07/1017 - Op Works - landscaping, Acess &/or Carparking [As Published] · 142007.1017
w
the provision of dense screening vegetation along the Douglas Lane property boundary
and setback area to screen the swimming pool, basement walls and any fencing.
the provision of dense screening vegetation along the Douglas Street property boundary
and setback area. particularly between the swimming pool and front property boundary to
screen the swimming poo! from the sweet Landscaping shail enhance the amenity of the
streetscape.
Please refer to the landscaping consultant's documentation & revised & developed
architectural documentation submitted as the Operational Works application for further
assessment. In general, the specific intents of this condition can be met.
Existing ees on the site and within road reserves are to be retained, except where required to be
removed due to building operations or the conduct of the approved use.
Apart from necessary infrastructural upgrades carried out within the footpath / road
reserve, only the driveway installation will affect the ability to retain this region of
vegetation.
All fencing shall be setback at least 1 rnetre from the front property boundary (Douglas Street), with at
least half of the fencing setback 2 metres. The area of land between the fence and the front property
boundary shall be densely landscaped to screen any fencing from the street
Please refer to the landscaping Architect's documentation & revised & developed
Architectural documentation submitted as the Operational Works application for further
assessment. In general, the specific intents of this condition can be met.
The swimming poo! located in the north western corner of the site shail not project greater than |
metre above natural ground level.
Acknowledgement of condition that the pool cannot be any greater than Im above
natural ground, however, clearer interpretation is required. To explain further, please
consider the following description:
The site slopes gently away from the front boundary. 6 metres back and up 1 metre will
dictate the pool height. This new pool level translates now to be 700m lower than the
approved level 1 RL. This new pool level is 1.9 metres lower than the design provided in
the original documentation related to this Decision Notice.
This pool! level, when considered back towards the front boundary, wil! become
increasingly tess than 1 metre above the natural ground. The pool finishes against a front
wall that is set back 1.0 metres from the front boundary, with landscaping between the
wail and boundary to comply with Condition 4 (and its parts), and Condition 6. The pool
will extend towards the building behind the 6 metre setback line for a distance of 3.5
metres and as a result, the pool {and its balcony end adjoining the main building}
transtates to being greater than 1 metre above ground level. To the best of our
understanding, this construction height is permissible, however, this portion behind the 6
m setback will now constitute site cover area of which we have sufficient unused to still fall
within the permissible total
Operational Works documentation reflects this scenario.
Any deck or balcony areas are not be enclosed with shutters. glass panelling or the like, thus remaining
as open structures.
Acknowledgement of this condition is noted. All balconies or deck areas that are not
enclosed will remain as open structures. Developed documentation submitted for
Operational Works approval will reflect this condition in detail.
Ail hot water systems installed shalt be either solar systems; electric heat pump systems; or gas systems
(LPG or natural}.
Seeking advise from hydraulic engineer and owners for clarification of hot water system
intentions.
architecture « interiors ¢ sustainablebuildingdesign « planningdeveiopmentstrategies
willfranklindesign « s 1marystreetnoosavilleqid4566 « p.o.box1354noosaheadsqid4567
telo754743237 * fax0754741020 * [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1017 - Op Works - landscaping, Acess &/or Carparking [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.