Site Control —
Site control measures are to be followed to prevent erosion and sediment
export from leaving the site. A plan detailing the methods of control may be
required by council.
Noise emission from mechanical equipments shall comply with the local
council's Local Law No. 12 \
In the instance of demolition, a waste management plan may be required by
council.
During the course of construction, property boundary fences are to be
maintained and replaced if necessary.
Energy Efficiency Requirements
50mm Anticon insulation to be installed below roofing.
R2.5 Polywoo! ceiling insulation batts to be installed in roof space.
Vapour permeable RFL to all exterior framed walls.
R15 wall batts fo all exterior framed walls.
All external doors & windows to be fitted with a seal to resrict air infiltration
and where glazed fo be fitted with Pilkington Evergreen’ glass.
All exhaust fans to conditioned spaces to be fitted with a self closing damper.
|
|
site drainage incl. basement (RL 33385)
is gravity fed to douglas lane (RL 32.37)
Hot water system shall be fitted with a heat trap within 1m of the outlet of the
heater and before the first branch.
douglas lane ]
eee Stormwater, Sewer and Water Supply
Roof & surface stormwater to be disposed of in accordance with council
requirements.
The site shall be connected to coucil's existing sewerage reticulating systems
and constructed in accordance with council standards & requirements.
The site shall be connected to council's existing town water supply and
constructed rainwater tanks are to be provided as per council requirements.
existing timber fencing
to be retained
lane to be retained
| | single access to douglas
\
|
|
boundary line 22.630m General Notes
The builder shall check and verify all dimensions and verify all errors and
omissions to the Architect
Do not scale these drawings,
Drawings shall not be used for construction purposes until issued by the
Architect for construction.
existing swiming pool
to be retained
Refer fo Engineering documentation for structural identification.
Refer to Hydraulic Engineer for plumbing design and layout.
Driveway cross-over and layback fo be constructed in accordance with local
cover 43.896
line 32.13)7™m
|
|
i
; areecering See Council regulations and design requirements.
| ne Refer fo Window and Door Schedule.
Smoke detectors to be installed in accordance with BCA regulations.
t Waterproofing through-out to be applied as per manufacturers specification.
Trusses to be installed as per manufacturers specification.
Termite protection to be carried out in accordance with Australian Standards,
j
i
and B.C.A. requirements. |
t
t
!
i
t
boundary line 32.18/7™m
Bao
I
lessee All Windows & Doors to comply with relevant BCA regulations & Australian }
Jed Standards,
Lee Balustrading installation and constructionto comply with BCA regulations and
relevant Australian Standards,
{ Pool fencing and gate construction and ressucitation signs to be installed to
jraed comply with BCA regulations and relevant Australian Standards,
rainwater tank locations
3000 litre capa
eee aise | Termite Protection
refer to hydraulics engineers i i
documents ied The building shall be protected from subterranean termites by approved | hee
physical and/or chemical barriers in accordance with AS3660.1. The precise
method of protection shall be determined by the owners and/or builder only
after consultation with a licensed pest control operator. This information then
shall be advised to the local government or licensed certifier prior to or at the
| time of lodgement of the building permit approval. |
ensure that any physical barriers are kept clear |
of garden beds or soil build up, that any chemical barriers remain undisturbed,
and that annual inspections (plus eradication as necessary) are carried out
i throughout the life of the building by a licenced pest control operator in
ay accordance with AS3660.1.
proposed locations of existing
poo! filtration system
all vehicles to leave site |
na forward motion i
refer to civil eng, documents
for turning circle compliance
scr |
Peouiiaac|
proposed location of air condition units.
refer to mechanical engineers documents
| |
Pt eel
bs Li NS ra
| eee
Bl dap pie na
carparking shall comply with all
australian standards, Refer to civil eng.
documents for detailing.
grated trench drains
refer to hydraulic engineers documents.
~ aluminium louvred screen- —
ia a
1
7
i
stair access to ground to rear of
stair access to ground to pool property
proposed location unit 1
swiming pool filtration system
retaining walls
to engineers specification
A 20-05-07 Commencment of issue |
landscaping to landscape
architects details
driveway to be constructed in accordance new stair to unit 2
to council design standards and all relevant
australian standards. Refer to civil eng.
documentation for detailing.
landscaping to landscape
architects details
2000m high wall
2000m high wall
boundary line 22.630m |
connection to town water
proposed location of water metres
refer to hydraulic engineers
documentation
footpath & landscaping detail to
landscape architects detail
retain existing
allredundant crossovers to be
removed and replaced with
new kerb and channel In
accordance with council standards
Will Franklin
[email protected]
Documentation
David Watson i
Eas [email protected]
Job No Drawing No.
JJ.61.04 61.04.30 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1017 - Op Works - landscaping, Acess &/or Carparking [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.