement of work.
5.Cold water pipework to be a minimum of 15mm@ to individual outlets and 2Omm@ or greater to more than
one outlet(uno)
6.Hot water pipework to be a minimum of 15mm%% (uno)
7.The contractor is to determine new drainage can be installed with correct grade and cover prior to
commencement of work.
8.All inground sanitary drainage shall be 100@ installed at minimum 1 in 60 grade.
9.Plumbing services that penetrate fire rated walls &floors must be installed to comply with the required
fire resistance level.
10.Backflow prevention devices to be installed as required by the local authority.
11. Water supply pipe sizes indicated on the drawings are equivalent to type “B" copper tube(refer table 1.1
of AS/NZS$3500.1). If using an alternative material the internal diameter of the pipe shall be equal to or
greater than that indicated on these drawings.
All hot water o ed primarily for personal hygiene purposes are to be temperature controlled to a
maximum of 50°C(uno).
NOTES-STORMWATER
1.All work is to comply with the Building Code of Australia, AS/NZS
3500.3 and local authority requirements.
2.These drawings are diagrammatic only. Use dimensioned building
construction plans for any set out requirements.
3.Obtain all necessary approvals and pay all fees due.
4.The contractor is to visit the site to be fully aware of existing
services and site conditions prior to commencement of work.
5.Stormwater drainage shall be installed at minimum grade of 1 in
100 (uno).
6.Inground stormwater drainage to be a minimum of 100mm@(uno).
ABBREVIATIONS
aav air admittance valve
b basin
cw cold water
dev double check valve
dp downpipe
dd drainage dropper
ej expansion joint
fsl finished surface level
fwg floor waste gully
he hose cock
hw heated water
hwu hot water unit
ios inspection opening to surface
il invert level
ll lid level
nts not to scale
org overflow relief gully ,
rpzd reduced pressure zone device ‘
sl surface level
shr shower
s sink
tg test gate
uno unless noted otherwise
we water closet
LEGEND
Sanitary drainage
/plumbing
Cold water —_— .
Heated water ae
Stored water
Stormwater drainage ——————————
Exist water see
Exist sewer -—— + es
| fan bradford
| pRimmblng consultants
PO BOX 334 PEREGIAN BEACH 04573
| PH (07) 54483875 FAX (07) 54483875
EMAIL - [email protected]
BSA LICENCE NUMBER:- 1027868
LICENCE CLASS:- HYDRAULIC SERVICES DESIGN
(INCLUDING ON SITE WASTEWATER MANAGEMENT)
PROJECT
PROPOSED DUPLEX DEVELOPMENT
18 DOUGLAS STREET
SUNSHINE BEACH
TALE
HYDRAULIC SERVICES
SITE/LEVEL ONE PLAN - ALL SERVICES,
NOTES - PLUMBING & DRAINAGE,
NOTES - STORMWATER,
ABBREVIATIONS, LEGEND
cuent DYNAMIC CAFES DWG NO REV
o7036-1 | A
A1 SCALE 1:100 U.N.O.
SHEET 1 OF >
Page 38
ion
LAND USE SECTION FEES
RECEIPT TYPE
SALE OF DOCUMENTS
Superseded Planning Scheme Documentation 520
Copy of Permit/Approval Letter 110
The Noosa Plan Documentation 111
APPLICATION FEES
Material Change of Use - Code/Impact
Consistent §21
Inconsistent 521
Assessment under Superseded Planning Scheme 521
Modification to a Development Permit 521
Extension of a Currency Period . §21
Operational Works - Landscaping 480-00 521
@ Bldg Work assessable against the Planning Scheme 521
PRE LODGEMENT REVIEW
Half Hour §22
One Hour §22
ADVERTISING
Purchase Advertised Applications 523
JETTIES
Jetty Application Fee 524
* Jetty Bond 51
(Category 4)
BONDS
Performance Bond 51
(Category 9)
SIGNS
Registration Fee 222
seu FEE
Search of Land Use Section file 112
Liquor Licensing Request 113
TOTAL $ 9F0.00
NAME: Bynanie lapis Pty Ltd
ADDRESS: 0 Box w7
Noosa tHeady BW 4567
FILENO: _ 2007] 1017 paATE: 70 -{- 07
RECEIPT NO: A O} g Signature of TP Officer: _/. H
AUTHORITY NO:
14] zoor [1017/1
Page 39
DEVELOPMENT FEES & CONTRIBUTIONS (Cashier: Please Refum to Admin Officer, Development) P:/Land DevelopmentFEES & CONTRIBUTIONS/DEVELOPMENT FEES.doc APPLICATION AND GENERAL FEES AMOUNT | RECEIPT TYPE | BONDS - Bond Refund Details Application Fees ; 540 Payee Name: ~ Road / Drainage Pian Exam og & 541 Address: Road / Drainage Field Inspection ue 50 542 Legal Document Examination 543 Sealing Fee - Survey Plans, Legal Documents 544 Sale of Documents, Policy Lists, Misc 545 CALCULATIONS 7 Bonding Admin Fee (Contributions, uncompleted works) §46 Lot Calculation : Closed Circuit TV Inspection §88 Pre-lodgement Meeting Fee 549 ‘CONTRIBUTIONS _ AMOUNT | RECEIPT TYPE | Plan Examination Calculation Developer Contribution - Landscaping 550 Developer Contribution ~ Road Other than PSP 553 Developer Contribution - Drainage Other than PSP §54 Developer Contribution --Pathway Other than PSP 685 Inspection Calculation Developer Contrib. — in Lieu Off St Parking (PSP13 Car parking) 556 Developer Contribution - Other Parks and Community 580 ROADWORKS CONTRIBUTIONS \CS - Community Land (Not currently active) 560 Catchment: ICS - Public Transport 561 ICS - Sewerage (PSP Rural) 557 Road/Section: ICS ~ Sewerage (PSP Coastal) 613 ICS - Sewerage - South Peregian (PSP Maroochy) 681 APPLICATION DETAILS a ICS - Water Supply (PSP) 614 Payee Name: ICS ~ Sport and Recreation Land (PSP Parks) 589 Address: ICS - Drainage (PSP Noosaville Master & Ward Street) 581 ICS — Road (CMRNICP) If BA not entered then use 594 583 ICS - Pathway (PSP) 584 Development Location: Total of Fees Paid (Excluding Bonds) $454 f-00 CPI Date: AMOUNT | RECEIPT TYPE | File Numbers or Reference: Security Deposits/Performance/Maintenance/Uncompleted Works Bond 51 (Cat 9) Total of Fees Paid (Including Bonds) $ /04£-00 ReceiNor aL IY of ader | Receipt Date: Zoller f ! 1
Used in these records
07/1017 - Op Works - landscaping, Acess &/or Carparking [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.